My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021/07/14 Council Agenda Packet
>
Council Agenda Packets
>
2021
>
2021/07/14 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2021 3:57:40 PM
Creation date
7/15/2021 3:54:59 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E V E R E T T City Council Agenda Item Cover Sheet <br />Project title: Design -Build Contract for East Clearwell Roof Replacement — Change Order #1 <br />Council Bill # <br />Agenda dates requested: <br />7/14/2021 <br />Briefing <br />Proposed action <br />Consent 7/14/21 <br />Action <br />Ordinance <br />Public hearing <br />Yes <br />X No <br />Budget amendment: <br />Yes X No <br />PowerPoint presentation: <br />Yes X No <br />Attachments: <br />Summary <br />Department(s) involved: <br />Public Works <br />Contact person: <br />Tom Fuchs <br />Phone number: <br />(425) 257-8931 <br />Email: <br />tfuchs@everettwa.gov <br />Initialed by: <br />2 LS <br />Department head <br />Administration <br />Council President <br />Consideration: <br />Project: <br />Partner/Supplier: <br />Location: <br />Preceding action: <br />Fund: <br />Change Order #1 <br />East Clearwell Roof Replacement (UP3662) <br />Shearer and Associates, Inc. <br />Water Filtration Plant, Chaplain Reservoir <br />Award for Design -Build Contract for East Clearwell Roof Replacement <br />336 - Work Order UP3662 <br />Fiscal summary statement: <br />Original Contract Amount: $3,107,368.00 (exclusive of WSST) <br />Change Order Number 1: $17,415.96 (exclusive of WSST) <br />Revised Contract Amount: $3,124,783.96 (exclusive of WSST) <br />Project summary statement: <br />Change Order #1 adds funds to the Contract to pay for the purchase of a level indicating <br />transmitter, purchase of cable tensioning equipment, repair of floor joint seals and for <br />the supply and installation of additional truss plates at various truss connection <br />locations along the exterior walls of the Clearwell structure. Change order #1 also <br />modified the project Substantial Completion date from September 30th, 2020 to May <br />24th, 2021 to account for Covid related material and supply chain issues. <br />Recommendation (exact action requested of Council): <br />Authorize the Mayor to sign Change Order #1 with Shearer and Associates, Inc. for the <br />design -build construction of the Water Filtration Plant East Clearwell Roof Replacement <br />in the amount of $17,415.96, not including Washington State sales tax. <br />
The URL can be used to link to this page
Your browser does not support the video tag.