My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2401 FULTON ST 2021-07-13
>
Address Records
>
FULTON ST
>
2401
>
2401 FULTON ST 2021-07-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2021 10:31:01 AM
Creation date
7/13/2021 10:30:29 AM
Metadata
Fields
Template:
Address Document
Street Name
FULTON ST
Street Number
2401
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLI IVORKS PERMIT • Date Applied: 1/17/2020 <br /> City of Everett Permit Services Public Works Permit#: PW2001-025 <br /> EVERETT 3200 Cedar Street, 2 0 Floor Associated Bldg Permit#: B1912-005 <br /> Everett, WA 9821 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $319.92 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: 0 F EB L020 <br /> PEARSON JENNY Belmont Homes NW Inc. <br /> 2401 FULTON ST 7304 10th Street SE <br /> EVERETT,WA,98201-3152 LAKE STEVENS,WA,98258 <br /> PHONE: PHONE:4252310823 <br /> TAX PARCEL ID#:00405354200900 SITE ADDRESS:2401 FULTON ST <br /> DESCRIPTION: PAVING AND CONSTRUCTION OF NEW DETACHED GARAGE <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 01/17/2020.Approved plans <br /> must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally <br /> request all required inspections. Flyers are provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and approved SWPPP/Plan. Remove upil:A cortipl; ion of <br /> the project prior to final approval of the permit. ' 1—.`�`' '` ` �� ' ` 1 , 1;^ <br /> „.._., <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be track )cthiid 1-~ rn <br /> r- _= <br /> 8. Protect all existing underground utilities during construction. , D 74:1 <br /> 0:3 1-4 7P <br /> 9. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replacee imper# Jus surfaces vvjjl be managed <br /> on-site in a manner that does not adversely affect neighboring properties,including the City's right-of-wj.y and/or easelent l the <br /> improvements located therein. '-' ,w <br /> 10.This permit must be finaled in order to close out this permit/grant a Certificate Ii34 Occupancy. Request a final inspection onlOp by <br /> selecting PW 24-Site Final within the Online Permitting Portal Inspection Requests fall this permit when all items have been completed. <br /> 11. All work constructed within the public right-of-way must be removed or reloca 1�' at the owner's expense if the City ever rdailires <br /> use of the right-of-way for municipal purposes. , ._ •ram` y ca a <br /> ea . •1 17.:i-- n .,.• , a rPublic Works Permit Fee Breakdown: 'L.d r''•,a`=' ` ' <br /> Paving(216SF) $45.00 F•_. <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 <br /> Stormwater System Development Fee $234.92 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless <br /> the City of Everett from any and all claims for damages,costs,expenses,or <br /> ©/ ZGZO causes of action that may arise because of installation and maintenance of <br /> Approved for Construction(Public Works) Date the improvement or other right-of-way use here to applied for and further <br /> agre to r mov ame upon notice from the City and to replace public <br /> pro e e they y. <br /> FINAL INSPECTION Date // 2 / e)--� <br /> Approved as Constructed (PW Inspector) Signal are of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS� THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br /> /L� cop,' <br />
The URL can be used to link to this page
Your browser does not support the video tag.