Laserfiche WebLink
• _ <br /> Hi Drew, <br /> I work on Clover's team assisting with this project. Attached are the Egress Sheets for the HCS and CSO Lobby tenant <br /> improvements for your review. <br /> Clover will be in touch with you tomorrow to review and discuss further. <br /> Thanks, <br /> Tina <br /> From: Drew Martin <dmartin@everettwa.gov> <br /> Sent:Wednesday,January 16, 2019 12:50 PM <br /> To: Clover Schuler<clover@magellanarchitects.com> <br /> Subject:City of Everett Permit Services:840 N Broadway(B1810-012)-Second Building Review <br /> Clover, <br /> This email briefly recaps our conversation regarding this project. As discussed,the outstanding issues are very similar to <br /> B1810-011. Most comments still require some action to fully resolve. The following comments do not require further <br /> action: 1, 2, and 4b. Please also make sure the following issues are addressed: <br /> For comment 4:The north waiting area exit goes down the stairs with a door that doesn't swing in the direction of <br /> travel. The egress should be changed to the adjacent door leading directly outside. The required exit signs and egress <br /> lighting should be provided or noted as existing. <br /> For comment 5. The south egress does down stairs to the first story exit. A partial plan showing the remainder of the <br /> exist route should be provided. The required exit signs and egress lighting should be provided or noted as existing. <br /> CELEBRATING Drew Martin, P.E.,S.E. <br /> _ ! 1 Associate Engineer—Commercial Plans Examiner I Permit Services <br /> YEARS 425.257.8813 13200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> A story worth telling everettwa.gov/permits I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> 2/� <br />