Laserfiche WebLink
6/9/2021 Page <br /> 9:19:19AM City of Everett <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1703-011 Site Address 1113 E CASINO RD <br /> Applied 3/20/2017 Applicant RAD DESIGN Lot 3 <br /> Approved 5/15/2017 Owner G2 CONTRACTING LLC Block <br /> Issued 7/17/2017 Contractor G-2 Contracting LLC Tract <br /> Parent Permit No. PW1506-026 Description NEW SFR DETACHED LOT 3 <br /> Notes <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 7/20/2017 7/20/2017 UFER Ground KMK Approval OK to pour <br /> 7/20/2017 7/20/2017 Footing KMK Approval OK to pour <br /> 7/20/2017 7/20/2017 Foundation KMK Approval OK to pour <br /> 9/14/2017 9/14/2017 Bldg Other KMK PtAppr-CorrReq 1.Underfloor OK <br /> 2.Provide detail for SW-3(see schedule <br /> S-2.0) <br /> 10/26/2017 10/26/2017 ShearNailing KMK Approval <br /> 11/29/2017 11/29/2017 PLUMB ROUGH DXW CORRECTION Don't know what proper address is.Must be <br /> IN same as permit.Waste and water must have <br /> test. <br /> 12/27/2017 12/27/2017 PLUMB ROUGH DXW APPROVAL As noted Insulate water lines in garage. <br /> IN <br /> 12/27/2017 12/27/2017 MECH GAS DXW APPROVAL 17 PSI <br /> ROUGH IN <br /> 12/27/2017 12/27/2017 MECH ROUGH IN DXW CORRECTION Complete exhaust fan duct. <br /> Whole house fan to be 1 sone or less. <br /> Inspector needs paperwork. <br /> Inspector needs to see clearance at fireplace <br /> exhaust outside wall. <br /> Manufacturers specs for furnace required. <br /> Elbow heat shield very loose at fireplace- <br /> fix. <br /> Fireplace chase to be capped off. <br /> Inspector needs specs on insulation in crawl <br /> for hard duct.R-8 minimum required. <br /> 3/1/2018 3/1/2018 MECH 04-ROUGH DXW CORRECTION Corrections not complete <br /> IN As noted-if not correct at next inspection <br /> fee will be required. <br /> 3/12/2018 3/12/2018 MECH 04-ROUGH DXW APPROVAL As noted Complete 1st floor laundry exhaust to fan. <br /> IN Complete fireplace chase on all 3 buildings. <br /> At final,must have paperwork on inuslation <br /> in crawl R-8 required. <br /> 3/12/2018 3/12/2018 BLDG DWF CORRECTION Need electrical rough <br /> 08-FRAMING in approval <br /> 3/21/2018 3/21/2018 BLDG DWF CORRECTION Seismic strap top plates over 50%cut outs <br /> 08-FRAMING Complete HDU8-install <br /> Seismic strap post/beam connection <br /> Stair stringers-A35 brackets. <br /> 3/22/2018 3/22/2018 BLDG DWF APPROVAL As noted Install a-35's on stair stringers lower flight <br /> 08-FRAMING section,then OK to cover. <br /> 4/3/2018 4/3/2018 BLDG DWF APPROVAL As noted OK to cover <br /> 11-INSULATION Provide insulation cert and blower test <br /> results at final. <br /> 2/19/2019 2/19/2019 PERMIT TKJ APPROVAL <br /> EXTENSION <br /> 3/7/2019 3/7/2019 PLUMB 06-FINAL DXW CORRECTION Phone:425-531-1747 <br /> (3/7/2019 12:17 PM DXW) <br /> 6 inches of metal pipe required out of relief <br /> valve complete dishwasher hook up <br /> 3/7/2019 3/7/2019 GAS 03-FINAL DXW APPROVAL <br /> INSP12 CRWs YST E M <br />