COBALT <br /> GEOTECHNICAL INVESTIGATION G E O s C 1 E N c E s <br /> EVERETT,WASHINGTON <br /> December 5,2019 <br /> Temporary cuts should be in accordance with the Washington Administrative Code (WAC) Part N, <br /> Excavation,Trenching, and Shoring. Temporary slopes should be visually inspected daily by a qualified <br /> person during construction activities and the inspections should be documented in daily reports. The <br /> contractor is responsible for maintaining the stability of the temporary cut slopes and reducing slope <br /> erosion during construction. <br /> Temporary cut slopes should be covered with visqueen to help reduce erosion during wet weather,and the <br /> slopes should be closely monitored until the. permanent retaining systems or slope configurations are <br /> complete. Materials should not be stored or equipment operated within '10 feet of the top of any <br /> temporary cut slope. <br /> Soil conditions may not be completely known from the geotechnical investigation. In the case of <br /> temporary cuts, the existing soil conditions may not be completely revealed until the excavation work <br /> exposes the soil. Typically, as excavation work progresses the maximum inclination of temporary slopes <br /> will need to be re-evaluated by the geotechnical engineer so that supplemental recommendations can be <br /> made. Soil and groundwater conditions can be highly variable. Scheduling for soil work will need to be <br /> adjustable,to deal with unanticipated conditions,so that the project can proceed and required deadlines <br /> can be met. <br /> If any variations or undesirable conditions are,encountered during construction,we should be notified so <br /> that supplemental recommendations can be made. If room constraints or groundwater conditions do not <br /> permit temporary slopes to be cut to the maximum angles allowed by the WAC, temporary shoring <br /> systems may be required. The contractor should be responsible for developing temporary shoring <br /> systems, if.needed. We recommend that Cobalt Geosciences and the project structural engineer review <br /> temporary shoring designs prior to installation,to verify the suitability of the proposed systems. <br /> 8.1.3 Erosion and Sediment Control <br /> Erosion and sediment control(ESC)is used to reduce the transportation of eroded sediment to wetlands, <br /> streams, lakes, drainage systems, and adjacent properties. Erosion and sediment control measures <br /> should be implemented and these measures should be in general accordance with local regulations. At a <br /> minimum, the following basic recommendations should be incorporated into the design of the erosion <br /> and sediment control features for the site: <br /> • Schedule the soil,foundation,utility, and other work requiring excavation or the disturbance of the <br /> site soils,to take place during the dry season(generally May through September). However,provided <br /> • precautions are taken-using'Best•Management"Practices(BMP's),grading activities can be completed <br /> during the wet season(generally October through April). <br /> • All site work should be completed and stabilized as quickly as possible. <br /> • Additional perimeter erosion and sediment control features may be required to reduce the possibility <br /> of sediment entering the surface,water. This may include additional silt fences, silt fences with a <br /> higherApparent.Opening:Size.(AOS),.,construction of a.berm,or other filtration systems. <br /> • Any runoff generated by dewatering discharge should be treated through construction of a sediment <br /> trap if there is sufficient space. If space is limited other filtration methods will need to be <br /> incorporated. <br /> 7 <br /> PO Box 82243 <br /> Kenmore,WA 98028 <br /> cobaltgeoCa gmail.com <br /> 206-331-1097 <br />