My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5306 EAST DR 2023-05-31
>
Address Records
>
EAST DR
>
5306
>
5306 EAST DR 2023-05-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2023 10:26:10 AM
Creation date
7/13/2021 9:09:32 AM
Metadata
Fields
Template:
Address Document
Street Name
EAST DR
Street Number
5306
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Inspection and Monitoring: <br />Site inspections shall be done by a person who is knowledgeable in the principles and <br />practices of erosion and sediment control. The person must have skills to first assess the <br />site conditions,. and construction activities that could impact the quality of stormwater, and <br />second assess the effectiveness of erosion and sediment control measures. used .to <br />control the quality of stormwater discharges. Whenever' inspection. and/or monitoring <br />reveals that the BMPs identified in the Construction SWPPP are inadequate, due to the <br />actual discharge of or potential to discharge a. significant amount :of any pollutant, <br />appropriate BMPs or design changes shall be implemented as soon as possible. <br />Maintaining an Updated, Construction SWPPP: <br />The construction SWPPP shall be retained on -site or within reasonable access to the site.. <br />.The SWPPP shall be modified whenever there is`a change in the design, construction, <br />operation, or maintenance at the construction site that has, or could have, a significant <br />effect on the discharge of pollutants to waters of the state. <br />The SWPPP shall be modified if, during inspections or investigations conducted by the <br />owner/operator, or the applicable local or state regulatory authority, it is determined that <br />the SWPPP is ineffective in eliminating or significantly minimizing pollutants in stormwater <br />discharges from the site. The SWPPP shall be modified as necessary to include <br />additional or modified BMPs designed to `correct problems identified. Revisions to the <br />SWPPP shall be completed within seven days following inspection. <br />13: Protect On -Site Stormwater Management .BMPs for Runoff from Hard .Surfaces <br />The 'use of on -site management BMP's for this project will allow for the installation of the <br />perforated stubout connection at the end of the project during final stabilization. That will <br />protect those areas from disturbance or compaction. In addition, the organic content of the <br />amended,, soils will -be tested and verified, prior to final project acceptance. <br />5. SOURCE CONTROL <br />This project proposes to construct a SFR and driveway. Per Volume 4 of the 2019 DOE <br />SWMMWW, residential development does not require source control. <br />6. PRESERVATION OF NATURAL DRAINAGE SYSTEM <br />The runoff from'the site`improvemerits will either'be infiltrated via permeable pavement or <br />tightlined to the existing storm system via a perforated stubout connection. However, by <br />not grading or compacting the majority of the pervious surfaces to remain after <br />construction in the area of disturbance a maximum amount of site runoff .from the <br />developed project will 'be absorbed and infiltrated into the existing on -site soils. This will <br />mimic the existing conditions by maintaining the existing direction and condition of flow <br />from thisisite. <br />Moir SP Lot 6 20-0108 <br />February 2020 <br />Revised. October 2020 Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.