Laserfiche WebLink
} <br /> • Spill Response Plan: Refer to Appendix A-4. <br /> • List of Common Parts: Refer to Appendix A-3. <br /> • Access: A vacuum truck can access the grinder pump from an asphalt paved access. The <br /> access meets the same access requirements as a pond (per DOE Stormwater <br /> Management Manual for Western Washington, Volume III, Chapter III-3.2.1)that is <br /> designed to accommodate a vacuum truck. Access requirements are typically 40-foot outer <br /> radius for turns, 15-foot minimum at turns, 10-foot minimum at straight sections, and <br /> 15 percent maximum slope. Refer to Appendix A-1 for review of access. <br /> 10.0 Conclusion <br /> The analysis has been prepared using procedures and practices within the standard accepted <br /> practices of the industry. <br /> AHBL, Inc. <br /> Yi Yang, PE <br /> Project Engineer <br /> YY/Isk <br /> May 2020 <br /> Q:\2017\2170857\WORDPROC\Reports\20200508 Rpt(Sewer Pump)2170857.10.docx <br /> Grinder Pump Report No ©©MS <br /> North Sound Behavioral Health Treatment 4 <br /> AHBL No.2170857.10 <br />