My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD 2019 BLDG 40-22 Plans 2022-11-30
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-22
>
Plans
>
3003 W CASINO RD 2019 BLDG 40-22 Plans 2022-11-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 3:00:33 PM
Creation date
7/22/2021 1:02:57 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-22
Permit
B1910-007
Year
2019
Notes
New Trenches To Support (2) New 767 Final Assembly Positions
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Q <br /> Li_ <br /> L-G -\ 3 W <br /> 1 (./-) <br /> Q <br /> 1 "A (UP) SEE MECHANICAL DRAWING III <br /> 40-021 —TNM1 1 1 —25 a POINT OF CONNECTION (P.O.C) n' <br /> 1 "A FOR CONTINUATION j <br /> V hi <br /> I— . <br /> <C <br /> 1-2 <br /> I` <br /> (0 <br /> f---- <br /> LEI I— <br /> z <br /> D — — — c <br /> TNM111 140-022-4004-M524 � Q <br /> G \ SAL \ OTS <br /> rY <br /> O <br /> 1 i" AIR LINE, DOWN THRU /4 Li__ <br /> FLOOR CONNECTED INTO W <br /> 6" AIR IN TRENCH TO > <br /> SERVE TOOL 2FME111U0000 - C� <br /> TNM111 140-022-400i (r) <br /> 6"LPA (UP) 0� <br /> AIR OPERATED 6" LPA 1 "A (UP) / i . <br /> CONTROL VALVE \ 11 N <br /> ri----- <br /> z <br /> I- <br /> 3"q 4"A I »► 1 I.oi 1 ; 1,01 I <br /> cN <br /> CN <br /> Ai1 4 0 <br /> ri <br /> Pr 1111 <br /> 0 <br /> TNM111 140-022-4004-M526 I R -F-R -\ C - DRAW' \ G S <br /> w <br /> U <br /> H <br /> < <br /> 6" LPA----\ <br /> 1 "A C <br /> 1 "A (UP) <br /> 1 CO \ STR ,iCTO \ \ OILS <br /> 1 "A (UP) _ 2-1/2"A P) P- PROVIDE NEW COMPRESSED AIR PIPING TO ACCESS <br /> z POINTS UNDER UTILITY HATCHES INDICATED. <br /> CONTRACTOR TO FIELD COORDINATE POINT OF <br /> = CONNECTION BETWEEN NEW PIPING AND EXISTING <br /> u- PIPING. PROVIDE SHUT OFF VALVE AT ALL NEW <br /> `= Q 0o csa CONNECTION POINTS. <br /> © PROVIDE NEW LOW PRESSURE AIR PIPING. PROVIDE <br /> NEW CONTROL VALVE AT EACH ACCESS POINT. <br /> / PIPING IS EXISTING. <br /> C <br /> 1 "A (UP) <br /> c 0 0 0 D 11 <br /> I <br /> • 2000100 <br /> 0 <br /> TNM111 140-022-4004-M52. j0 4 11 12 13 14 <br /> 15 16 17 18 19 <br /> 1 "A (UP) 20 21 22 23 24 ()am <br /> KEY PLAN BLDG. 40-022 ■; <br /> SCALE: NONE <br /> 8' 4' 0 4' 8' 16' <br /> Q <br /> SCALE: 1/8"=1'—0" <br /> lo <br /> 1 "A (UP) <br /> MATCH LINE — DWG 40-022—TNM111 -15 <br /> E = <br /> DART AL C O V DR -S S -D A R 9 LA\ - T j \ \ -L ,- \N• www.brph.com Copyright©2019 <br /> \ \\\\\\, <br /> SCALE: 1/8"=1 '-0" \ �`\ Architects Engineers, Inc, <br /> 19020 33rd Ave W,Suite 530 State of Washington <br /> Certificate of Authorization <br /> PROFESSIONAL STAMP & SIGNATURE Lynnwood,Washington,98036 <br /> Y 9 Architecture No.603235512 <br /> APPLIES TO WORK WITHIN THE CLOUDED 425-921-3500 <br /> Engineering No.3137 <br /> REVISION AREAS ONLY AS INDICATED <br /> DRAWN DATE SUBTITLE CURRENT REVISION — SYMBOL A DATE 09/17/2019 <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ACCEPTABILITY DCS 09/17/19 <br /> ���I `I Q THIS DESIGN AND/OR CHECKED PARTIAL COMPRESSED AIR PLAN _ TUNNEL <br /> A ISSUE FOR PERMIT — 767 RATE INCREASE FA DCS KMB 09/17/19 ��- �y a"fl�''�c DCS 09/17/19 SHEET <br /> fr - enne �F`�. t � SPECIFICATION IS APPROVED ENGINEER TITLE <br /> w` ® z.� APPROVED BY DEPT. DATE KMB 09/17/19 767 RATE INCREASE — FATNmi 1 1 . 10 . <br /> ` .. CHECKED <br /> /t: <br /> JOB N0. <br /> 9p2 ,,F.21F197 . APPROVED BUILDING 0-022 EVE-18-30055-602 COMP NO. <br /> SSIo\T ztic APPROVED DWG N0. <br /> MECHANICAL MASTER COL. D—Df/1 -3 EVERETT, WA 40-022—TNM111 -10-602 <br />
The URL can be used to link to this page
Your browser does not support the video tag.