My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 7/12/2021
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 7/12/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2022 11:55:38 AM
Creation date
7/16/2021 11:10:23 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
7/12/2021
Council Approval Date
5/26/2021
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2021 WPCF Trickling Filter Media Replacement
Public Works WO Number
UP3742-3
Tracking Number
0002980
Total Compensation
$1,212,690.49
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 5/13/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 2 <br /> 2021 Trickling Filter Media Replacement UP 3742-3 <br /> Contractor: The individual or entity with whom Owner has entered into the Agreement. <br /> Day: Calendar day,unless explicitly stated otherwise. <br /> Delay: Any increase of the duration of the critical path of the Project. <br /> Dispute: Any controversy or disagreement. <br /> Drawings: That part of the Contract Documents that graphically shows the scope,extent, and character of <br /> the Work to be performed by Contractor. Shop Drawings and other Contractor Submittals are not ' <br /> Drawings as so defined. <br /> Effective Date of Agreement: See 18.10 EFFECTIVE DATE. <br /> Engineer: An individual or entity retained by the Owner to be the Owners representative with regard to <br /> matters of design intent. The terms"Owner's Representative", "Engineer" and"Architect"are <br /> interchangeable. <br /> Equipment: Mechanical, electrical, instrumentation, or other devices with one or more moving parts, or <br /> devices requiring an electrical,pneumatic, electronic, or hydraulic connection. <br /> Extended Overhead: The increase in Overhead costs attributable to an extension of Contract Time. ' <br /> Extra Work: Providing materials and Equipment and the performance of Work not directly called for in, <br /> or implied by,the Contract Documents, such that Contractor would be entitled to an adjustment of <br /> Contract Sum and possibly an extension of Contract Time. <br /> Field Order: A written order issued by Owner's Representative that requires minor changes in the Work, <br /> but does not involve a change in the Contract Sum or the Contract Time. <br /> Final Acceptance: Formal action by Everett City Council determining that all of the Contractor's Work <br /> has been completed, except for any landscaping maintenance. <br /> Float: The amount of time between the early start date and the late start date, or the early finish date and <br /> the late finish date of any activity in the project schedule. <br /> Force Account: Costs of performing Work as defined in 9.6.FORCE ACCOUNT. <br /> Furnish,Install,Perform,Provide, Supply: The word"Furnish" or the word"Install" or the word <br /> "Perform" or the word "Provide" or the word"Supply," or any combination or similar directive or usage <br /> thereof, shall mean furnishing and incorporating in the Work including all necessary labor,materials, <br /> equipment, and everything necessary to perform the Work indicated,unless specifically limited in the <br /> context used. <br /> General Conditions: This Section 007200 of the Contract Documents. <br /> May: Conduct that is permitted,but not required. <br /> Milestone: A principal event specified in the Contract documents relating to an intermediate completion <br /> date or time prior to Substantial Completion of all the Work. ' <br /> Notice: A signed,written communication by the Contractor to the Owner as described in ARTICLE 10. <br /> NOTICE TO OWNER. <br /> Notice to Proceed: The written Notice from the Owner or Owner's Representative to the Contractor <br /> authorizing and directing the Contractor to proceed with the Work and establishing the date on which the <br /> Contract Time begins. Multiple and partial Notices to Proceed may be issued on a single Project. <br /> Over-absorbed Overhead: Over recovery of fixed indirect costs that occurs when a Contractor performs <br /> more overall Work than it otherwise would have performed. <br /> Overhead: For the purpose of calculating additional compensation under this section of the Contract, <br /> Overhead shall include only those costs that are expended for the administration of the business as a <br /> whole. Such costs usually accrue or are incurred due to the passage of time,and cannot be traced to a <br /> particular project or Contract. Examples of possible Overhead costs include,but are not limited to, 1 <br /> 00 7200 - 2 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.