My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
902 PINE ST NORTH SOUND BEHAVIORAL HEALTH TREATMENT CENTER 2025-11-04
>
Address Records
>
PINE ST
>
902
>
NORTH SOUND BEHAVIORAL HEALTH TREATMENT CENTER
>
902 PINE ST NORTH SOUND BEHAVIORAL HEALTH TREATMENT CENTER 2025-11-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2025 1:37:49 PM
Creation date
7/13/2021 1:43:06 PM
Metadata
Fields
Template:
Address Document
Street Name
PINE ST
Street Number
902
Tenant Name
NORTH SOUND BEHAVIORAL HEALTH TREATMENT CENTER
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> WEIL Submersible Wastewater Pumps 1600 <br /> Explosion-Proof U/L Submersible Pump Motor 5 00 <br /> Class 1 Div 1 Groups C&D <br /> Wiring Diagrams <br /> Owner's Information <br /> Manufacturer's Number Date Code <br /> Introduction Safety Precautions <br /> This manual contains wiring diagrams for the installation Always disconnect the electrical power supply to the motor <br /> of your explosion proof motor pump equipment. before working on the unit. Failure to do so can cause <br /> severe electrical shock or death. <br /> The pump is a well designed and sturdily constructed <br /> machine. When properly installed and given reasonable Do not walk on wet or flooded floor until the electrical <br /> care and maintenance,it will give many years of service. power has been disconnected. Exercise caution when <br /> working near equipment with rotating parts. <br /> There are six wiring diagrams. They are for 1150 rpm, <br /> 1750 rpm,and 3450 rpm explosion proof motors. <br /> Fig.A- 1 phase 115 volt without run capacitor Receiving <br /> Fig.B- 1 phase 115 volt with run capacitor Immediately upon arrival,the equipment should be <br /> Fig. C- 1 phase 208-230 volt without run capacitor checked for any shortages and/or damage. Any shortages <br /> Fig.D- 1 phase 208-230 volt with run capacitor or damage should be noted on the bill of lading and freight <br /> Fig.E-3 phase 208-230 volt bill,and promptly reported to the Transportation Company. <br /> Fig.F-3 phase 460 volt Claims for shortages or damage must be made in writing to <br /> Weil Pump Company,Inc.,Cedarburg,Wisconsin within <br /> 14 days of being received. <br /> 1600 <br /> X SN-1600XP-1 FEBRUARY 1,2009 2500 <br />
The URL can be used to link to this page
Your browser does not support the video tag.