Laserfiche WebLink
INSPECTION REPORT <br /> i.%,/iii, ,,,, * <br /> r Date Permit: L.— / , 03 f <br /> Contractor: <br /> F° Owner: <br /> -.._43;-::''Lf-= 4Ett;e:g0 <br /> Site Address: 2 0 O er2c4D G<JAY 4 <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grou .' . ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> PI Bill g Gri._ ❑Drywall Nailing ❑Plumbing Final <br /> F ectrical F" al ❑Shear Nailing GAS PIPE <br /> SITE !' ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> I ooting drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PE' _ - <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION `` <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> Inspector: � 7. <br /> Date: _Wqk <br /> EIR(10/06) DATABAR,INC. <br />