Laserfiche WebLink
CITY OF EVERETT <br /> EVERETT Permit Services <br /> WASHINGTON <br /> April 8, 2020D ECLEllyE <br /> Ms. Joanne Coghlan JUL <br /> 8 2020 <br /> Email Address:jcoghlan@maxview.com CITY OF EVERETT <br /> RE: Owner: Crux LLC <br /> Permit <br /> Job Address: 5208 S 2nd Avenue <br /> Plan Check Number: B2003-040, First Building Review <br /> Dear Ms. Coghlan, <br /> The proposed project has been reviewed for compliance with the provisions of the building codes <br /> adopted and amended by the state of Washington and the city of Everett. The comments below <br /> must be addressed before a permit can be issued. These comments address building issues only. <br /> Additional revisions or additions may be required by other departments including Public Works, <br /> Planning, and Fire. <br /> Code citations provided in the following comments reference the 2015 International Building Code <br /> (IBC),the 2015 International Existing Building Code(IEBC),the 2015 International Property <br /> Maintenance Code (IPMC),the 2015 International Fire Code(IFC),the 2015 International <br /> Mechanical Code(IMC), and the 2015 International Energy Conservation(IECC),and the 2015 <br /> Washington State Energy Code (WSEC). The current IBC referenced standard for accessible design <br /> is the 2009 "Accessible and Usable Buildings and Facilities"(ICC/ANSI A117.1). Federal ADA, FHA, <br /> and HUD regulations and standards, including the Fair Housing Accessibility Guidelines, may be <br /> more restrictive. References to other design standards include the current edition. <br /> In order for the processing of your application to continue,the following documentation shall be <br /> submitted to the Building Division for review: <br /> a. Itemized letter addressing the comments provided below. <br /> b. Two complete sets of revised construction drawings. <br /> c. Two copies of supplemental structural calculations. <br /> Submittal documents shall contain sufficient information and detail to review the proposed project <br /> for compliance with the adopted codes. Upon submittal of the revised documents,your application <br /> will be given priority and plan reviews will recommence. <br /> Page 1 of4) <br />