Laserfiche WebLink
Q <br /> Li_ <br /> FOR PLAN OF PLUMBING (F:3 _ _ wWITHIN THIS AREA LG \ D Q <br /> 10 -0 SEE DETAIL UGM120-140-022-4001 -M137.TIF L_Li <br /> r•- <br /> �� 8 -0 �\ POINT OF CONNECTION <br /> 1 1 . 5 2 . 5 O (E) = EXISTING <br /> �� w <br /> 4'_4' 1 . 5 8'-p" �`J' ID = INDIRECT DRAIN Q <br /> 4 S _ rY <br /> UP TO 10 <br /> 8" CLD FCO 8" CLD o co <br /> 1 UP TO FCO MATCH LINE - FOR CONTINUATION SEE SHT UGM120 UP TO FCO-1 • <br /> b • <br /> t -/ 4" 8" CLD <br /> 6" A R CONNECT A I 1 /t • , 8„ UP TO <br /> TO PLANT AIR -�_ � '" CLD FCO Q � <br /> SEE DWG Y204 3" SOIL STACK A P TO FCO 4" SOIL STACK 6" 3" WASTE STACK ELEVATOR PIT w <br /> c_ ELEV 97'-2" FROM ABOVE FROM ABOVE FROM ABOVE °- <br /> co <br /> I - O <br /> I D LLI <br /> ' G =\ - SAL \ OTES <br /> 4" SANITARY DRA N - ° f <br /> ' ' /p i .1 12'-0" 8'-0" "' cn <br /> 6" SANITARY DRAIN _ Lw <br /> 8" CW CONNECT o "' <br /> TO WATER MAIN 6" AIR 8" Q o <br /> • SEE DWG Y404 A <br /> C ELEV 97 -3 _ z <br /> L n` A A - A A A A A A -A A 11 J A o+ —q t o <br /> 2 -4 r-q i_1 �a 1_1 q n1 - K�+- - — ni. 1 / <br /> i O <br /> i i <br /> Q 10" AIR o 10" AIR 8" tl <br /> 6" AIR <br /> 4'-4' �, Q 8 g \ " CW (FLIGHT LINE) c) I <br /> 4" CW Q z <br /> 1 (N AIR FILTER ci SP 315 = UGM125 140-022-4004-M502.TIF <br /> _._1SP 16 EQ. #CAF-01 c.) 2" AIR < <br /> CD <br /> s"A s"A 8" SD 8" 8" SD 8" SD, UP 1 1 2" PUMP DISCHARGE <br /> '""" UP TO _ UP TO TO FCO <br /> �',;,,, ., T Pp , o+ l sew s�wCO 1 1 S�1 SIW 3 1 D Oi.,•., nl Pp_ - PD SAN ' ..... 11A <br /> '` UP TO FCO <br /> 7i 8„ CLD RISER �_' UGM125 140-022-4004—M503.TIF <br /> 2" PUMP DISCHARGE .• <br /> .,. N , J -2 <br /> D <br /> MATCH LINE - FOR CONTINUATION SEE SHT UGM110 BLDG 40-22 2" AIR UP <br /> 40-021-UCM125 40-021-M515 \ 3" WASTE <br /> ABOVE 4" <br /> CONTINUES ON CO \ STR „ C 0 \ \ OT-S <br /> a0-022-UGM110 <br /> 3 PART AL \ DERG �OL \ D PLJvB \ G ALA\ �� "‘ <br /> PROVIDE NEW INDIRECT DRAIN PIPING (SLOPED AT 1/8" <br /> UGM125 140-022-4001 -M 140.TIF SCALE: 1/8"=1 '-0" \\\, 4 PER FOOT) FROM USER CONNECTION POINT TO DRAIN <br /> CONNECTION IN PEDESTRIAN TUNNEL. FIELD VERIFY <br /> POINT OF CONNECTION IN PEDESTRIAN TUNNEL. <br /> R -F-RE \ CE vAG = <br /> tw I:\TIFF\MECH\40—BLDGS\40-022\140-022-4001 —M109.TIF <br /> 1 3 5 7 O9 11 <br /> ® 2 04 O6 O 10 <br /> UGM110 ! UGM111 I UGM112 ! UGM113 ! UGM114 00 <br /> UGM115 i UGM116 i UGM117 UGM118 ' UGM119 <br /> UGM120 i UGM121 ! UGM122 UGM123 UGM124 <br /> GM12/1 UGM126 i UGM127 I UGM128 i UGM129 00 <br /> KEY PLAN BLDG, 40-21 ifti <br /> SCALE; NONE '•.,,/ <br /> 8' 4' 0 4' 8' 16' <br /> SCALE: 1/8"=1 '-0" <br /> 1111 <br /> www.brph.com Copyright©2019 <br /> Architects Engineers, Inc. <br /> PROFESSIONAL STAMP & SIGNATURE 19020 33rd Ave W,Suite 530 StateCeicafef Washington <br /> APPLIES TO WORK WITHIN THE CLOUDED Lynnwood,Washington,98036 Architects of No.60323551202ation <br /> 425-921-3500 Architecture <br /> REVISION AREAS ONLY AS INDICATED Engineering No.3137 <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE <br /> A ISSUE FOR PERMIT - 767 RATE INCREASE FA DCS KMB 09/17/19 ��of WA M.-& THIS CDESGN ACCEPTABILITY <br /> R CHECKED CS 09/17/19 PA TI A L U \ D E G O U \ D P LU v B I \G P LA\ — A 09/17/2019 <br /> OM.B <br /> — ® <br /> e �� ��� � SPECIFICATION IS APPROVED DNGINEER CS 09/17/19 _ SHEET <br /> TITLE 767 RATE INCREASE - FA- �0AF,AW 64,�' , APPROVED BY DEPT. DATE KMB 09/17/19 <br /> �i1�;, CHECKED C V 1 2 5 <br /> °��� 21597�:� A`. APPROVED - B L L 3 I \ G 1 0 — 21 EVE-18-30055-602 <br /> JOB NO. COMP NO. <br /> 0 }i \''''' APPROVED DWG NO. <br /> MECHANICAL MASTER COL C-D/1 -3 EVERETT, WA 40-021 -UGM125-602 <br />