My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 7/12/2021
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 7/12/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2022 11:55:38 AM
Creation date
7/16/2021 11:10:23 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
7/12/2021
Council Approval Date
5/26/2021
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2021 WPCF Trickling Filter Media Replacement
Public Works WO Number
UP3742-3
Tracking Number
0002980
Total Compensation
$1,212,690.49
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 5/13/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 7200 - i <br /> I <br /> 2021 Trickling Filter Media Replacement UP 3742-3 <br /> I SECTION 007200 <br /> GENERAL CONDITIONS <br /> CONTENTS <br /> I1. GENERAL INFORMATION 1 <br /> 1.1 Definitions of Words and Terms 1 <br /> I 1.2. Contract Documents 5 <br /> 2. SPECIFICATIONS AND DRAWINGS 5 <br /> 2.1. Interpretation of Specifications and Drawings 5 <br /> I2.2. Division of Specifications and Drawings 6 <br /> 2.3. Discrepancies in Specifications and Drawings 6 <br /> I 2.3.1. Errors and Omissions 6 <br /> 2.3.2. Conflicting Provisions 7 <br /> 2.3.3. Utilities 7 <br /> I 2.3.3.1 2.3.3.2 General 7 <br /> Known Utilities 7 <br /> 2.3.3.3 Service Connections 7 <br /> I <br /> 2.3.3.4 Unknown Utilities 8 <br /> 2.4. Submittals 8 <br /> 2.5. Contractor's Copies of Contract Documents 8 <br /> I3. OWNER 8 <br /> 3.1. General 8 <br /> I 3.2. Owner's Representative 9 <br /> 4. CONTRACTOR 10 <br /> I 4.1. Contractor's Representative 10 <br /> 4.2. Construction Procedures 11 <br /> 4.3. Subcontractors 11 <br /> I 4.4. Responsibilities 12 <br /> 4.4.1. Subcontractors,Manufacturers and Suppliers 12 <br /> 4.4.2. Contractor's Employees 12 <br /> I <br /> 4.4.3. Payment for Labor and Materials 12 <br /> 4.4.4. Attention to Work 12 <br /> 4.4.5. Safety 12 <br /> I4.4.6. Threats,Intimidation and Harassment Forbidden 13 <br /> 4.4.7. Weapons Forbidden 13 <br /> 4.4.8. Safety Standards 13 <br /> I4.4.9. Public Safety and Convenience 13 <br /> 4.4.10.Access to Work 13 <br /> I 4.4.11. Emergencies 14 <br /> 4.4.12. Trench Excavation 14 <br /> 4.5. Owner-Contractor Coordination 14 <br /> I 4.5.1. Service of Notice 14 <br /> 4.5.2. Suggestions to Contractor 14 <br /> I00 7200 - i GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.