Laserfiche WebLink
6/9/2021 Page 2 <br /> City of Everett <br /> ,) <br /> 9:31:44AM <br /> INSPECTION ACTIVITY REPORT <br /> 3/27/2018 3/27/2018 BLDG 13-OTHER TMB CORRECTION 1.Front hold downs are missing nuts and <br /> hardware. <br /> 2.Missing wall stud at top of stairs. <br /> 3.Remove attic brace hanging into room. <br /> 4.Joist cut through above sliding door <br /> requires repair. <br /> 5.Fan duct at batch fan is not connected. <br /> 6.Provide permits. <br /> 3/28/2018 3/28/2018 BLDG DWF CORRECTION Need to complete corrections from 3/27/18. <br /> 08-FRAMING Need plumbing,mechanical,and electrical <br /> rough ins. <br /> 3/30/2018 3/30/2018 BLDG TMB APPROVAL <br /> 08-FRAMING <br /> 4/3/2018 4/3/2018 BLDG DWF APPROVAL As noted OK to cover <br /> 11-INSULATION Provide insulation certification at building <br /> final. <br /> Provide blower door test results <br /> 2/20/2019 2/20/2019 BLDG 15-FINAL DWF NOT READY Phone:425-531-1747 <br /> Need Mechanical,Plumbing,Public Works <br /> finals <br /> Also,insulation cert and blower door test <br /> results before Building Final inspection. <br /> (2/20/2019 9:14 AM DWF) <br /> Need mechanical,plumbing and public <br /> works finals. <br /> Also need a copy insulation certificate and <br /> blower door test results before building <br /> final inspection. <br /> (2/20/2019 11:43 AM DWF) <br /> Need Mechanical,plumbing and public <br /> works finals. <br /> Building-need to provide a copy of <br /> insulation certificate,blower door test <br /> results. <br /> 3/7/2019 3/7/2019 MECH 06-FINAL DXW CORRECTION Phone:425-531-1747 <br /> (3/7/2019 12:08 PM DXW) <br /> ladder required to see combustion air in <br /> attic.b-vent to have 1 inch clearance in <br /> ceiling. <br /> 24 hour timer required for a whole house <br /> fan <br /> 3/7/2019 3/7/2019 PLUMB 06-FINAL DXW CORRECTION Phone:425-531-1747 <br /> (3/7/2019 12:15 PM DXW) <br /> HWT relief valve to have 6"metal pipe out <br /> of valve. <br /> complete 90 on relief line out side. <br /> 3/7/2019 3/7/2019 GAS 03-FINAL DXW APPROVAL <br /> 3/19/2019 3/19/2019 PLUMB 06-FINAL DXW APPROVAL eTRAKiT Inspection 3/17/2019 8:19 PM <br /> Request <br /> Contact Name:Troy Grasseth <br /> Site Address:1117 E CASINO RD <br /> Phone:4255311747 <br /> e-Mail:g2contracting@live.com <br /> 3/19/2019 3/19/2019 MECH 06-FINAL DXW APPROVAL eTRAKiT Inspection 3/17/2019 8:19 PM <br /> Request <br /> Contact Name:Troy Grasseth <br /> Site Address: 1117 E CASINO RD <br /> Phone:4255311747 <br /> e-Mail:g2contracting@live.com <br /> 4/17/2019 4/17/2019 BLDG 15-FINAL DWF NOT READY Need electrical final 4/16/2019 2:26 PM Troy Grasseth <br /> Contact Name:Troy Grasseth <br /> Site Address: 1117 E CASINO RD <br /> Phone:4255311747 <br /> e-Mail:g2contracting@live.com <br /> INSP12 CRWSYSmmM <br />