My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 7/12/2021
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 7/12/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2022 11:55:38 AM
Creation date
7/16/2021 11:10:23 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
7/12/2021
Council Approval Date
5/26/2021
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2021 WPCF Trickling Filter Media Replacement
Public Works WO Number
UP3742-3
Tracking Number
0002980
Total Compensation
$1,212,690.49
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 5/13/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' City of Everett 00 7200 - 7 <br /> 2021 Trickling Filter Media Replacement UP 3742-3 <br /> 2.3.2. Conflicting Provisions <br /> Figure dimensions on drawings shall govern over scale dimensions and detail drawings shall govern over <br /> general drawings. In the event an item of Work is described differently in two or more locations on the <br /> ' Drawings and in the Specifications,the Contractor shall,upon request of the Owner's Representative, <br /> submit in writing to the Owner's Representative the description upon which the Contractor relied in <br /> preparing its Bid or laying out the Work. If the Owner's Representative directs the Contractor to perform <br /> ' Work in a manner other than that contemplated by the Contractor in preparing its Bid or laying out the <br /> Work,Change Order procedures will be followed. In this event,the Contractor shall submit to the <br /> Owner's Representative such supporting information,including bidding or layout documents, as may <br /> reasonably be necessary for the Owner's Representative to determine whether the Contract Sum is <br /> increased, decreased or unchanged by the Change Order. <br /> 2.3.3. Utilities <br /> ' 2.3.3.1 General <br /> The Owner has endeavored to determine the existence of utilities at the Site of the Work from the records <br /> of the owners of known utilities in the vicinity of the Work. The positions of these utilities as derived <br /> ' from such records are shown on the Drawings. No excavations were made to verify the locations shown <br /> for underground utilities. The service connections to these utilities are not shown on the Drawings. It <br /> shall be the responsibility of the Contractor to determine the exact location of utilities and service <br /> ' connections thereto. Such field verification must be performed in sufficient time so as not to impede the <br /> progress of the Work or fabrication of materials to be incorporated into the Work. The Contractor shall <br /> call the Utility Location Request Center(one call center)for location of utilities in the field not less than <br /> two (2)nor more than(10)ten business days before the scheduled date of commencement of excavation. <br /> The Contractor shall make its own investigations, including exploratory excavations,to determine the <br /> locations and type of existing utilities,including service connections,prior to commencing work that <br /> ' could result in damage to such utilities. The Contractor shall immediately notify the Owner's <br /> Representative as to any utility discovered by him in a different position than shown on the Drawings or <br /> which is not shown on the Drawings. No excavation shall begin until all known facilities in the <br /> ' excavation areas have been marked. Contractor shall coordinate its activities with the utility provider. <br /> Contractor shall bear the cost of maintaining utility service. <br /> The Contractor should be aware of,and comply with, Chapter 19.122 RCW,a law relating to <br /> ' underground utilities. The Owner shall not pay Contractor any of Contractor's cost of complying with <br /> this law, or repairing or indemnifying any damage or injury arising out of Contractor's failure to comply <br /> with this law. <br /> ' Owner does not represent or warrant who may be obligated to pay for the cost of relocation or temporary <br /> maintenance of the utility. Contractor shall investigate whether such cost must be borne by the owner of <br /> the utility. <br /> ' Governmental agencies and owners of utilities reserve the right to enter upon streets, alleys,rights-of- <br /> way,or easements for the purpose of making changes in their property made necessary by the Work and <br /> for the purpose of maintaining and making repairs to their property. <br /> 2.3.3.2 Known Utilities <br /> The Contractor shall provide at its sole expense all labor,equipment,materials and services necessary to <br /> remove,relocate,or maintain utilities specified on the Drawings. The work on each utility shall be <br /> performed in a manner satisfactory to the utility owner. The utility owner has the option of doing such <br /> work with its own forces at the Contractor's expense, or permitting the work to be performed by the <br /> ' Contractor. <br /> 2.3.3.3 Service Connections <br /> Locations of service connections are not identified on the Drawings. The Contractor shall provide at its <br /> ' sole expense all labor, equipment and material to remove,relocate or maintain service connections. Work <br /> 00 7200 - 7 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.