My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish County PUD 6/29/2021
>
Contracts
>
Agreement
>
Interlocal Agreements
>
Snohomish County PUD 6/29/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:15 AM
Creation date
7/16/2021 2:12:58 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish County PUD
Approval Date
6/29/2021
Council Approval Date
6/2/2021
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
WFP Fiber Optic Cable Master Agreement
Tracking Number
0002983
Total Compensation
$88,680.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. Location and road access maps to the points where Licensee has equipment or fiber <br /> connection. <br /> B. Special right of way or property Licensor problems or considerations. <br /> C. Temporary special arrangements for access, where necessary, to allow essential <br /> Licensee personnel to reach the necessary work location. <br /> III. Damage Reporting and Restoration <br /> A. The Licensee Coordination Facility will immediately notify Licensor of locations <br /> experiencing failure indications. <br /> B. Licensor will use its best efforts to respond within four (4)hours to effect service <br /> restoration. <br /> C. Licensor will use its best efforts to provide to the Licensee Coordination Facility <br /> within eight(8)hours the estimated schedule for restoration of the service. <br /> D. Field site managers for Licensor and Licensee will be designated and their identity <br /> will be provided to the Licensor and Licensee Coordination Facilities for coordination of <br /> communications. <br /> E. The Licensor Coordination Facility will provide status reports to the Licensee <br /> Coordination Facility at intervals mutually agreed to by the Licensor and Licensee field site <br /> managers. <br /> F. Licensor will notify the Licensee Coordination Facility when it is safe for personnel i <br /> to begin work if the service interruption affected equipment or facilities maintained by Licensee. <br /> G. Standard Licensor physical restoration techniques, fiber splicing priorities and <br /> order of splicing methods will be used. <br /> H. The replacement cable performance will be tested and verified by Licensor field <br /> and Coordination Facility forces using Licensor standard procedures,test equipment and systems, <br /> and existing performance criteria. <br /> I. If temporary cables, supplied and stored by Licensor, are used for restoration, <br /> Licensor will notify the Licensee Coordination Facility when placement of permanent facilities <br /> have been completed, including testing. <br /> 4 <br /> Fiber Optic Cable Master License Agreement <br />
The URL can be used to link to this page
Your browser does not support the video tag.