My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4800 DOGWOOD DR 2022-02-28
>
Address Records
>
DOGWOOD DR
>
4800
>
4800 DOGWOOD DR 2022-02-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2022 9:31:47 AM
Creation date
7/12/2021 11:36:26 AM
Metadata
Fields
Template:
Address Document
Street Name
DOGWOOD DR
Street Number
4800
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> View Ridge Comm.Church Add. <br /> Minimum Requirement # 2: SWPPP Narrative <br />• Element#1: Mark Clearing Limits <br /> Clearing limits have been shown on the SWPPP Plan. <br /> Element#2: Establish Construction Entrance <br /> The existing driveway entrance accessing Dogwood Drive is to serve as construction <br />• entrance. All vehicles shall be free of debris prior to leaving the site. <br /> Element#3: Control Flow Rates <br /> Flow rates during construction are to be contained through the installation of a temporary <br /> silt fencing on the downstream edge of the clearing limits. <br />• <br /> Element#4: Install Sediment Controls <br /> Sediment controls mainly consist of installation of a temporary silt fencing on the <br /> downstream edge of the clearing limits. <br /> Element# 5: Stabilize Soils <br />• All soils disturbed during site grading will be stabilized by use of the most appropriate <br /> BMP method available. These consist of short-term and long-term solutions. Short-term <br /> methods consist of compaction of the soils by vibratory roller or bulldozer. Long-term <br /> methods consist of straw covering over the soils (this is in the case of the project becoming <br /> dormant for greater than 1 month). At this time no wintertime grading or construction <br />• activities will occur. During construction periods longer than 1 working week (7 days) <br /> where the soils are exposed and un-worked will use the proscribed methods in the Storm <br /> Water Management Manual for Western Washington to reduce sedimentation transported <br /> offsite. If winter grading is conducted, all exposed soils shall be covered within 2 days. <br />• Element# 6: Protect Slopes <br /> On-site steep slopes lie outside the project clearing limits and will be protected with well- <br /> defined clearing limits and silt fencing. <br /> Element#7: Protect Drain Inlets <br />• All catch basins within 500 feet downstream of the site will be protected with catch basin <br /> sediment inserts. <br /> Element# 8: Stabilize Channels and Outlets <br /> Channels and drainage outlets are not needed around the proposed development area on <br />• site.No stabilization is necessary. Existing channels or drainage outlets located within 500- <br /> feet of the property of the property should be routinely inspected for debris that may dam <br /> and/or aid erosion. _ <br /> Element#9: Control Pollutants <br /> All pollutants from construction vehicles will be contained and disposed of in the approved <br />• manner consistent with state environmental policies. Any vehicle maintenance will be <br /> performed by authorized mechanics using drip pans and waste containment vessels. All <br /> pollutants will be disposed offsite at approved facilities. <br />• WESTERN ENGINEERS,INC. 10 PROJECT:17-1619-A <br />
The URL can be used to link to this page
Your browser does not support the video tag.