My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4800 DOGWOOD DR 2022-02-28
>
Address Records
>
DOGWOOD DR
>
4800
>
4800 DOGWOOD DR 2022-02-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2022 9:31:47 AM
Creation date
7/12/2021 11:36:26 AM
Metadata
Fields
Template:
Address Document
Street Name
DOGWOOD DR
Street Number
4800
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring Reports <br /> Monitoring reports shall be submitted in the fall of each year during the monitoring period. As <br /> applicable, monitoring reports must include descriptions / data for: <br /> 1) Site plan and vicinity map; <br /> 2) Historic description of project,including date of installation, current year of <br /> monitoring, restatement of mitigation / restoration goals, and performance standards; <br /> 3) Plant survival,vigor, and areal coverage (transect or sampling point data), and <br /> explanation of monitoring methodology in the context of assessing performance <br /> standards; <br /> 4) Assessment of nuisance / exotic biota and recommendations for management; <br /> 5) Color photographs taken from permanent photo-points that shall be depicted on the <br /> monitoring report map. <br /> 15.0 CONTINGENCY PLAN <br /> If 20% of the plants are severely stressed during any of the inspections, or it appears 20% may <br /> not survive, additional plantings of the same species may be added to the planting area. Species <br /> substitutions may be allowed if approved by a wetland biologist or the City of Everett. Elements <br /> of a contingency plan may include, but will not be limited to: more aggressive weed control, pest <br /> control, mulching, replanting with larger plant material, species substitution, fertilization, soil <br /> amendments, and/or irrigation. <br /> 16.0 ASSURANCE DEVICE <br /> Pursuant to EMC 19.37.240, the city of Everett requires a performance or maintenance <br /> assurance device to ensure compliance with EMC requirements and adequate protection and <br /> maintenance of critical areas. The following project cost estimates are provided for calculation of <br /> assurance device amount. <br /> Plant material(including installation) $6,674.00 <br /> Site preparation(decompaction and topsoil) 140.00 <br /> Mulch 1,800.00 <br /> Fencing 3,025.00 <br /> Signs 600.00 <br /> Labor 320.00 <br /> Maintenance 1,800.00 <br /> Monitoring 7,500.00 <br /> TOTAL ESTIMATED COST $21,859 <br /> View Ridge Community Church 16 Critical Area Report and Buffer <br /> WRI#16092 Averaging/Enhancement Plan <br /> November 21, 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.