My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 7/12/2021
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 7/12/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2022 11:55:38 AM
Creation date
7/16/2021 11:10:23 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
7/12/2021
Council Approval Date
5/26/2021
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2021 WPCF Trickling Filter Media Replacement
Public Works WO Number
UP3742-3
Tracking Number
0002980
Total Compensation
$1,212,690.49
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 5/13/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 2113 - 10 I <br /> 2021 Trickling Filter Media Replacement UP 3742-3 <br /> and agents to the Subcontractor shall be submitted to the Employment I <br /> Standards Division, State Department of Labor and Industries, Olympia, <br /> Washington. If the prime contract is over $1,000,000, then Contractor also <br /> needs to submit L&I Form F700-164-000 (Affidavit of Wages Paid EHB I <br /> 2805 Addendum). <br /> 6. Weekly Statement with Respect to Payment of Wages (U.S. Dept of Labor <br /> Form WH347): Contractors, Subcontractors, and agents to Subcontractors I <br /> using Payroll Form WH347 may use State of Compliance found on the back <br /> of the form. <br /> 7. Weekly Statement of Compliance (U.S. Dept of Labor Form WH348). I <br /> Contractors, Subcontractors, or agents to Subcontractors not using Payroll <br /> Form WH347 shall attach the Statement of Compliance Form WH348 to <br /> each payroll. I <br /> 8. Approval of Subcontractors: Contractors shall request approval of <br /> Subcontractors on a form provided by the City prior to their working on the <br /> Site. I <br /> 9. Construction Progress Schedule: To be submitted as required by Section <br /> 00 7200, Part 5 "Progress and Completion", of the Contract Documents by I <br /> the Contractor within ten calendar days, or such time as determined by the <br /> City, after the date of receipt of Notice to Proceed. <br /> 10. Traffic Control Plan: Standard Traffic Control Plans are included in the I <br /> City's Design and Construction Standards. If, and to the extent, such plans <br /> are not sufficient, complete or adequate to support the Bidder's planned <br /> means and methods of performing the Work, the Bidder must develop an <br /> adequate, complete and sufficient traffic control plan at its cost, that shall <br /> be submitted for the City's approval prior to construction. Deviation from <br /> the Standard Plans must be submitted by the Contractor and approved by I <br /> the City prior to construction. <br /> 11. Disposal Sites: Provide the City with the location of all disposal sites to be <br /> used, and also provide copies of the permits and approvals for such I <br /> disposal sites. The Contractor shall provide the City with copies of all <br /> permits for disposal and storage of surplus materials within ten calendar <br /> days after award of the Contract. <br /> 1.23 POSTPONEMENT OF OPENING I <br /> A. The City reserves the right to postpone the date and time for receiving or opening <br /> of Bids, or both, at any time prior to the date and time established in the Notice <br /> to Bidders. Postponement notices shall be provided to Bidders in the form of <br /> addenda. <br /> I <br /> I <br /> 00 2113 - 10 INSTRUCTIONS TO BIDDERS I <br />
The URL can be used to link to this page
Your browser does not support the video tag.