My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish County PUD 6/29/2021
>
Contracts
>
Agreement
>
Interlocal Agreements
>
Snohomish County PUD 6/29/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:15 AM
Creation date
7/16/2021 2:12:58 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish County PUD
Approval Date
6/29/2021
Council Approval Date
6/2/2021
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
WFP Fiber Optic Cable Master Agreement
Tracking Number
0002983
Total Compensation
$88,680.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Scope of Work and Fee Schedule pertaining to any additional work to be performed by <br /> Licensor, if applicable(see Attachment 3 hereto): <br /> 6. Drawings Received by Licensor: The Licensor has received required drawings. <br /> 7. Site Access Details and Provisions: Access to the Fiber is available at the demarcation <br /> boxes already installed. <br /> 8. Licensor Acceptance Testing: Licensor has tested the Cable to ensure that it meets the <br /> Specifications set forth in Attachment 2 hereto. The results of Licensor's tests have been <br /> reviewed by Licensee and are attached as Attachment 4 hereto. <br /> 9. Licensee Acceptance Testing: As per Exhibit B. <br /> Date of Satisfactory Completion of Acceptance Testing: <br /> 10. Coordination Provisions between Licensor and Licensee: The Licensor shall be present <br /> and inspect (at no additional charge) all installation work performed by Licensee or its <br /> representatives. Licensor and Licensee shall coordinate any changes to the configuration <br /> by letter to the contact names and addresses already listed in this document. <br /> 11. Annual Fee: Beginning on the date of satisfactory completion of Licensee Acceptance <br /> Testing,which shall be identified below and initialed by each party subsequent to execution <br /> of this FLA,the Annual Fee for use of the Licensee Fibers, Buildings and Licensee Space • <br /> and installation and maintenance services provided by the Licensor, excluding those <br /> services identified in Attachment 3 to this Fiber License Acknowledgment for which <br /> additional charges may be assessed, shall be $17,556 (subject to the automatic increases <br /> specified in Exhibit C hereto),payable annually in advance on the anniversary date of such <br /> date. <br /> 12.Initial Payment: <br /> Summary: <br /> Rate: $ <br /> SNOPUD Electric Building to Jackson Power House(50%of standard rate) <br /> 25.92 per fiber/mile/month. <br /> 2 fiber/26.96 miles/$ 1,397.61 per month <br /> Section between Jackson Power House and the Filtration Plant(25%of standard <br /> rate) <br /> 2 <br /> Fiber Optic Cable Master License Agreement <br />
The URL can be used to link to this page
Your browser does not support the video tag.