My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
902 PINE ST NORTH SOUND BEHAVIORAL HEALTH TREATMENT CENTER 2025-11-04
>
Address Records
>
PINE ST
>
902
>
NORTH SOUND BEHAVIORAL HEALTH TREATMENT CENTER
>
902 PINE ST NORTH SOUND BEHAVIORAL HEALTH TREATMENT CENTER 2025-11-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2025 1:37:49 PM
Creation date
7/13/2021 1:43:06 PM
Metadata
Fields
Template:
Address Document
Street Name
PINE ST
Street Number
902
Tenant Name
NORTH SOUND BEHAVIORAL HEALTH TREATMENT CENTER
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I Permit#: PW1912-030 <br /> Site Address: 902 PINE ST @ @ (1(� <br /> @ 0_ __ <br /> Owner: SNOHOMISH CO PROP MGMT "'J <br /> I Tenant: NORTH SOUND BEHAVIORAL HEALTH MAY Z 9 ZOZa <br /> TREATMENT CENTER(NSBHTC) 11 <br /> App.Date. 12/17/2019 — —,. ._. <br /> Proposed use: CLINIC <br /> GITy OF EVE - - _ -- <br /> Description: DRAINAGE REPORT FOR NSBHTC Permit Services H T B L <br /> IReviewed By:,...AFS Date: CI!5-47/`A7_n rP <br /> Office Set lob Site Set Fire/Planning Fire/Planning Set <br /> • 12 <br /> CITY OF EVERETT MAY 2 7 2020�� <br /> Y � � 5 �GnFO _- _ Stormwater Site can f e or I t <br /> = -=- _ =-- - PREPARED FOR: <br /> I - — — KMD Architects <br /> a - = Avenue, Suite 1130 <br /> 1325 Fourth <br /> Seattle, WA 98101 <br /> — <br /> _ PROJECT. <br /> — — _ - — North Sound Behavioral Health Treatment <br /> 902 Pine Street <br /> Everett, WA 98201 <br /> _ Parcel No. 29051700102000 <br /> -- AHBL No. 2170857.10 <br /> r- <br /> _ .. <br /> _____ _______ PREPARED BY: <br /> Yi Yang, PE <br /> Project Engineer <br /> = ___ <br /> ir- <br /> ,_=_ <br /> — _ REVIEWED BY: <br /> ,. . <br /> - Douglas G. Tapp, PE <br /> Principal <br /> Bethany P. Steadman, PE <br /> Project Manager <br /> DATE <br /> January 2020 <br /> — Revised May 2020 <br /> ICivil Engineers • Structural Engineers • Landscape Architects • Community Planners • Land Surveyors <br />
The URL can be used to link to this page
Your browser does not support the video tag.