My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10306 27TH DR SE 2021-12-15
>
Address Records
>
27TH DR SE
>
10306
>
10306 27TH DR SE 2021-12-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 11:18:31 AM
Creation date
7/13/2021 4:39:12 PM
Metadata
Fields
Template:
Address Document
Street Name
27TH DR SE
Street Number
10306
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
— Sabrina Fandler, P.E. <br />Associate Engineer I Permit Services <br />425.257.7813 13200 Cedar Street, 2"d Floor, Everett, WA 98201 <br />EVERETT Hours: Monday — Friday 7:30am-12:OOpm and 1:OOpm-4:OOpm <br />everettwa.gov/permits I Facebook I Twitter <br />Note: EmaiIs and attachments sent to and from the City of Everett are public records and maybe subject to disclosure pursuant to the Public <br />Records Act. <br />From: Paul McKee <PMckee@everettwa.gov> <br />Sent: Monday, April 29, 2019 7:04 AM <br />To: joel@haackbrothers.com <br />Cc: Tony Lee <TLee @eve rettwa.gov>; Sabrina Fandler <SFandler@everettwa.gov> <br />Subject: Re: Permit c1812-004 <br />Thanks for passing this info along Joel. Yes, whenever possible, application reviews should run concurrently. I am out of <br />the office `til next week, so I am forwarding your message to Tony and Sabrina. <br />-Paul <br />Get Outlook for iOS <br />From: ioel@haackbrothers.com <ioel@haackbrothers.com> <br />Sent: Friday, April 26, 2019 5:25 AM <br />To: Paul McKee <br />Subject: Permit c1812-004 <br />Good morning Paul, I hope you are doing well. <br />I am wondering if you can check on the status of subject permit? It was submitted back in December and was just routed <br />to public works last week. I have noticed on several of my applications that the reviews are done one step at a time <br />instead of simultaneously resulting in lengthy permit lead times. Is the one review at a time the correct process? <br />Thanks for your help. <br />Joel Haack <br />President <br />HAA K <br />BROTHERS <br />H 0 ra E s <br />
The URL can be used to link to this page
Your browser does not support the video tag.