Laserfiche WebLink
• View Ridge Comm.Church Add. <br /> Minimum Requirement# 7: Flow Control <br />• <br /> Due to the site proposing less than 5,000 sf of new/replaced pollution generating hard <br /> surfaces, conversion of less than 3/ acres native vegetation to lawn, and conversion of <br /> less than 2.5 acres native vegetation to pasture, flow control is not required. <br /> Site Summary <br />• Total Property Area = 33,750 sf. (1.528 Ac.) <br /> Disturbance Area = 10,000 sf. <br /> Existing Site <br /> On-Site Impervious area: <br /> Existing Church Roof = 3,010 sf. <br />• *Existing Concrete Pads and Walkways= 1,090 sf. <br /> Existing Asphalt Parking Lot =10,270 sf. <br /> Existing Gravel Parking Area = 6,060 sf. <br /> Total =20,430 sf. (0.469 Ac.) <br />• *Note: Sidewalk and stair areas beneath roof overhangs are not calculated. <br /> Proposed Site <br /> On-Site Impervious area: <br /> Existing Church Roof = 3,010 sf. <br /> *Existing Concrete Pads and Walkways= 1,090 sf. <br />• <br /> Existing Asphalt Parking Lot = 9,160 sf. <br /> Proposed Church Addition Roof = 2,040 sf. <br /> Proposed 5' Walkway/ADA Ramp = 930 sf. <br /> *Proposed Parking Lot Paving = 600 sf. <br /> Total =16,830 sf. (0.378 Ac.) <br />• *Note: Sidewalk and stair areas beneath roof overhangs are not calculated. <br /> Total New/Replaced Hardscape = 3,570 sf. (0.074 Ac.) <br /> On-Site Pervious area: <br />• <br /> New Lawn and Landscaping = 6,430 sf. (0.147 Ac.) <br /> All new lawn and landscaped areas are to be covered with 8" depth imported topsoil. <br /> Refer to soil amendment documents in Appendix III for more information. <br />• <br />• <br />• WESTERN ENGINEERS,INC. 13 PROJECT:17-1619-A <br />