My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish County PUD 6/29/2021
>
Contracts
>
Agreement
>
Interlocal Agreements
>
Snohomish County PUD 6/29/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:15 AM
Creation date
7/16/2021 2:12:58 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish County PUD
Approval Date
6/29/2021
Council Approval Date
6/2/2021
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
WFP Fiber Optic Cable Master Agreement
Tracking Number
0002983
Total Compensation
$88,680.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/22/2020 176009.1 All-Dielectric Self-Supporting Fiber Optic Cable <br /> Span (ft) Initial Tension (lb) Final Tension (lb) % Final Sag <br /> 700 956 1,730 2.6 <br /> 750 1,025 1,824 2.6 <br /> 800 1,093 1,917 2.7 <br /> 850 1,161 2,008 2.7 <br /> 900 1,229 2,098 2.8 <br /> 950 1,298 2,188 2.8 <br /> 14. Environmental Performance <br /> Temperature Ranges <br /> Operation-40°C to +70°C <br /> Installation-30°C to+70°C <br /> Storage/Shipping-50°C to+70°C <br /> 15. Packaging requirements <br /> 10,000 feet on non-returnable reels, unless otherwise specified on the Special Provisions Sheet. Cable reels shall <br /> be shipped upright on flanges. <br /> https://standards.snopud.com/Content/Material/C-Conductors/176009.1.htm 6/6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.