|
ABBREVIATIONS SYMBOLS GENERAL NOTES ROBEL RESIDENCE
<br /> iiisif
<br /> & and FO face of AV ave,pavers,pavement 1.'MESEGENERALNOTESPERTAINTOWORKDESCRIBEDONALLCONTRACT (,•:h1,1 D,sign
<br /> p 8621 XAVIER WAY
<br /> angle FP fireplace,fireproof CF pounds per cubic foot DRAWING REFERENCHRAWING DOCUMENTS.
<br /> at FR fire resistant ED pedestal # _REFERENCE EVERETT, WA 98208
<br /> 2.THE CONTRACT DOCUMENTS CONSIST OF THE OWNER CONTRACTOR
<br /> it nhannelpounds FS full size ERF perforate SHEET NUMBER AGREEMENT,THE CONDITIONS OF CONTRACT TIlE(GENERAL.SUPPLEMENTARY,
<br /> I channel FSK floor sink FB prefabricated AND OTHER CONDITIONS),THE DRAWINGS,THE SPECIFSUESAB,AND ALL
<br /> MODIFICATIONS folding shower seat FN prefinished ENLARGED ADDENDA ISSUED PRIOR TO AND ALL MODIFATIONS ISSUED AFTER
<br /> ABV above FT foot,feet KG parking DRAWING EXECUTION OF THE CONTRACT.
<br /> AC air conditioning,acoustic FTG footing L plate DRAWING TITLES BUBBLE 3.MINI DESIGN IS THE AUTHOR OF THESE PLANS AND CLAWS A COPYRIGHT IN DRAWING INDEX
<br /> ACC access FUR tuning LAM plastic laminate , DRAWING NAME THESEPMADEUNDERNS
<br /> ANDL THE OF
<br /> CON S NTE CO EGA AND
<br /> APPL THIS CLAIM ABLE
<br /> MAD TIESAN TITLE 1]OF THE UNITED STATES CODE AND ALL APPLICABLE
<br /> ACP acoustic ceiling panel LF pounds per linear foot TREATIESAND FOREIGN LAWS.THESE COPYRIGHTED DRAWING FILES ARE TO BE G001 TITLE SHEET
<br /> ACT acoustic ceiling tile GA gage,gauge LL parallel SCAN 8 =1•D REFERENCE ONLY.IMD WILL TAKE NO RESPONSIBILITY FOR ANY
<br /> CHANGES
<br /> ADD addendum GB grab bar LY plywood CHANGES MADE TO THESE DOCUMENTS BY ANOTHER PARTY AND NO LICENSE IS AS101 SITE PLAN
<br /> ADJ adjust,adjustable GC general contractor NL panel REFERENCE SCALE GIVEN FOR TRANSFER OF THESE COPYRIGHTS TO ANOTHER PARTY. AID( GROUND LEVEL FLOOR PLAN
<br /> AFF above finish floor GBR grab bar rear NT paint a THE WORK COMPRISES THE COMPLETED CONSTRUCTION REOUIRED BY THE
<br /> AL aluminum GBS grab bar side OLY polyethylene NORTH ARROW I CONTRACT DOCUMENTS AND INCLUDES ALL LABOR NECESSARY TO PRODUCE A301 TYPICAL ENLARGE BATHROOM PUN a ELEVATION ALT alternate,alternative GBV grab bar vertical R pair N SUCHCONSTRUCTION,AND ALL MATERIALS AND EQUIPMENT INCORPORATED OR —
<br /> ALUM aluminum GF ground face ROP property line (, , TOBE INCORPORATED IN SUCH CONSTRUCTION.
<br /> ANOD anodized GLAZ glazing SF pounds per square foot S.SHOP DRAWINGS.PRODUCT DATA AND SAMPLES ARE NOT A PART OF THE
<br /> APPR approximate GLB glassblock SI pounds per square inch �I� CONTRACT DOCUMENTS.THE DESIGNER WALL REVIEW THEM.BUT ONLY FOR ROBEL
<br /> ARCH architect,architectural GLV galvanize,galvanized T paint \�VI CONFORMANCE WITH THE DESCN CONCEPT OF THE WORK AND WRHTHE PROPERTY INFO. PROJECT DESCRIPTION
<br /> AVG average GL lass, laid,glazing TD INFORMATION GIVEN IN THE CONTRACT DOCUMENTS.THE CONTRACTOR RESIDENCE
<br /> g g g g g paper towel dispenser SHALL NOT BE RELIEVED OF RESPONSIBILITY FOR ANY DEVIATION FROM THE
<br /> GRD grade VC poly vinyl cloride REQUIREMENTS OF THE CONTRACT DOCUMENTS BY THE DESIGNER REVIEW OF '- '--- - -- -
<br /> BB board&batten GSKT gasket SHOP DRAWINGS.PRODUCT DATA OR SAMPLES. LEGAL DESCRIPTION OF PROPERTY:
<br /> BD board GWB gypsum wallboard radius,risers 0 OWNER:
<br /> B.THE CONTRACTOR SHALL CAREFULLY STUDY AND COMPARE THE CONTRACT ESTIFANOS,ROBEL
<br /> BF barrier free GYP gypsum &S rod and shelf 'Mgr DOCUMENTS AND SHALL AT ONCE REPORT TO THE DESIGNER ANY ERROR, BEVERLY VIEWLANDS DIV 2 BLK 000 D-00-LOT 17 TGW
<br /> BLDG building RA return air �- INCONSISTENCY OR OMISSIONS HE MAY DISCOVER.THE CONTRACTOR 1/38 INT IN TR PARK&GRDNS 6621 XAVIER WAY
<br /> SHALL PERFORM NO PORTION OF THE WORK AT ANY TIME WITHOUT ADDRESS:
<br /> BLK block,blocking RAD radius CONTRACT DOCUMENTS OR,WHERE REQUIRED.APPROVED SHOP DRAWINGS, 8621 XAVIER WAY EVERETT,WA,MOB
<br /> BLW below H high,height RBB reverse board&batten PRODUCT DATA OR SAMPLES FOR SUCH PORTION OF THE WORK. EVERETT,WA 98208 PARCEL NUMBER:
<br /> BM beam HB hose bibd RD roof drain 00394200001700
<br /> ].ALL WORK IS TO CONFORM WITH THE CONTRACT DOCUMENTS.
<br /> BS both sides HD heavy duty REF reference,refrigerator PROJECT NUf.18EF.
<br /> ER:
<br /> BSBL buildingsetback line HDR header REINF reinforce,reinforcement LOCATELE DIMENSS ARE IONS
<br /> NOT TORENY ITEM FOR WORK.CONSULTION IF WITH THE
<br /> PARCAL 0N001700
<br /> BRE FORPROCEEDING REMTH CONSTRUCTION THE 00394200001700
<br /> BSMT basement HDW hardware RF roof DESIGNER BEFORE WITH . 20107
<br /> BTM bottom HEX hexagonal RFL reflected B.IN THE EVENT CERTAIN FEATURES OF THE CONSTRUCTION ARE NOT FULLY ZONE:
<br /> BTWN between HJ head Joint RH right hand,robe hook SHOWN ON THE CONTRACT DOCUMENTS.THEN THEIR CONSTRUCTION SHALL BE R-1
<br /> BW both ways HM hallow metal RM room /Y ELEVATION REFERENCE OF THE SAME CHARACTER AS FOR SIMILAR CONDITIONS THAT ARE SHOWN
<br /> HORIZ horizontal RMV remove /I \ OR CALLED FOR AND SHALL BE REVIEWED BY ME DESIGNER
<br /> CAB cabinet HT height RO rough opening C\{L\ //>J B.ALL WORK SHALL BE PERFORMEDWRHIN STRICT CONFORMANCE TO THE ENERGY NOTES
<br /> CB catch basin HWD hardwood ROW right of way v SHEET NUMBER MINIMUM STANDARDS OF THE CURRENT EDITION OF THE INTERNATIONAL APPLICABLE CODES ENERGY NOTES
<br /> CFM cubic feet per minute HWT hot water tank/heater RVS reverse BUILDING CODE AND ALL APPLICABLE NATIONAL,STATE,MID LOCAL LAWS.
<br /> CFR chamfer HVAC heating,ventilation& REGULATIONS AND ORDINANCES. _ --
<br /> CFT cubic feet air conditioning- S south 10.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE GENERAL SAFETY BASED ON THE 2015 I.R.C,2015 UPC,2015 WA TENERGYWASHINGTONCODEON SATE E SHALLOD BE E A215R
<br /> _ CIP cast in place HZ horizontal SAM self-adhesive membrane EXIT SIGN DURING CONSTRUCTION.AND ALL WORK SHALL CONFORM TO PERTINENT MINIMUM( SNARE ENERGY RU-V U-VALUES CJ control joint SBK setback e SAFETY REGULATIONS. AMENDMENTS
<br /> CODE,AND 2015 WA STATE INSULATION(R)VALUES OR U-VALUES
<br /> CL centerline CC international code SC solid core OF COMPONENTS SHALL BE AS FOLLOWS:
<br /> />< ELEVATION REFERENCE n.THE CONTRACTOR SHALL COORDINATE LOCATIONS OF ANY AND ALL GLAZING,VERTICAL(U-VALUE)0.30 MIN.
<br /> CLG ceiling council SCD seat cover dispenser MECHANICAL,TELEPHONE,ELECTRICAL,LIGHTING AND PLUMBING INCLUDING OCCUPANCY GROUP R-3 DOOR,ENTRANCE(U-VALUE)0.30 MIN.
<br /> CLR clear,clearance D inner diameter SCHED schedule ALL PIPING,DUCT VORK AND CONDUIT.COORDINATE ALL REQUIRED CEILING INSULATION AT
<br /> CMU concrete masonry units NCL include,included SCR smoke
<br /> detector
<br /> rod CLEARANCES FOR INSTALLATION AND MAINTENANCE OF THE ABOVE (ATTIC)R-49 MIN.
<br /> COL column NSUL insulate,insulation SD smoke detector EQUIPMENT. CONSTRUCTION TYPE VB CEILING INSULATION(VAULTED)R-38 MIN.
<br /> SHEET NUMBER INSULATED WALLS R-21 MIN.
<br /> CONC concrete NST install,installed SECT section 12.THE CONTRACTOR SHALL SUPERVISE MID DIRECT THE WORK USING HIS/HER SLAB EDGE R-10
<br /> CONST construction NT interior SF square feet,store front BEST SKILL AND ATTENTION.MEISHE SHALL BE SOLELY RESPONSIBLE FOR ALL
<br /> CONT continuous SFTY safetyWALL MODIFIER CONSTRUCTION MEANS,METHODS.TECHNIOUES,SEQUENCES MID PROCEDURES FLOOR AREA(SF) LIVING GARAGE FLOOR R-38 MIN.
<br /> �OPALL TYPE AND FOR COORDINATING ALL PORTIONS OF THE WORK UNDER THE
<br /> CONTRcontrzctor,contract JST joist SHT sheet MODIFIER CONTRACT.
<br /> CORR corrugated JT Joint SIM similar f GROUND LEVEL 1,250 SF ENERGY CREDIT NOTES(1.5 CREDITS NEEDED):
<br /> CR corrosion resistant SJ seismic joint 13.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACTS AND OMISSIONS EXISTING BASEMENT LEVEL N/A 1.OPTION 1c(CREDIT 2.0)EFFICIENT BUILDING
<br /> CSMT casement KO knockout SLNT sealant of HIS/HER EMPLOYEES.SUBCONTRACTORS AND THEIR AGENTS AND EXISTING DETACHED PARKIN SPACE 1,277 SF ENVELOPE
<br /> EMPLOYEES,AND OTHER PERSONS PERFORMING ANY WORK UNDER A
<br /> CT ceramic tile KPL kickplate SND sanitary napkin dispenser ROOM AND FINISH TAG CONTRACT WITH THE CONTRACTOR.
<br /> CYD cubic yards SNIT sanitary napkin receptacle
<br /> L left,ion lengthSOG slab ongrade LOBBY—ROOM NAME MA.THE CONTRACTOR SHALL PURSUE WORK IN A CONTINUOUS AND DILIGENT
<br /> 9, MANNER TO INSURE TWO/COMPLETION OF THE PROJECT.
<br /> D deep,depth LAM laminate,laminated SP sound proof 100—ROOM NUMBER
<br /> DEL double LAV lavatory SQ square III —FINISH GROUP 18.THE CONTRACTOR AT ALL TIMES SHALL KEEP THE PREMISES FREE FROM TOTAL LIVING AREA 1,250 SF OSF
<br /> DO deck drain LBL label SS stainless steel ACCUMULATION OF WASTE MATERIALS OR RUBBISH CAUSED BY HIS/HER
<br /> DF drinkingfountain LH left hand SSS stainless steel shelf GRID LINE AND GRID NUMBER OPERATIONS AT THE COMPLETION OF THE WORK.NEOHE SHALL REMOVE REQUIRED SEPARATION NO
<br /> ALL HOMER WASTE MATERIALS AND RUBBISH FROM AND ABOUT THE PROJECT
<br /> DIA diameter LT light STD standard AS WELL AS ALL HIS/HER TOOLS,CONSTRUCTION EQUIPMENT.MACHINERY.
<br /> DIAG diagonal LW lightweight STL steel CIAND SURPLUS MATERIALS. 6OF STORIES 1
<br /> DIM dimenion,dimensional STOR store,storage 16.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION AND/OR FULLY SPRINKLERED - NO
<br /> - DIV divide,division MAS masonry STRUCT structural PROTECTION OF ALL OUSTING AND PROPOSED PIPING.UTILITIES,
<br /> DN down MATL material SYM symmetric DATUM POINT STRUCTURES.ADJACENT STREETS.AND IMPROVEMENTS DURING THE PERIOD OF
<br /> DR door MAX maximum SYN synthetic 0 CONSTRUCTION.
<br /> DS downspout MB marker board SYS system r,UNLESS OTHERWISE PROI.TDED IN ThE CONTRACT DOCUMENTS,THE VICINITY MAP
<br /> DT drain tile MBR member CONTRACTOR SHALL PROVIDE AND PAY FOR ALL LABOR.MATERIAL,
<br /> DTL detail MDF medium density T tempered EQUIPMENT.TOOLS.CONSTRUCTION EQUIPMENT.MACHINERY,WATER,
<br /> HEAT.UTILITIES,TRANSPORTATION.AND OTHER FACILITIES AND SERVICES
<br /> DW dishwasher fiberboard T&G tongue&groove RELITE NUMBER NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF THE WORK.
<br /> DWG drawing MDO medium density TB towel bar Rpi# i/1 a: p • 1 >/^r „ -- -
<br /> DWR drawer overlay TEL telephone -�� 19.WH ERE CONFLICTS OCCUR,COORDINATE THE LAYOUT AND EXACT 1,Y ay, •- "- 1 r
<br /> LOCATION OF ALL PARTITIONS.DOORS.TELEPHONES AND 1.
<br /> MECH mechanical THK thickness ELECTRCALCOMMUNICATION OUTLETS AND SNATCHES WITH DESIGNER IN .Pp ax t L'-
<br /> E east MED meduim TO top of WINDOW TAG THE FIELD BEFORE PROCEEDING WITH CONSTRUCTION. co - '''3 ,K, , fi 061 pa'
<br /> (E) existing MFR manufacturer TOL tolerance 18.WHERE CONFLICT IS ENCOUNTERED BETWEEN THE CONTRACT DOCUMENTS G
<br /> EA each MH mop hook TOP top of parapet O THAT WILL MATERIALLY AFFECT THE QUALITY OR EXTENT OF THE WORK,
<br /> EF exhaust fan MIN minimum TOW top of wall SUCH CONFLICT SHALL BE RESOLVED TO THE SATISFACTION OF THE DESIGNER t;� - -
<br /> EG existing grade MIR mirror TPD toilet paper dispenser BEFORE THE AFFECTED ITEMS AND/OR MATERIALS ARE PURCHASED.FABRICATED ,,t6' /UT �6:. '
<br /> AND/OR INSTALLED- - L.T I IRS` an=
<br /> EJ expansion joint MISC miscellaneous TTD toilet tissue dispenser OAR Prtt.mm
<br /> REVISION NUMBER _.w s$
<br /> EL elevation MO masonry opening N television ARE20 TORE PNE MANUFACTURED OR PREFABRCATED ITEMS ANDOR MATERIALS 3 ? I
<br /> ELEC electrical MOD modify, TYPtypical A- TO BE INSTALLED-THE CONTRACTOR SHALL VERIFY ROUGH OR FINISHED yy 2
<br /> ty REVISION TAGLO DIMENSIONS IN THE FIELD PRIOR TO PURCHASE OR FABRICATION. , q
<br /> ELEV elevator MR moisture-resistant REVISION CLOUD I y t NI
<br /> EMER emergency MST metal spankrel panel UNO unless noted otherwise '
<br /> 21.THE CONTRACTOR SHALL GUARANTEE ALL WORK AND MATERIALS ATE TO BE •
<br /> ENCL enclosure,enclose MT mount UL Underwriters Laboratory FREE FROM DEFECTS FOR A MINIMUM OF ONE YEAR FROM DATE OF FINAL I f 6% j 0 •A r , a —Is
<br /> EQ equal MTL metal ACCEPTANCE.AND PROMPTLY REMEDY SUCH DEFECTS AND ANY SUBSEQUENT -L- i y6" ' $ g' R �' .at,4444 '
<br /> EQP equipment VB vapor barrier FEC EMERGENCY DAMAGE CAUSED BYTHEDEFECTS OR REPAIR THEREOF.AT NO EXPENSE TO $Ii R ( °`� ,B '1YSP$i�8
<br /> h EGRESS LL HT THE OWNER.GUAMNTEE PERIODS OF GREATER THAN ONE YEAR MAY BE 1 1
<br /> EST est mate estimated N north VCT Vinyl COmpO61t¢til¢ Y p REQUIRED AND CONTAINED WITHIN THE CONTRACT DOCUMENTS 5 r.1,r) � f ctiur.,:iar,v..,,,,,,,:viii.,,,,,,.,,,
<br /> 0 • rjRJE $ qP `l ..
<br /> EXH exhaust NAT natural VERT vertical ivlalen ; �•, fAllTa4.�$#*"EXP expos¢,exposed NI nickel VG vertical grain 22.UNLESS OTHERWISE PROVIDED IN THE CONTRACT DOCUMENTS THE Ii E EXST existin NIC not in contract VIF veri n field EXHAUST FAN AND DUCT CONTRACTOR SHALL SECURE AND PAY FOR THE BUILDING PERMIT AND FOR ALL � r'l L.I4 49 NI OTHER PERMITS AND GOVERNMENTAL FEES LCENSES AND INSPECTIONS $i .�1' ..T R a' 1
<br /> EXT exterior NMT non-metallic VIN Vinyl `� NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF THE WORK. L'2NK,ilr �p,Y. ; R TL [", t�cY,�gki T,y_r*NO number VJ vent 23.WHERE ANY REM AND/OR MATERIAL IS INDCATED IN THE CONTRACT •• 14, , '1it' �'�✓dA,'6 #' S.
<br /> FCB fiber-cement board NOM nominal VTO vent to outside WATER HEATER DOCUMENTS.ANO NOT NECESSARILY DETAILED IN EACH SPECIFC CASE BUT O ,.p t
<br /> FCT fiber-cement trim NRC nose reduction REQUIRED FOR A COMPLETE AND PROFESSIONAL INSTALLATION SUCH ITEM I f -' .41 ., E.17,-- fr;IH'e ig `'$
<br /> FD floor drain coefficient W west.vude,width JJ AND/OR MATERIAL SHALL BE PROVIDED AS IF SHOWN MID DETAILED IN FULL B-a a Bg'Ag SS J$EY *
<br /> PROVIDE MEANS TO FURNISH AND INSTALL. 9
<br /> FDC fire department coon. NTS not to scale WC water closet I ..-_ -r 'lt11?4Mt$Yl24A.1 #} 3
<br /> FE fire extinguisher WD wood ELEC PANEL ) - (8�$@14'y,gp+®'88A
<br /> FEC fire extinguisher cabinet OA overall W/D washer/dryer 6didRl¢��►3�#1tA a 3 TITLE SHEET
<br /> FF finish floor,frost free, OC on center WH wall hung I - - ^+ f y
<br /> factory finish OD outer diameter WIC walk-in closet WASHING MACHING OUTLET BOX I I,4.1 I �+'r" ' 5. y
<br /> FG finished grade OFCI owner famished- WIN window N Er i -) ` •, ! o®1�JYl cteiNf a C
<br /> FIN finish,finished contractor installed W/O without
<br /> FJ finish joint OFOI owner furnished- WP waterproof 1 a I' _R & �RR�fiI►4 ,r•,, .;-ry core 02/0521
<br /> FLR floor owner installed WPC waterproofing consultant SLAB STEP i „r d ( '- i i JiFASS'?Vt
<br /> FLSH flash,flashing OH overhead WR water resistant I 1 i � n • Sa m / .i
<br /> FLX flexible OPG opening WRB weather-resistive barrier i g } J '= 'z i � �_�'��
<br /> FND foundation OPP opposite WTW wall to wall DOWNSPOUT - °° ;- ? . s ' SMELT 40 G��1
<br /> _ OPQ opaque o DS -'a.^IF 4I Mr!'. _ Al il a t;alma�a at.
<br /> ''e/ J EVERETT
<br /> REVIEWED FOR PERMIT
<br />
|