Contractor and City agree as follows: <br />1. The scope of Work shall be changed to the extent described in Exhibit A. <br />2. \\'ith the exception of Washington State sales tax, the amount of the change order for <br />the changes described in Exhibit A, represents complete compensation for the changes <br />described in Exhibit A, including all direct and indirect costs and impacts. The contract <br />price shall be adjusted as described in this Change Order. <br />3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the <br />Mayor or his designee is authorized to direct Contractor to perform additional work. In <br />calculating such threshold amounts, Washington State sales tax, if applicable to the <br />Work, has been considered. <br />Project: WFP East Clearwell Roof Replacement <br />Change Order No. 01 <br />Change Order Effective Date: June 18, 2021 <br />4. The duration of the Contract shall be adjusted to the extent described in this Change <br />Order. <br />5. Contractor waives and releases any and all claims arising out of, or related to, this <br />Change Order, the work described in Exhibit A, and all work and actual or constructive <br />changes that occurred or began prior to the date of this Change Order, including, but <br />not limited to, claims for equitable adjustment of time and compensation, delay, impact, <br />overhead, or inefficiencies. This provision does not apply to requests for equitable <br />adjustment of time or price for which the Contractor timely and properly provided <br />notice of a differing site condition, protest, dispute, claim or Contract Claim as required <br />by the Contract Documents. If the Contract Documents establish a time period for <br />notice of a differing site condition, protest, dispute, claim, or Contract Claim that ends <br />after the date of this Change Order, but relates to work performed prior to the date of <br />this Change Order, then this provision does not apply if the Contractor timely and <br />properly submits such notice <br />6. This Change Order only changes the contract between Contractor and City to the <br />extent explicitly provided herein. <br />CITY <br />Mayor <br />Date: <br />Attest: Approved As to Form: <br />City Clerk City Attorney <br />Date: Date: <br />Recommended By: <br />Construction <br />Manager (if <br />applicable) <br />dlav7U <br />G��ikd <br />Date: <br />--2,/ <br />Project Engineer (if Engineering <br />applicable) Manages (if <br />applicable) <br />Date: <br />Department Director <br />Date: D 4e: i. %zoo( <br />Page 2 of 4 <br />