Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
MOIR SIP LOT 6 <br />} <br />m <br />H it <br />PR PERMEABLE I r <br />PAVEi ENT (490 SF) <br />- - - - - - - - - - - - - - - - ---- - <br />----SS ----SS ----S5 __1441 <br />--� --1 ; <br />�d <br />-- --------- . -- -- <br />EX. METER _ . <br />I /1-1 BOX <br />EX. SFR <br />M <br />\ i <br />r 4k`y r <br />5 vh0v I <br />A <br />�l <br />�!' t <br />\ \ <br />3Z17 \ 804 \ \ <br />43 <br />SECTION 6, TOWNSHIP 28N, RANGE 5E, W.M. <br />�JqV� I <br />) <br />F <br />II I DETENTION <br />i I VAULT 1 1-1-4-PUBLIC <br />it I 1i I ! <br />I <br />DRAINAGE <br />EASEMENT <br />' <br />� 5 <br />�� /j_ <br />�(� <br />��� GOE SEWERS <br />\� ESM'T <br />INGRESS, EGRESS <br />0 \� AF# 1485'178 <br />& UTILITIES ESM'T <br />EX. P AVJ=MENT <br />- - - - - - - - <br />�S y-SS - -;S <br />rVi W - - - <br />S -- � S <br />Vd --- W <br />42. 1 i <br />LEGAL DESCRIPTION <br />SECTION 6 TOWNSHIP 28.RANGE 5 QUARTER NW <br />HIGHLAND ACRES BLK 000 D-07 LOT 6 CITY EVT SP <br />PFN-1202-2009-001 REC UND AFN 201702215002 BEING <br />A PIN OF LOT 17 OF SO PLAT <br />DATUM ASSUMED <br />BENCHMARK <br />INVERT ELEVATION OF SSMH ON EAST DRIVE <br />LYING APPROXIMATELY 175' SOUTH OF NORTH END <br />OF PAVEMENT. <br />RIM = 424.627 <br />I.E. = 404.73 <br />SITE DATA <br />SITE ADDRESS: 5306 EAST DR. EVERETT, WA 98203 <br />PARCEL NUMBER: 00471700001707 <br />ZONING: R-1 <br />R /APPLICANT <br />RONALD MOIR <br />5302 EAST DR. <br />EVERETT, WA 98203 <br />CIVIL ENGINEER <br />OMEGA ENGINEERING, INC. <br />JOSEPH SMEBY, PE <br />2707 WETMORE AVE. <br />EVERETT, WA 98201 <br />425.903.4852 <br />F:425.259.1958 <br />SURVEYOR <br />ASPI LAND SURVEYING & PLANNING <br />5205 S 2ND AVE, SUITE A <br />EVERETT, WA 98203 <br />425.252,1884 <br />VICINITY MAP <br />SCALE: 1' - 2,000' <br />0 <br />DETEN'1101-1' <br />VAULT f PUBLIC DRAINAGE <br />EASEMENT <br />i <br />GOE SEWER/ 20' <br />/, \\ ESM'T / INGRESS, EGRESS <br />N Contact: ' o 42 ��� AF# 1485178 & UTILITIES ESM'T <br />(425) 257-8731 a ----------------- f �= cGNsr. - _----_--_-- <br />-- ,1<y l /�Iul <br />.l EX. PAVEMENT�S -SS S _,5..__'—SS _ .iSi —_ 5'--APPROVED <br />OVED <br />PLANNING & COiVMUNHT----------- -- - /---`' <br />DEVELOPMENT DEPT. f. I ��� J% -/ / - - --I-��EDGE_oF PvlsT_ _ _4 <br />( f/// -. _' I - TOPS OIfKAL AFN E \ <br />/ SEE NOTE 201607050154 <br />0 20 40 (B��Afl g^ o EX. SFR V <br />I"o'RIz�AL SCALE LJ!'tTLa \D '!a W�� -'-,� Y� / STOCKPILE <br />NOTEi' <br />r <br />���` 5�,� �n.x INSTALL SILT LIMITS OF CLEARING <br />TOPSOIL/STOCK PILE NOTE: 1 > l� � \\\ y�'�0`'0� ,i \ /"\'� �� - -` - - J FLAGGING (MARK W/ 6000 SF) <br />PLASTICPILES RE TO BE SHEETING WITHIN 24 HOURS.. ` y�S \ EROSION & SEDIMENTATION CONTROL NOTE: `\,o \ <br />CONTRACTOR TO INSTALL SILT • �,�] J. �,.p, 1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE��� EX. FLOW <br />FENCING WHERE NECESSARY ALONG P \:►�Y�^��* ` AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF \ \ \ <br />PERIMETER IF VEGETATIVE BUFFER ` ROADS, PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES). \ \ 9"/� \ / ( ARROW (TYP.) <br />DOES NOT PROVIDE ADEQUATE 2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, <br />PROTECTION. / \q WA �$® REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBIUTY OF THE rr <br />1 APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED AND <br />xo "gyp u <br />VEGETATION/LANDSCAPING IS ESTABLISHED. \ I <br />3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY <br />FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO \ <br />EXISTING SOIL & VEGETATION NOTE: EXISTING UTILITIES NOTE: DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS SHALL BE PERMITTED. THE FLAGGING <br />THE SOIL ANALYSIS FOR THIS EXISTING UTILITIES DESIGNED AND SHALL BE MAINTAINED BY THE APPLICANT CONTRACTOR FOR THE DURATION OF <br />PROJECT FOUND THE EXISTING INSTALLED PER MOIR SHORT PLAT, CONSTRUCTION. / <br />SOILS TO BE ALDERWOOD URBAN AFN 201702215002 4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH <br />LAND COMPLEX. THE SITE IN THE ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO ENSURE THAT <br />so I <br />,L-J <br />�✓,yry�" <br />COVD <br />f DECK <br />P\RdT. <br />21' <br />_ _ <br />_ PROP. SEWER 5' LAND CAPE - <br />CNNECTION ESIdT. AFN <br />1 <br />`II <br />PROP. WATER 2'J'1607050154 <br />LINE <br />o� <br />I <br />I <br />3 00471700001703 <br />pa <br />o B <br />I <br />/ <br />PROP. SFR <br />I mm� <br />-on <br />o, <br />(1.881 SF) <br />/ o y60O 9F <br />w ' 'OPEN SPACE „ y <br />N88'32'33"W-67.35' <br />I I N01'08'54!W 1.00' <br />in <br />�\ I <br />SITE PLAN <br />��cSt✓ <br />ROOF <br />OVERHANG <br />EX. FLOW <br />ARROW (TYP.) <br />00471700001804 <br />7 <br />PLANNING UEPT. INSPECTION SQUIRED <br />C13 INLET <br />PRIOR TO REQUEST FOR FINAL! SpECT10N PROTECTION ( <br />sQ f. <br />Landscaping 2Fencing Signs i r\ <br />ali Sensitive Pea I0` <br />Environment y <br />Other <br />AREA OF DISTURBANCE CURRENTLY <br />NOTE: <br />SEDIMENT AND SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE SYSTEM, <br />CONSISTS OF PASTURE. <br />TOPOGRAPHIC CONTOURS ARE <br />ROADWAYS, OR VIOLATE APPLICABLE WATER QUALITY STANDARDS. <br />BASED ON INFORMATION AVAILABLE 5. <br />THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR <br />ON THE SNOHOMISH COUNTY - <br />ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES <br />WEBSITE. <br />.SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT <br />SEDIMENT AND SEDIMENT -LADEN WATER DO NOT LEAVE THE SITE. <br />TOTALAREA- 0.14Ac <br />6. <br />THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY THE <br />IMPERVIOUS AREA SUMMARY TABLE <br />APPLICANT/CONTRACTOR TO ENSURE THEIR CONTINUED FUNCTIONING, ESPECIALLY AFTER <br />PGIS (s <br />NPGIS s <br />Total(so <br />SFR HEIGHT CALLS <br />STORM EVENTS. <br />Exists To Be Removed <br />0 <br />0 <br />SIDE EX.ELEV. <br />7. <br />THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM <br />Existin (To Be Replaced) <br />0 <br />0 <br />0 <br />A 423 <br />OF ONCE A MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR STORM EVENT. <br />Existing(To Remain) <br />16 <br />0 <br />16 <br />B 425 <br />8. <br />AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE <br />New + e aced <br />Total Site lm ervlous <br />490 <br />881 <br />188 <br />2 1 <br />2 38 <br />C 425 <br />D 424 <br />Lg 7 <br />WITHIN A TRAPPED CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE <br />CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN <br />NETNEW <br />490 <br />1881 <br />2371 <br />AVG <br />ELEv.-40ea" 1 499P <br />1 I <br />WATER INTO THE DOWNSTREAM SYSTEM. <br />MAX. BLDG HT: rG29:0';<'26.83'=6TSA3+. Il <br />AFOOES SHALL BE LED AT THE EGINNING OF <br />NANDDCTION <br />MAX. BUILDING LOT COVERAGE: 35% <br />BUILDING LOT COVERAGE: 33.0% <br />�j(�2�' <br />�Z�a,�} �} ���o9(['f <br />CONSTASTRUCTIONLIZED <br />MAINTAINED R THE DURATIONS OFTHEPROJECT. ADDITIONAL <br />MAY ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR <br />v <br />TMEASURESOBETREQUIRED <br />DURAPROJECT. <br />GRADING QUANTMES: <br />yy��" 1\ / 10. <br />THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE DEBRIS AND <br />SEDIMENT TRACKED OFF THE SITE. <br />CUT = 90 C.Y. <br />I • w-i4 Ot►WC 7�d r (�,• ZO 11. <br />APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING SURFACE <br />FILL = 90 C.Y. <br />WATER BODIES IF THE PROPOSED BMPS FAIL. <br />12. <br />BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABIUZED FOR <br />GRADING QUANTITIES ESTIMATED BASED <br />NO MORE THAN 2 DAYS FROM OCTOBER 1 THROUGH APRIL 30, AND FOR NO MORE THAN <br />ON CURRENT SITE INFORMATION & <br />`w,f� n.` <br />rW�J <br />7 DAYS FROM MAY 1 THROUGH SEPTEMBER 30. <br />ASSUMED EXCAVATIONS NECESSARY FOR <br />�l�`\� <br />QiW �5 <br />PROPOSED IMPROVEMENTS. <br />Yv'1 { <br />VV <br />SWPPP <br />T.E.S.C. LEGEND <br />- X- SILT FENCE PER COE STD DWG 214 <br />■ I I ■ CLEARING LIMITS PER BMPC103 <br />OCB INLET PROTECTION <br />DRAWING INDEX <br />Fee <br />1) COVER, PRELIM. SITE LAYOUT & SWPPP <br />2) TARGETED. STORMWATER SITE PLAN <br />& SOIL MANAGEMENT PLAN <br />Know What's below. <br />3) DETAILS <br />Call two business <br />days before you dig. <br />1 <br />O <br />J <br />0- <br />V! <br />0 U ? <br />N 3 3� <br />Q O Q <br />(0 (0 <br />3(0 111 <br />zM <br />W F— O w <br />g LL O U) Of <br />J ' U. <br />O ~ <br />U. 0 O <br />Z <br />III�I —�0 o N <br />HORIZONTAL SCALE O- <br />PFN: <br />PLAN APPROVED <br />I'll <br />PUBLIC WORKS <br />DEPARTMENT <br />20-0108 <br />1 EJT <br />6/24/20 <br />DRAINAGE <br />ec�c 1" = 40' <br />A PUBUC WORKS PERMIT IS REWIRED PRIOR TO <br />STARTING ANY CONSTRUCTION ON THIS <br />PROJECT. APPROVAL FOR THIS PROJECT <br />IS CONDITIONAL PER CURRENT STANDARDS <br />AND EXPIRES UNLESS PERMIT <br />FOR CONSTRUCTION HAS BEEN ISSUED. <br />°` <br />