My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 7/12/2021
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 7/12/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2022 11:55:38 AM
Creation date
7/16/2021 11:10:23 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
7/12/2021
Council Approval Date
5/26/2021
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2021 WPCF Trickling Filter Media Replacement
Public Works WO Number
UP3742-3
Tracking Number
0002980
Total Compensation
$1,212,690.49
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 5/13/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' City of Everett 00 7200 - 11 <br /> 2021 Trickling Filter Media Replacement UP 3742-3 <br /> Bidder Qualification Statement. Contractor shall submit personnel qualifications within ten(10)days of <br /> Contractor's execution of the Contract. Bases for disapproval include,but are not limited to,lack of <br /> sufficient experience managing the construction of similar type or size projects or relationships on other <br /> projects unsatisfactory to the Owner. Owner may require removal and replacement of Contractor's <br /> supervisory staff who are disruptive or who appear to lack sufficient competence to complete the Project <br /> successfully. <br /> 4.2. CONSTRUCTION PROCEDURES <br /> The Contractor shall supervise and direct the Work and determine the means,methods,techniques, <br /> sequences and procedures of construction, except in those instances where the Owner,to define the <br /> quality of an item of Work, specifies in the Contract, a means,method,technique, sequence or procedure <br /> for construction of that item of Work. <br /> 4.3. SUBCONTRACTORS <br /> Unless explicitly specified elsewhere in the Contract Documents or expressly authorized in writing by the <br /> Owner before Contractor submits its Bid,the Contractor shall perform with its own organization at least <br /> ' one-third of the Work by dollar volume and Contractor shall not sublet to a single Subcontractor more <br /> than one-half of the Project. A Subcontractor of the Contractor shall not sublet to another Subcontractor <br /> more than one-half of its work without the written consent of the Owner obtained within twenty(20) days <br /> of award of the Contract to the Contractor. The Owner may refuse to approve such subcontract for any <br /> reason. Only unit price and Schedule of Value items of the Contract will be used in computing the total <br /> Work. The Owner may,at its sole option,refuse to approve a Subcontractor that is also providing <br /> ' services to the Owner on the same project. <br /> Subcontractors will be considered agents of the Contractor and their work shall be subject to the <br /> provisions of the Contract. References in the Contract Documents to actions required of Subcontractors, <br /> manufacturers, Suppliers,or persons other than the Contractor,the Owner or the Owner's Representative <br /> shall be interpreted as requiring that the Contractor shall require such Subcontractor,manufacturer, <br /> Supplier or Person to perform the specified action. <br /> Contractor shall comply with RCW 39.04.250 and RCW 39.76.011,as amended,and any successor and <br /> other laws, ordinances, and regulations regarding payment of Subcontractors. Contractor shall also <br /> comply with the requirements of RCW Chap. 60.28 and any other law,ordinance, or regulation relating to <br /> ' the release of retainage to Subcontractors. <br /> The Contractor shall specifically include in each of its first tier subcontracts the language in this section <br /> with regard to the Subcontractor's obligation to meet bidder responsibility criteria,and shall require each <br /> of its Subcontractors to include substantially the same language of this section in each of their <br /> subcontracts, adjusting only as necessary the terms used for the contracting parties. The requirements of <br /> this section apply to all Subcontractors regardless of tier. <br /> ' At the time of subcontract execution,the Contractor must verify that each of its first tier subcontracts <br /> meets the following bidder responsibility criteria: <br /> 1. At the time of subcontract Bid Submittal,have a certificate of registration in compliance with <br /> ' Chapter 18.27 RCW; <br /> 2. Have a current state unified business identifier number; <br /> 3. If applicable,have: <br /> a. Industrial insurance coverage for the Subcontractor's employees working in Washington as <br /> required in Title 51 RCW; <br /> ' b. An employment security department number as required in Title 50 RCW' <br /> c. A state excise tax registration number as required in Title 82 RCW; <br /> ' d. An electrical contractor license, if required by Chapter 19.28 RCW; <br /> 00 7200 - 11 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.