Premier Field Development Inc. 6/21/2021 Change Order 3
>
Contracts
>
Capital Contract
>
Premier Field Development Inc. 6/21/2021 Change Order 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:46:46 AM
Creation date
7/16/2021 11:46:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Premier Field Development Inc.
Approval Date
6/21/2021
Department
Parks
Department Project Manager
Dean Shaughnessy
Subject / Project Title
Phil Johnson Ballfields Renovation
Amendment/Change Order
Change Order
Amendment/Change Order Number
3
Tracking Number
0001860
Total Compensation
$40,672.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Premier Field Development Inc 6/25/2019
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Phil Johnson Ballfields Renovation <br /> Change Order No. 003 <br /> Change Order Effective Date: 7/1/2020 <br /> Contractor and City agree as follows: <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. With the exception of Washington State sales tax,the amount of the change order for <br /> the changes described in Exhibit A, represents complete compensation for the changes <br /> described in Exhibit A, including all direct and indirect costs and impacts. The contract <br /> price shall be adjusted as described in this Change Order. <br /> 3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the <br /> Mayor or his designee is authorized to direct Contractor to perform additional work. In <br /> calculating such threshold amounts,Washington State sales tax, if applicable to the <br /> Work,has been considered. <br /> 4. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 5. Contractor waives and releases any and all claims arising out of, or related to, this <br /> Change Order,the work described in Exhibit A, and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order, including, but <br /> not limited to,claims for equitable adjustment of time and compensation,delay, impact, <br /> overhead,or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition, protest, dispute, claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition, protest,dispute, claim, or Contract Claim that ends <br /> after the date of this Change Order,but relates to work performed prior to the date of <br /> this Change Order,then this provision does not apply if the Contractor timely and <br /> properly submits such notice <br /> 6. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> CITY <br /> Attest: Approved As to Form: <br /> Office of the City Attorney <br /> ......(1 <br /> APPROVED AS TO FORM <br /> i �f/Lf David C.Hall,City Attorney <br /> Mayor ,, City Clerk City Attorney <br /> (i/I �•?, <br /> Date: ( - 2 r Date: -gl'�d--1 Date: 6e. ( 21 <br /> Recommended Br: <br /> —1 Digital <br /> Department Director <br /> Dean Dean ma a sy �") / <br /> Shaughnessy °at <br /> 11:27:29-07'00' <br />