My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5230 EAST DR 2022-02-01
>
Address Records
>
EAST DR
>
5230
>
5230 EAST DR 2022-02-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2022 3:54:17 PM
Creation date
7/12/2021 4:07:34 PM
Metadata
Fields
Template:
Address Document
Street Name
EAST DR
Street Number
5230
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. _ SWPPP NARRATIVE <br />The intent of this section is to provide the information necessary to supportthe <br />engineering plans in order to implement a design that will; reduce, eliminate or prevent the <br />discharge of stormwater pollutants, meet or. exceed the water quality and sediment <br />e managment :standards .for the City and State, and prevent adverse impacts to the <br />receiving waters for this project. Note; this narrative is intended to support the SWPPP <br />that is included with the Drainage Plans also apart of this submittal package to the City. <br />A. SITE GRADING/EROSION CONTROL RISK ASSESSMENT. <br />Area proposed. to,be.cleared/worked: 0.14 acres <br />Average slope for the site: 15% (Area. of Disturbance Only) <br />Erosion Hazard of Soil Low <br />Critical Areas downslope Yes (Steep Slopes) <br />Site is upstream of an ESA Stream No <br />Based on the above information and the fact that the area of the site to be disturbed is flat <br />and construction site runoff will pass through silt fencing or other perimeter filtration <br />features prior.to leaving the site, and that if site conditions warrant, additional BMP'scan <br />beā¢implemented as corrective measures the Risk Category for this site is Low Risk: <br />B. SWPPP MINIMUM ELEMENTS <br />1: Preserve Vegetation and Mark Clearing Limits <br />The first step in the construction process is for the contractor to flag or fence the limits of <br />clearing/disturbance (BMP C103) prior to any other construction activity. The engineering <br />plans locate and provide the square footages for the areas of grading, clearing, impervious <br />surfaces -and -un-disturbed⢠areas on -the proposed site. Approximately 88% of the project <br />parcel will be cleared or disturbed for this project. <br />2: Establish Construction Access <br />- The SWPPP calls for a construction entrance to be installed off of the existing shared <br />paved driveway to the east. At this time winter work is expected during the wet season. <br />3: Control Flow Rates <br />This .project` is below the thresholds requiring flow control for the project. <br />4: Install Sediment Controls <br />This site SWPPP proposes to. maintain the existing asphalt entrance .(BMP C105), <br />vegetative buffer (BMP C102),'silt fencing (BMP C233) if necessary and retention of the <br />existing vegetation (BMP C101) that will provide a vegetated strip between the cleared <br />areas and any property line. The .construction of these features should be completed <br />before`the blearing end°grading of the site.' Mulch ,(BMP C121) will also be used on the <br />exposed soil as necessary to limit erosion. In addition, streets shall be cleaned as needed <br />at the end of each work day or throughout the day if dirt and debris is tracked ,onto the <br />paved surfaces. <br />Moir SP Lot 4 20-0230 <br />February 2020 <br />Revised. October 2020 Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.