My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2715 EVERETT AVE VERIZON ANTENNA 2022-02-02
>
Address Records
>
EVERETT AVE
>
2715
>
VERIZON ANTENNA
>
2715 EVERETT AVE VERIZON ANTENNA 2022-02-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2022 12:02:32 PM
Creation date
7/13/2021 10:05:04 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERETT AVE
Street Number
2715
Tenant Name
VERIZON ANTENNA
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT <br />City of Everett Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />(425) 257-8810 <br />OWNER NAME AND ADDRESS: <br />BETHANY CHRISTIAN ASSEMBLY-EVERETT <br />2715 EVERETT AVE <br />EVERETT WA 98201-3754 <br />2 1 JUN 2017 <br />Date: 1 /19/2017 <br />Public Works Permit #: PW1701-016 <br />Parent Permit #: B1612-002 <br />Planning Reference #: <br />Public Works Fee $: $ 65.00 <br />Other $: <br />APPLICANT NAME AND ADDRESS: <br />BECKY TODD <br />PHONE: ( PHONE: 2063101793 <br />TAX PARCEL ID # 29052000406900 1 SITE ADDRESS: 2715 EVERETT AVE <br />SITE WOR FOR REPLACEMENT UTILITY POLE <br />Site work associated with replacing an existing utilitiy pole with a larger pole and installing 3 panel antennas. Covers hard <br />surface restoration and trenching. <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications. <br />3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br />4. Site Civil Work to be done per plans approved by the City of Everett Public Works <br />Department dated 1/19/2017. <br />5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior <br />to starting construction and with other inspection requests. <br />6. Temporary erosion and sedimentation control measures for construction activity must <br />be operational prior to commencement of any dirt/paving removal or replacement. Must <br />be removed upon completion of the project. <br />7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto <br />roadway. <br />8. Protect all existing underground utilities during construction. <br />0�, <br />9. Any damaged sidewalk shall be replaced to meet current City standards (#306). <br />€ <br />10. Traffic Control Plans must be submitted to the City of Everett Permit Services <br />Counter (Public Works reviewers) for review and approval prior to any interruptions to <br />JUN 2 1 2017 <br />the roadway. <br />Public Works Permit Fee Breakdown: <br />Misc. Minor Permits..................................$25.00 <br />PW Plan Review.......................................$20.00 <br />PW Site Inspection....................................$20.00 <br />Approved for Construction Date <br />FINAL INSPECTION Date <br />Approved as Constructed <br />CITY OF EVERETT <br />Permit Services <br />C <br />0.1 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and save harmless the <br />City of Everett from any and all claims for damages, costs, expenses, or <br />causes of action that may arise because of installation and maintenance of the <br />improvement or other right-of-way use hereto applied for and further agrees to <br />remove same upon notice from the City and to replace public property <br />damaged thereby. <br />Signature of Applicant Dat <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br />PURSUED TO COMPLETION, THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />F� <br />
The URL can be used to link to this page
Your browser does not support the video tag.