Laserfiche WebLink
W NOr SCAU OPAWMI CDraWACM tNST ttDW ALL <br />a �s oa <br />S. <br />DMIMj� <br />i <br />GENIYtAC 30kW 120J240V STAND-DY DIESEL EMERGENCY GENERATOR INSTALLED AS <br />TO AT GEN SYSTEM <br />010r.r <br />o49')'AlN L vA IMP10s pt liaavlCR ps ro WOAX <br />O RKTIOINISE I CR M O " <br />SHOWN TI <br />A J# IY MAIM #3 D Wi F TH PWCR WO OM <br />MT1t05'AL ALA. PRLNWS g7VEa or rMs OR4W00 AA[ <br />PLTi MANUF. SPEgF ATION5�D0 NOT BOND NEUTRAL GROUND <br />TC <br />NON -SEPARATELY DERIVED. <br />- <br />SUFD=W W 7W LAIM IrVAM. ALL OeAW CS MO <br />+s nowt PAaacm au trottx: <br />Ia7rAW tpn FaRL:EtA <br />U <br />LIEN OUTPUT i6DA 2P CIRC BNEAKEFt. <br />SEE SHLLI I:--2 • <br />FOR CONTINUATION <br />A T MILL K MOMOM <br />t+eA »x M�CISRLr mu oc PACM CCp catsasrolwn <br />A6W\Y or tuts PNaccT. <br />Vll <br />GEN CONTROLLER <br />NEW MIN. (3) JI/O CU. + t 16 GROUND IN 2' CONDUXT UNDERGROUND EMERGENCY <br />POWER TO NkIY PERMANENT GENERATOR ENTITY LOCATION. PROM1IOE RNC B.F G. AND <br />�--- UOT t <br />+ ( <br />31 <br />UOT - l0 24 <br />UC '- <br />0 <br />T -"� UOT <br />24 at <br />h <br />( I <br />RGS A.F.G. <br />Ut3t <br />. _ � UOT <br />j� <br />3/4' CONDUIT. W/ LOW VOLTAGE CONOUCT<WS TO ATS FOR START/STOP CONTROL & <br />IF! <br />f <br />170T - —. UOT <br />` r t <br />\ 1 <br />V <br />V <br />ALARM <br />2112 CU & IJ12 GROUND IN 3/4- CONDUIT FOR EACH GEN CHARGER/HEATER <br />t <br />tiGP �- +P <br />A <br />I9 <br />r� h <br />l <br />CR IT. <br />(6) 6- SCH 80 CONDUIT FOR HYBRID/COAX CABLES FROM EQUIPMENT PAD TO POLE <br />1 <br />111 !: ! = <br />�s <br />24lif <br />V <br />PROVIDE 20OA-2P MAIN CIRCUIT BREAKEFL <br />NEW SkOPIJD INSTALLED POWER VAULT {VOSQi i3-WX24-X15 ik !A"IDSCAPE AREA <br />Z1 I <br />4 %G <br />BACKSIDE OF SIOEWALK. <br />24 <br />i <br />NEW TLC INTEGRATED LOAD CENTER TIEkUA-3R PPC LOAD CENTER (PANEL `PPi')s <br />COMP WITH AN WTEGRATEO AUTOMATIC TRANSFER SWITCH, A 2OD-2'' UT03TY M�VN <br />CIRCUIT BREAKER & A 2QCA-2P EMERGENCY MAIN CIRCUIT BREAKER (ASCO D300L <br />POWER TRANSFER LOAD CENTER). <br />r <br />20 �S � <br />24 <br />� /'�� <br />L/ <br />20 <br />:, 4 � <br />j <br />ti <br />PRIDE & INSTALL NEW (2) IP-20A BREAKERS IN LOAD CENTER FOR GEN BAIT <br />CHARGER & BLOCK HFATER, <br />ir�r <br />CONSTRUCitON <br />Q <br />AF /0, + 1#6 GROUND, 2' PVC SCH 40 CONDUIT. PROVIDE RNC B.F.G. AND RGS <br />�y I <br />24 7 �� <br />8 <br />01/29/20 <br />COOLED CONSTRUCTION <br />7 <br />10/29/19 <br />ISSUED CONSTRUCTION <br />!3 <br />NEW POST FOR VERIZON ML'TERAWN. <br />Jj �UOT <br />UOT UOT/�f <br />// <br />6 <br />09/20/19 <br />ISSUED CONSTRUCTION <br />14 <br />NEW 240V, 14, 3W. 2ODA RATED, NEMA•-3R METGT/MAN CIRCUIT ORFAKER COMBO. <br />� <br />5 <br />07/19/19 <br />ISSUCD CONSTRUCTION <br />1rJ NEW VERRON GLASS 200A 240V, JW METER 50CKEE PER POWER CO, SPECIFICATIONS. <br />` //3 <br />EXISTING VANITY POLE WITH OVERHEAD FIBER. <br />BOND TO GROUND RING W//2 AWQ SOLID TINNED COPPER. <br />/ <br />it ( <br />J2 t1* <br />�� <br />(?e> <br />`✓ <br />�� <br />4 <br />12/03/16 <br />ISSUED FOR 94% CO <br />3 <br />10/11/18 <br />COOLED FOR REVIEW <br />}$ <br />NEW #4 AWO GROUND ELECTRODE CONDUCTOR TO (2) 5/6'xlO' COPPER CLAD RODS <br />W <br />_ - <br />��/ } <br />PPi�j�O <br />28 <br />2 <br />12/t!/17 <br />ISSUED FOR REVEW <br />SPACED A MINIMUM OF APART. <br />i <br />27 <br />}$ <br />New WALL. MOUNT NEMA-3R, DUOLIK FIBER ENCLOSURE./ <br />t/� <br />No. <br />Dato <br />ReNebn <br />Glenn <br />NEW 2" CONDUIT FOR EOUIPMENTT CABINET REI"ER TO LOAD CENTER WAG. SHEET E-5. <br />SEE SHEET C-2 ! <br />FDR CGHt1NUATtON <br />28 <br />29 <br />2B 'fi <br />2 <br />j <br />NEW 4' SCH. 40 PVC CONDUIT W/ MULE TAPE & (2) 1-1/4- LNNERDUCTS FROM <br />HEMA--3R ENCLOSURE TO FIBER CABINET. <br />4 / <br />t <br />`� <br />0 <br />v*/ <br />NEW (3) /3/0 AWG CU. IN 3" PYC SCH soCONDUIT. <br />�� � <br />v,.r n <br />lzo <br />NEW RHEIR RISER ON POLE TRANSITiONING FROM OVERHEAD TO UG FIBER COORDINATE <br />ALL REQUIREMENTS & EXACT FIBER MEET PONT WITH FIBER PROVIDER. <br />Implementaiton TeamCONTRACTOR <br />TO ARRANGE To PAY FOR UNDERGROUND 1IDU7Y LOCATION SURVEYS FOR <br />ALL TRENCHING. REUSE NATIVE BACKFILL AND REINSTATE TO ORIGINAL CONDITION. <br />/ <br />INSTALL 6* 'AIDE METALLIC LINE RED PLASTIC MARKER TAPE 9* ABOVE ALL BURIED <br />CONDUIT. <br />`Actualize <br />Q <br />NEW UTILITY POLE. SNOPUD TO RELOCATED EXISTING POLE MOUNTED THAN5FORIJER TO <br />t <br />NEW POLE- COORDINATE WITH POWER COMPANY FOR NEW 200A 120/240V-14-3W <br />FOR VERIZOR WIRELESS. <br />0 <br />NEW CHARLES CABINET. <br />4 <br />NEW ANOREW POU/BATTERY CABINET. <br />22'tt34- $CA L• 3/8- .. 1'-0* ® <br />11.07- SCALE 3/16- - 1'-0- 2 1' 0' 2' <br />ELECTRICAL PLAN <br />3 <br />AcE Team; <br />0 <br />NEW SURFACE MOUNTED LED ENCLOSED & GASKETED 6"x2e FIXTURE. (LITHONIA CAT <br />IOMW2-L24-400OLM-ACL-MD-WOLT-GEi-40K-SOCRI) <br />� <br />/� <br />AWN SWITCH INTERRUPT CAPACITY o IOOK AIC <br />tom. ALL OVERCURRENT OWM SHALT. BE RATED TO INTERRUPT A <br />MORRI5ON HER <br />NEW 4 TO 8 HOURS CRANK TIMER LIGHT SWITCH IN WEATHERPROOF ENCLOSURE. <br />LOW CALdRATiDNS: <br />SNORT CIRCUIT CURRENT OF A MIi(MUM 42.0OD AMPS SYMMETRICAL <br />TE200 <br />BOO STEWARr S'T,BUI1TE200D <br />CONDUIT TO BE CAPPED AT RIGHT OF WAY FOR FUTURE DARK FIBER. <br />MAXIM CONNECTED LOAD: 48 KVA O 120/240 VOLT, 14 - 200 AMPS <br />2. THE 3OkW GENERATOR SHOWN IS VOWED TO PROVIDE ADEQUATE <br />POWER BACK-UP FOR (1) A (4) <br />8F.ATTLE.WABSIDI <br />T0FrIW 28 .7370 <br />g <br />NEW (2 4- SCH BO PVC CONDUIT$ EACH Wj 3) 1-1/4' INNFROUCTS W/ MULE <br />(PER CURRENT DOW) <br />" AL DEMAND LOAD: I&S KVA 0 120 240 VOLT. 10 - 89 AMPS EQUIPMFM OENCLOSURE <br />EQUIPMENT ENCLOSURE <br />BREAKERS ORCABTHE DREUAX <br />OR 2 4 A ClRCi3R BREAKERS OWE Tip liRE E A LARGER' <br />/BATTKOFRY <br />POWER WILL REQUITE A LARGER <br />� <br />shW <br />www.mwriux+Aershlfniemm <br />TAPE 14 EACH FROM THE BASE OF LMLITY PO TO THE NEMA-3R FIBER ENCLOSURE. <br />COORDINATE ALL REQUIREMENTS W/ FIBER PROVIDER. (1) CAP AT BASE OF POLE (1) <br />(ASSUMES A MAX. OF 4 RECTIFIERS POWERED) <br />LED.BACKUP <br />Project Into: <br />CONNECT TO 4' RISER TO COMM LEVER. AT POLE. <br />3i <br />NEW BATTERY CABINET. <br />1 <br />26 2rSEA <br />BAGSHAW <br />WALL 14OUNIED OVP AND RRUS <br />2 <br />24 7 <br />O k "" - <br />271E EVERETT AVE <br />4 8 <br />22 <br />kVERETT. WA 98201 <br />t3 <br />FIBER <br />PDUR/BATT <br />IO <br />CABINET <br />CHARlES <br />(CAt�Rt:f) <br />DrotrlAg lRlot <br />3 1514 <br />2s id <br />� ;ja2"0 <br />ELECTRICALN' <br />AND <br />' <br />RISER DIAGRAM <br />POWER <br />FIMSr-TTF <br />� <br />9 <br />1 <br />project Humbert <br />190001900 <br />Start Bala; <br />11/16/15 <br />Dr~. <br />JS <br />Daaigner: <br />S11 <br />S q f7 UGT 24 <br />UGP — ItGP UCP UGP —� RIFF --- — UGP — tJGP <br />UGP — UOP — UCP <br />UGT UGT (JOT — <br />— U0T — tKJT tJCi <br />Project Manager. <br />Proteesionot of Raeend: <br />LA.TT UGT <br />— — LJDT <br />UOT — UOT — UGT — UOT <br />W9 <br />LC <br />Revielm No: <br />Sbaet Na: <br />f2 24 <br />24 2t <br />31 24 24 22 <br />8 <br />E-3 <br />i <br />ELECTRICAL REFERENCE NOTES <br />12 <br />121;�; <br />ELECTRICAL RISER DIAGRAM <br />1 <br />City of Everett Reviewed for Permit <br />