Laserfiche WebLink
6/29/2021 Page <br /> City of Everett <br /> 1:20:50PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. B 1803-040 Site Address 4800 DOGWOOD DR <br /> Applied 3/22/2018 Applicant Lot <br /> Approved 10/29/2018 Owner VIEW RIDGE COMMUNITY CHURCH Block <br /> Issued 1/23/2019 Contractor ACACIA CONSTRUCTION Tract <br /> Parent Permit No. PW 1805-049 Description ADD CLASSROOMS TO EXISTING CHURCH-VIEW RIDGE CC <br /> Notes FIRE SUPRESSIONS REQUIRED.LANDSCAPE/BUFFER INSP PRIOR TO FINAL APPROVAL. <br /> CONTACT TERESA WELDON @ 425-257-8731 OR tweldon@everettwa.gov. <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> *NO INSPECTION PTEC eTRAKiT Inspection 10/27/2019 5:01 PM Hal Bartley <br /> CURRENTLY Request <br /> Contact Name:Hal Bartley <br /> Site Address:4800 DOGWOOD DR <br /> Phone:3603200239 <br /> e-Mail:hdougbartley@yahoo.com <br /> (Canceled-eTRAKiT-10/27/2019 5:03:53 <br /> PM) <br /> 5/8/2019 5/8/2019 BLDG KMK OTHER eTRAKiT Inspection 5/7/2019 9:35 PM Hal Bartley <br /> 02-FOOTING/SETB Request <br /> Contact Name:Hal Bartley <br /> Site Address:4800 DOGWOOD DR <br /> Phone:3603200239 <br /> e-Mail:hdougbartley@yahoo.com <br /> (5/8/2019 3:38 PM KMK) <br /> Cancelled <br /> 5/8/2019 5/8/2019 BLDG KMK CORRECTION (5/8/2019 3:38 PM KMK) <br /> 02-FOOTING/SETB Please see S-1 page for list of special <br /> inspections required for this job. <br /> Inspections include soils,concrete, <br /> reinforcement,anchoring,wood <br /> construction,and structural observation. <br /> Please provide special inspection reports <br /> and final letters verifying that all work has <br /> been done per plan. <br /> 5/10/2019 5/10/2019 BLDG KMK CORRECTION (5/10/2019 2:34 PM KMK) <br /> 01-CONSULTATIO 1.Provide Geo soils testing report before <br /> next concrete pour. <br /> 2.Provide letter from engineer verifying <br /> exterior footing size needed,and inspection <br /> reports verifying that it was done per plan. <br /> 5/23/2019 5/23/2019 BLDG KMK CORRECTION AM Inspection requested <br /> 03-FOUNDATION <br /> (5/21/2019 11:56 AM KMK) <br /> KMK changed Inspection Date/Time from <br /> 05/21/2019 to 05/22/2019 <br /> (5/22/2019 3:39 PM KMK) <br /> KMK changed Inspection Date/Time from <br /> 05/22/2019 to 05/23/2019 <br /> (5/23/2019 3:20 PM KMK) <br /> Please provide special inspection reports <br /> 6/5/2019 6/5/2019 BLDG 14-OTHER KMK OTHER Phone:360-320-0239 <br /> (6/5/2019 3:34 PM KMK) <br /> Cancelled <br /> 8/5/2019 8/5/2019 PLUMB SDP APPROVAL Pending plumbiing 360-320-0239 <br /> 02-GROUND permit <br /> am if possible <br /> INSP12 <br /> C/?WSYSTEM <br />