Laserfiche WebLink
PROPOSED LAYOUT NOTES Z z <br /> 5 <br /> 169 STORMTECH SC-310 CHAMBERS • MANIFOLD SIZE TO BE DETERMINED BY SITE DESIGN ENGINEER.SEE TECH SHEET#7 FOR MANIFOLD SIZING GUIDANCE. w ACCEPTABLE FILL MATERIALS: STORMTECH SC-310 CHAMBER SYSTEMS o Wti <br /> 40 STORMTECH SC-310 END CAPS • DUE TO THE ADAPTATION OF THIS CHAMBER SYSTEM TO SPECIFIC SITE AND DESIGN CONSTRAINTS,IT MAYBE z <br /> CO CO = o m m = <br /> 6 STONE ABOVE(in) NECESSARY TO CUT AND COUPLE ADDITIONAL PIPE TO STANDARD MANIFOLD COMPONENTS IN THE FIELD. z < = ¢ z < N6 STONE BELOW(in) • THE SITE DESIGN ENGINEER MUST REVIEW ELEVATIONS AND IF NECESSARY ADJUST GRADING TO ENSURE THE CHAMBER o a AASHTO MATERIAL COMPACTION / DENSITY zo =° COVER REQUIREMENTS ARE MET. o o40 NSTONEVOID < z o MATERIAL LOCATION DESCRIPTION a L'• THIS CHAMBER SYSTEM WAS DESIGNED WITHOUT SITE-SPECIFIC INFORMATION ON SOIL CONDITIONS OR BEARING CLASSIFICATIONS REQUIREMENT Y <br /> INSTALLED SYSTEM VOLUME(CF)ABOVE ELEV.=451.76 3 U <br /> 5502 CAPACITY.THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR DETERMINING THE SUITABILITY OF THE SOIL AND w z w <br /> (PERIMETER STONE INCLUDED) = Z FINAL FILL:FILL MATERIAL FOR LAYER'D'STARTS = m C 0 X <br /> PROVIDING THE BEARING CAPACITY OF THE INSITU SOILS.THE BASE STONE DEPTH MAY BE INCREASED OR DECREASED w p U o w p U o <br /> 4806 SYSTEM AREA(ft') --� u FROM THE TOP OF THE'C'LAYER TO THE BOTTOM ANY SOIL/ROCK MATERIALS,NATIVE SOILS,OR PER PREPARE PER SITE DESIGN ENGINEER'S PLANS. -r u <br /> ONCE THIS INFORMATION IS PROVIDED. -� W o W o <br /> 398 SYSTEM PERIMETER(ft) R. CC ° D OF FLEXIBLE PAVEMENT OR UNPAVED FINISHED ENGINEER'S PLANS.CHECK PLANS FOR PAVEMENT N/A PAVED INSTALLATIONS MAY HAVE STRINGENT R. .2 <br /> Cr) W g GRADE ABOVE.NOTE THAT PAVEMENT SUBBASE SUBGRADE REQUIREMENTS. MATERIAL AND PREPARATION REQUIREMENTS. N W m architects _PROPOSED ELEVATIONS Z• W a MAY BE PART OF THE'D'LAYER ¢ W0- N °Le _U461.34 MAXIMUM ALLOWABLE GRADE(TOP OF PAVEMENT/UNPAVED) a z BEGIN COMPACTIONS AFTER 12"(300 mm)OF = ,- Q <br /> w -, AASHTO M145' ~- <br /> 455.34 MINIMUM ALLOWABLE GRADE(UNPAVED WITH TRAFFIC) m g MATERIAL OVER THE CHAMBERS IS REACHED. m o <br /> 454.84 MINIMUM ALLOWABLE GRADE(UNPAVED NO TRAFFIC) F~ U i INITIAL FILL:FILL MATERIAL FOR LAYER'C' GRANULAR WELL-GRADED SOIL/AGGREGATE MIXTURES,<35% A-1,A-2-4,A-3 COMPACT ADDITIONAL LAYERS IN 6"(150 mm)MAX U 1928 43rd Ave E., Ste A <br /> w w STARTS FROM THE TOP OF THE EMBEDMENT FINES OR PROCESSED AGGREGATE. LIFTS TO A MIN.95%PROCTOR DENSITY FOR w ,, w = <br /> 454.84 MINIMUM ALLOWABLE GRADE(BASE OF FLEXIBLE PAVEMENT) di <br /> Lit t- O w C STONE('B'LAYER)TO 18"(450 mm)ABOVE THE OR WELL GRADED MATERIAL AND 95%RELATIVE w w ' w Seattle , W A 98112 <br /> 454.84 MINIMUM ALLOWABLE GRADE(TOP OF RIGID PAVEMENT) > > f- O > <br /> 453.84 TOP OF STONE w o a o TOP OF THE CHAMBER.NOTE THAT PAVEMENT MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU AASHTO M43' DENSITY FOR PROCESSED AGGREGATE w p a 2 0 6 ) 4 5 3 4 0 5 3 <br /> 453.34 TOP OF STONE CHAMBER = SUBBASE MAY BE A PART OF THE'C'LAYER. OF THIS LAYER. MATERIALS.ROLLER GROSS VEHICLE WEIGHT <br /> 3,357,4,467,5,56,57,6,67,68,7,78,8,89, $ s h o e s m i t h c o x . c o m <br /> m NOT TO EXCEED 12,000 lbs(53 kN).DYNAMIC N <br /> 452.30 8"TOP MANIFOLD INVERT 9,10m <br /> IT, <br /> FORCE NOT TO EXCEED 20,000 lbs(89 kN). w <br /> 452.09 12"ISOLATOR ROW CONNECTION INVERT z y z l <br /> 452.09 12"BOTTOM MANIFOLD/CONNECTION INVERT 6 w EMBEDMENT STONE:FILL SURROUNDING THE AASHTO M43' 6 w <br /> z w B CHAMBERS FROM THE FOUNDATION STONE('A' CLEAN,CRUSHED,ANGULAR STONE NO COMPACTION REQUIRED. <br /> 452.01 BOTTOM OF SC-310 CHAMBER i z ° 3,357,4,467,5,56,57 <br /> o LAYER)TO THE'C'LAYER ABOVE. 2 1. w o 451.76 UNDERDRAIN INVERT I} o o °w <br /> 451.51 BOTTOM OF STONE - FOUNDATION STONE:FILL BELOW CHAMBERS 4 1 4 <br /> i o °1 w A FROM THE SUBGRADE UP TO THE FOOT(BOTTOM) CLEAN,CRUSHED,ANGULAR STONE AASHTO M43' PLATE COMPACT OR ROLL TO ACHIEVE A FLAT F 3 <br /> a <br /> j a OF THE CHAMBER. 3,357,4,467,5,56,57 SURFACE. U a <br /> In ° <br /> w z N PLEASE NOTE: ~ <br /> 2 o 1. THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY.THE STONE MUST ALSO BE CLEAN,CRUSHED,ANGULAR.FOR EXAMPLE,A SPECIFICATION FOR#4 STONE WOULD STATE:"CLEAN,CRUSHED, '4 6 o <br /> 5 ANGULAR NO.4(AASHTO M43)STONE". 3 Ir g <br /> RMTECH COMPACTION <br /> REMENTS ARE MET FOR'A'LOCATION MATERIALS WHEN PLACED <br /> NG TWO FULL <br /> VERAGES WITH A VIBRATORY COMPACTOR. <br /> 3. WHOERE INFILTRATION SURFACES MAYBE COMPROMISED BY COMPACTION, STANDARD DESIGN AND <br /> CONDITIONS,A FLAT SURFACE MAY BE ACHIEVED BY RAKING NG OR DRAGGING WITHOUT COMPACTION ON S <br /> 7.12' 56.93' 92.70' u wu <br /> F ;I EQUIPMENT.FOR SPECIAL LOAD DESIGNS,CONTACT STORMTECH FOR COMPACTION REQUIREMENTS. B 3 <br /> • SQ =m <br /> k, O <br /> 1 o o' 1 LAYER OF ADS GEOSYNTHETICS NON-WOVEN GEOTEXTILE ALL AROUND CLEAN 1 o ',St' <br /> E CRUSHED,ANGULAR STONE IN A&B LAYERS,BOTH SIDES OF THERMOPLASTIC LINER. PAVEMENT LAYER(DESIGNED <br /> ,- STRUCTURE SDCB#12 PER PLAN 6 1 SEE STORMTECH'S TECH SHEET#2 FOR NON-WOVEN WEIGHT RECOMMENDATIONS. BY SITE DESIGN ENGINEER) z IL <br /> W/ELEVATED BYPASS MANIFOLD 8 6 _ f { °z, <br /> MAXIMUM INLET FLOW 2.3 CFS ® s ® z N <br /> U N¢ PERIMETER STONE 'TO BOTTOM OF FLEXIBLE PAVEMENT.FOR UNPAVED S -Uy<! U F p o immix <br /> INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY 6"(150 min) 8 U °ow (SEE NOTE 5) OCCUR,INCREASE COVER TO 24"(600 min). 18" (2.4 m) 3 -a =°12"PREFABRICATED END CAP,PART#SC310EPE126 ; o ��w o A w <br /> 4 .Ls = I- (450 mm)MIN* MAXMN ; 81. .. ,,7, .,:_i <br /> TYP OF ALL SC-310 12"BOTTOM CONNECTIONS AND ISOLATOR OWS L ° o ,r" ZQ g --0-: f 1 f 1 i. z� <br /> ISOLATOR ROW INSPECTION PORT STRUCTURE SDCB#13 PER PLAN WIWEIR[RELOCATED] o EXCAVATION WALL O <br /> (SEE DETAIL!TYP 2 PLACES) (TYP 2 PLACES) i- MAXIMUM INLET FLOW 5.2 CFS 8 3 i w A \( 16 ) 8 m o a <br /> CAN BE SLOPED OR VERTICAL V� ll /' w° <br /> w ( ) r����i•�r'� ! r Alf41., r �� � ,r 406 min N � m obethany <br /> Ii 8"X 8"ADS N-12 TOP MANIFOLD 1I Ilita ��--� I . , <br /> 1 °• " T o \ U <br /> o 0 <br /> INVERT 3.5"ABOVE CHAMBER BASE 4�M�1Ti I I I 1 i 12"X 12"ADS N-12 BOTTOM MANIFOLD I 6 i N F L 6"(150 mm)DEPTH OF STONE i 5 N <br /> 1 m (SEE NOTES) (I . t4 1 j INVERT 0.9"ABOVE CHAMBER BASE ���////// • 4 g °° skilled <br /> ca o SC-310 6" o <br /> N 12"ADS N-12 BOTTOM CONNECTION 1 t 1 (SEE NOTES) o o ¢° nursing <br /> r, d 12"(300 min)MIN END CAP 150 min MIN �` "(864 min) y 12"(300 min)MIN \ o a <br /> o of INVERT 0.9"ABOVE CHAMBER BASE 4�®�t ,I g= SUBGRADE SOILS ( ) ° <br /> PLACE MINIMUM 12.5'OF ADS GEOSYNTHETICS > (SEE NOTE 4 NON-WOVEN > <br /> oi (SEE NOTES) I I �i f /- p o ) p o additions <br /> J I 1 ) 315WTK WOVEN GEOTEXTILE OVER BEDDING STONE M >N o a a= GEOTEXTILE >N a <br /> Q I I I - -I I i I AND UNDERNEATH CHAMBER FEET FOR SCOUR m iO o m o o- <br /> NOTES: <br /> PROTECTION AT ALL CHAMBER INLET ROWS z < z 'A <br /> f -�_I I j i I I I I I I I 1 T I T I ! <z w EARTH <z z <br /> ; I I I i I I I I I I ICI I I I �I j �! w °0 1. SC-310 CHAMBERS SHALL CONFORM TO THE REQUIREMENTS OF ASTM F2418"STANDARD SPECIFICATION FOR POLYPROPYLENE(PP)CORRUGATED WALL STORMWATER COLLECTION CHAMBERS",OR ASTM W O o a <br /> p< z F2922"STANDARD SPECIFICATION FOR POLYETHYLENE(PE)CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". z <br /> f _ ' ' ' ' ' ' ' ' ' ► ' ' I ' ' ' p < =w 2235 Lake Heights Drive <br /> } �. ----\ �Q Sz / �Q Sz <br /> O m w 2. SC-310 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787"STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION THERMOPLASTIC o Li <br /> _j m w Q Q <br /> of C6 �= z CHAMBERS". Everett, WA 982�8 <br /> cn �- 6"ADS N-12 DUAL WALL PERFORATED HOPE UNDERDRAIN N °N NON-WOVEN LINER N <br /> THERMOPLASTIC LINER w 3. "ACCEPTABLE FILL MATERIALS"TABLE ABOVE PROVIDES MATERIAL LOCATIONS,DESCRIPTIONS,GRADATIONS,AND COMPACTION REQUIREMENTS FOR FOUNDATION,EMBEDMENT,AND FILL MATERIALS. GEOTEXTILE ♦ w w <br /> OUTLET CONTROL STRUCTURE SDCB#9 PER PLAN (SEE TECH SHEET#2/PROVIDED BY CONTRACTOR) w a m OVERLAP ON TOP SEVERAL <br /> MAXIMUM OUTLET FLOW 2.0 CFS z``. <br /> = 4. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE(ALLOWABLE BEARING CAPACITY)OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH ANGULAR INCHES TO ANCHOR w w <br /> - 136.42' - m STONE m <br /> 3. g CONSIDERATION FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS. 8 <o <br /> J THERMOPLASTIC LINER DETAIL .- <br /> m 5. PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS. �'- o z m <br /> 14.23' -- 142.52' - e z THERMOPLASTIC LINER SHALL BE NON-REINFORCED 30 MIL ;ram z <br /> N°°� 6. ONCE LAYER'C'IS PLACED,ANY SOIL/MATERIAL CAN BE PLACED IN LAYER'D'UP TO THE FINISHED GRADE.MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF POLYVINYL CHLORIDE(PVC).THE LINER SHALL BE PLACED $ g <br /> LAYER'C'OR'D'AT THE SITE DESIGN ENGINEER'S DISCRETION. ALONG THE BOTTOM AND SIDES OF THE CHAMBER SYSTEM. <br /> 156.75' - <br /> SHEET THERE SHALL BE ATLEAST 4 FEET OF MATERIAL OVERLAP AT <br /> SEAMS.REFER TO STORMTECH TECH SHEET FOR MORE SHEET <br /> 2 OF 5 INFORMATION. 3 OF 5 <br /> KEYMAP <br /> o UNDERDRAIN DETAIL SC-310 TECHNICAL SPECIFICATION oB et I- i a iiy <br /> ¢ Z a - STORMTECH STORMTECH ¢ z < N <br /> z t CHAMBERS STORMTECH CHAMBER c_Dz t <br /> a Z W o END ° o of the Northwest <br /> COVER ENTIRE ISOLATOR ROW WITH ADS z w OUTLET MANIFOLD z w <br /> GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE o 2 co ' t 90.7"(2304 mm)ACTUAL LENGTH - 85.4"(2169 mm)INSTALLED LENGTH - o g 2 Z <br /> 5'(1.5m)MINWIDE J W p V o 1 J p U <br /> o I J W ° NO. DATE REVISION <br /> Ce ct <br /> ° DOH CRS <br /> STORMTECH HIGHLY RECOMMENDS SC-310 CHAMBER OPTIONAL INSPECTION PORT >- > (9 C77 I M I it <BUILD ROW IN THIS DIRECTION > 1 01-28-2019 RESPONSE p i <br /> cNi ET <br /> FLEXSTORM PURE INSERTS IN ANY UPSTREAM Q W N z FOUNDATION STONE !* E1A 1 ¢ W a Z <br /> STRUCTURES WITH OPEN GRATES 3 BENEATH CHAMBERS �' I Id I r I' _ ,_ ( CITY OF EVERETT <br /> t - riiiiii iiiiiiiiiiiiiiiiiiiii/iiiiiiii////i/////ii /////iii�// iaiioiiiiitii iiiioioiiiioiiiryoii w • (I° I{ j _ _ m a 3 03.29-2019 RESPONSE 1 (BLDG) <br /> CO I <br /> ''?r y •''4•• ��� 1- U ? IVibe .i �ry L' III ~ _ <br /> ,Sae w wP. 11,o;' - i w w CITY OF EVERETT <br /> v Y Li <br /> 11111 <br /> ELEVATED BYPASS MANIFOLD <br /> w <br /> ui <br /> O - w <br /> TA T IS R END O 1 IH kW <br /> REP NE 1P S O S <br /> s4 4.2 2 1 0 <br /> l I � � � //'' � �� 0 9 0 9 �M <br /> SC30ENDCAP � `% 1� a` <br /> ) <br /> 1 <br /> v''1 <br /> L.,... J I. <br /> O a ADS GEOSYNTHETICS 601T � � w p n, � <br /> INON-WOVEN GEOTEXTILE SECTION A-A DUAL WALL CITY OF EVERETT <br /> PERFORATED 5 05.31-2019 RESPONSE 02(PW) <br /> a: z w <br /> . w HDPE <br /> an z t STORMTECH UNDERDRAIN \- OVERLAP NEXT CHAMBER HERE 3 <br /> i n END CAP (OVER SMALL CORRUGATION) °z,m <br /> -t�l lil lili iliti i!� i° lililiiiiIIIlilililililil MI <br /> a _ = w <br /> SUMP DEPTH TBD BY wisaisommia. 4 y S B B La <br /> CATCH BASIN z o = z o C:1 <br /> SITE DESIGN ENGINEER P ,& =a <br /> (24"[600 mmj MIN RECOMMENDED) - OR MANHOLE TWO LAYERS OF ADS GEOSYNTHETICS 315WTK WOVEN 9 >o 9 w o <br /> FOUNDATION STONE 1 F <br /> 12"(300 mm)HDPE ACCESS PIPE REQUIRED GEOTEXTILE BETWEEN FOUNDATION STONE AND CHAMBERS m << „q illNie <br /> w z BENEATH CHAMBERSA w USE FACTORY PRE-FABRICATED END CAP 4'(1.2 m)MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS w$ ? � 15.6" A 16.0" u 1!, <br /> PART#:SC310EPE12B 1a 5 fVile <br /> (396 min) ��� (406 min)W5 <br /> U W] <br /> r _ �� A ADS GEOSYNTHETICS 601T I P = G� <br /> SC-310 ISOLATOR ROW DETAIL 03 NON-WOVEN GEOTEXTILE ° ° 2,6 <br /> NTS 1 < 9.9" f 34.0" I" / a a PROJECT MANAGER <br /> O 0 0.ti NUMBER AND SIZE OF UNDERDRAINS PER SITE DESIGN ENGINEER (251 min) - - (864 min) - ° o <br /> €< 4"(100 mm)TYP FOR SC-310&SC-160LP SYSTEMS SECTION B-B ° < LDU <br /> 5 r °- 6"(150 mm)TYP FOR SC-740,DC-780,MC-3500&MC-4500 SYSTEMS a k' o`-' <br /> g o o Q o o a PROJECT ENGINEER <br /> w- <br /> wa <br /> 76 w NOMINAL CHAMBER SPECIFICATIONS w TOM <br /> INSPECTION & MAINTENANCE • F, w s SIZE(W X H X INSTALLED LENGTH) 34.0"X 16.0"X 85.4" (864 mm X 406 mm X 2169 mm) s w w PROJECT TEAM MEMBERS <br /> S CHAMBER STORAGE 14.7 CUBIC FEET (0.42 m') • o _ <br /> STEP 1) INSPECT ISOLATOR ROW FOR SEDIMENT o o MINIMUM INSTALLED STORAGE' 31.0 CUBIC FEET (0.88 kg) u o L- R_S <br /> a - WEIGHT 35.0 Ibs. {16.8 kg) 3 -it o CHECK <br /> A. INSPECTION PORTS(IF PRESENT) 481 � y° o y w <br /> CONCRETE COLLAR - 18"(450 mm)MIN WIDTH if A+ <br /> A.1. REMOVE/OPEN LID ON NYLOPLAST INLINE DRAIN h C` W ti DCN <br /> ° *ASSUMES 6"(152 mm)ABOVE,BELOW,AND BETWEEN CHAMBERS <br /> A.2. REMOVE AND CLEAN FLEXSTORM FILTER IF INSTALLED F. <br /> °° <br /> PAVEMENT CONCRETE COLLAR NOT REQUIRED 1 o m •a• $ o m <br /> A.3. USING A FLASHLIGHT AND STADIA ROD,MEASURE DEPTH OF SEDIMENT AND RECORD ON MAINTENANCE LOG _ zo< <br /> FOR UNPAVED APPLICATION E .. _- _, <br /> A.4. LOWER A CAMERA INTO ISOLATOR ROW FOR VISUAL INSPECTION OF SEDIMENT LEVELS(OPTIONAL) 8 a 8 L' m 4A.5. IF SEDIMENT IS AT,OR ABOVE,3"(80 mm)PROCEED TO STEP 2.IF NOT,PROCEED TO STEP 3. I 12"(300 mm)NYLOPLAST INLINE DRAIN o 6 1 A A b N N o <br /> B. ALL ISOLATOR ROWS BODY W/SOLID HINGED COVER OR GRATE 8 4 =w =w SEAL <br /> B.1. REMOVE COVER FROM STRUCTURE AT UPSTREAM END OF ISOLATOR ROW / ��� II PART#2712AG61P* & - a °� m q u <br /> B.2. USING A FLASHLIGHT,INSPECT DOWN THE ISOLATOR ROW THROUGH OUTLET PIPE a " 'S0< , l I SOLID COVER:1299CGC* g o o ° 5 0 <br /> i) MIRRORS ON POLES OR CAMERAS MAY BE USED TO AVOID A CONFINED SPACE ENTRY "sad"ant' GRATE:1299CGS 5 m 0 N I I m N <br /> ii) FOLLOW OSHA REGULATIONS FOR CONFINED SPACE ENTRY IF ENTERING MANHOLE 13 a 1WA /L o '8.3. IF SEDIMENT IS AT,OR ABOVE,3"(80 mm)PROCEED TO STEP 2.IF NOT,PROCEED TO STEP 3. CONCRETE SLAB ' oo UI II�IIMh_, o o,\S T Opp <br /> 8"(200 mm)MIN THICKNESS °a I °B <br /> STEP 2) CLEAN OUT ISOLATOR ROW USING THE JETVAC PROCESS AIIIIIIIIp °'o B C s 5 ��of �Asgf�� <br /> A. A FIXED CULVERT CLEANING NOZZLE WITH REAR FACING SPREAD OF 45"(1.1 m)OR MORE IS PREFERRED > K a pro a a " T `� <br /> FLEXSTORM CATCH IT J w a= PRE-FAB STUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH"B" o z g� OI- V <br /> B. APPLY MULTIPLE PASSES OF JETVAC UNTIL BACKFLUSH WATER IS CLEAN m m 6,-. PRE-FAB STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH"T" m °-w Lh <br /> PART#6212NYFX 6"(150 mm)SDR35 PIPE v <br /> C. VACUUM STRUCTURE SUMP AS REQUIRED Z a° z m ?' <br /> WITH USE OF OPEN GRATE �- <2 g w PRE CORED END CAPS END WITH"PC" <_ i �� ��r� O <br /> STEP 3) REPLACE ALL COVERS,GRATES,FILTERS,AND LIDS;RECORD OBSERVATIONS AND ACTIONS. �I +-IJ Ill- <br /> +w' �!�'I■!r 'ice+'Ii�'' SC-310 CHAMBER ?o z o PART# STUB A B C w°p Li."-) <br /> T 'omit I,I, • , , (. °w SC310EPEO6T/SC310EPEO6TPC 5.8"(147 mm) ___ < w � <br /> < °z 6"(150 mm) 9.6"(244 mm) ~< °z �' 3938 <br /> STEP 4) INSPECT AND CLEAN BASINS AND MANHOLES UPSTREAM OF THE STORMTECH SYSTEM. ' III IMF I�" o- w- , <br /> (150mm) gilt , I�� I'I ! I I� �i'I� - a z SC310EPE06B/SC310EPE06BPC 0.5"(13 min) ov_J °z �t� �'CI STER <br /> 6" INSERTA TEE I I I I v._ <br /> (O- mw (O- <yw 0 R y0 <br /> PART#6P26FBSTIP* v I °z SC310EPE08T/SC310EPE08TPC g"(200 mm) 11.9"(302 mm) 3.5"(89 mm) --- v I 's, 1 <br /> NOTES INSERTA TEE TO BE CENTERED <w SC31OEPE08B/SC31OEPEO86PC 0.6"(15 mm) • N S NAL G <br /> ON CORRUGATION CREST '0 k' ,,w SC310EPE1OT/SC310EPE1 OTPC 1.4"(36 mm) --- �e =, <br /> w <br /> *THE PART#2712AG6IPKIT CAN BE <br /> 5 a y 10"(250 mm) 12.7"(323 mm) g a N <br /> 1. INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF OPERATION.ADJUST THE INSPECTION INTERVAL BASED ON PREVIOUS USED TO ORDER ALL NECESSARY . v w w SC310EPE1OB/SC310EPE1OBPC --- 0.7"(18 mm) . w w 5/31/2019 <br /> OBSERVATIONS OF SEDIMENT ACCUMULATION AND HIGH WATER ELEVATIONS. COMPONENTS FORA SOLID LID W- i T,o f i° <br /> SC310EPE12B 12"(300 mm) 13.5"(343 mm) --- 0.9"(23 mm) m 5 <br /> INSPECTION PORT INSTALLATION z <br /> a <br /> ° ALL STUBS,EXCEPT FOR THE SC310EPE12B ARE PLACED AT BOTTOM OF END CAP SUCH THAT THE OUTSIDE DIAMETER OF <br /> 2. CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN INSPECTION SHOWS THAT MAINTENANCE IS NECESSARY. --- o <br /> o g m THE STUB IS FLUSH WITH THE BOTTOM OF THE END CAP.FOR ADDITIONAL INFORMATION CONTACT STORMTECH AT 3 m TITLE <br /> o z 1-888-892-2694. i o <br /> mg „ < �N STORM <br /> SC-310 6" (150 mm) INSPECTION PORT DETAIL - S *FOR THE SC310EPE12B THE 12"(300 mm)STUB LIES BELOW THE BOTTOM OF THE END CAP APPROXIMATELY 0.25"(6 mm). 5 <br /> BACKFILL MATERIAL SHOULD BE REMOVED FROM BELOW THE N-12 STUB SO THAT THE FITTING SITS LEVEL. DRAINAGE AND <br /> NTS SHEET SHEET <br /> 4 OF 5 NOTE:ALL DIMENSIONS ARE NOMINAL Civil Engineers <br /> btructural engineers LI T I L I T DETAILS <br /> S T O R M C H A M B E R DETAILSLandscape Architects <br /> Community Planners u <br /> 1 NOT TO SCALE Natural Resource Ecologists <br /> Land SurveyorsAEI 1111111 PROJECT NO. <br /> Neighbors 18.03-01 <br /> DATE <br /> A H B L 12/21/2018 <br /> PROJECT NETWORK PATH <br /> O o TACOMA • SEATTLE <br /> CVO SPOKANE • TRI - CITIES SHEET NUMBER <br /> 2215 North 30th Street, Suite 300 Tacoma, WA 98403 <br /> 253.383.2422 TEL 253.383.2572 FAX www.ahbl.com WEBC3 Know what's below. ■ <br /> Call before you dig. NOT FOR CONSTRUCTION PERMIT SET <br /> DATE: May 30, 2019 FILENAME: Q:12018\2180406\10_CIV\CAD\2180406-SH-STRM.dwg COPYRIGHT©2018 shoesmith cox architects <br />