My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD 2019 BLDG 40-22 Plans 2022-11-30
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-22
>
Plans
>
3003 W CASINO RD 2019 BLDG 40-22 Plans 2022-11-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 3:00:33 PM
Creation date
7/22/2021 1:02:57 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-22
Permit
B1910-007
Year
2019
Notes
New Trenches To Support (2) New 767 Final Assembly Positions
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 S I—A\T 1 0 C _\TRAL YD RA E C Q <br /> V S <br /> LEG -- <br /> D I1; <br /> V-5, F-8 (2), F-8A (2) II <br /> LOCATED AT BLDG 40-022 LOCATED AT BLDG 40-023 6" HR (E) FROM BLG. (Y <br /> V-4 COLUMN E-3.5 COLUMN G-6 40-23. CD <br /> ICFI BALL VALVE <br /> I s R [ I DUMP VALVE w <br /> F-1 I I-- <br /> 1 I I(P I 5 3"HS (E) <br /> I�I 2 CONSOLE II FLANGE/GRAYLOC HUB CONNECTION Q <br /> I p I 1 NO. 1 HPU SKID (E) (E) <br /> 6"HR (E) <br /> ICICC) <br /> 4 I l kfl I -1 REDUCER <br /> I1I 3 (E) <br /> E (E) <br /> H QUICK DISCONNECT FITTING <br /> „ -V-1, F-12 (2) <br /> Ixc! BUTTERFLY VALVE <br /> (4 TYPICAL) <br /> ® SWIVEL JOINT 1Y <br /> d- N N N N a_ <br /> I y <br /> 0 <br /> Li_ <br /> LiU <br /> (Cl) <br /> 4 G - \ -RAL \ OT-S <br /> ,�1 �` V-5, F-8 (2), F-8A (2) , } <br /> 7- 4"HS I T 4"HS <br /> REFER TO c y r <br /> I <br /> 40-022-M326 FOR <br /> CONTINUATION OF 6"HR (E) 6"HR (E) liW 1 1/2" HYDRAULIC SUPPLY HOSE AND QD <br /> PIPING I _L CONNECTIONS PROVIDED BY BOEING. <br /> 1 V-2� © 2" HYDRAULIC RETURN HOSE AND QD <br /> CONNECTIONS PROVIDED BY BOEING. <br /> ,. cx v) v) v) v) E. 1 1/2„ <br /> _ _ _ _ ?- CAPPED VULCAN SST DRAIN BALL VALVE <br /> viol`J WITH 1 1/2" SPECIAL GRAYLOC HUBS BORED <br /> FOR VALVE AND SCH. 80 PIPE. PROVIDE <br /> 1 1/2" GRAYLOC BLIND. <br /> 4" TEE FOR FUTURE CONNECTION TO BUILDING <br /> BODY RETURN V 40-023 WAS ADDED LATE IN CONSTRUCTION. <br /> BODY RETURN WH HYDRAULIC PERFORMANCE CALCULATIONS DO <br /> NOT INCLUDE FLOW CONDITIONS FOR THIS FUTURE <br /> BRANCH. <br /> F-5 F-6 F-7 2"HR �Q� 2"HR F-7 F-6 F-5 THE TEE AND THE FUTURE BRANCH CONNECTION <br /> [ I I I 3 HR 3 HR I t I^D ® [ WERE INCLUDED IN THE PIPE STRESS CALCULATIONS. <br /> V-3a V-3b <br /> ©' <br /> CO \ STRLCTO \ \ OYES <br /> BUILDING SUPPLY AND RETURN PIPING TO CONSOLE NO. 2 HAS BEEN <br /> cc RELOCATED TO 40-022-M326. <br /> _ _ <br /> CONTROL <br /> VALVE <br /> SYSTEM NO. 2 SYSTEM NO. 3 PLANT100PSIG AIR PP <br /> a NO <br /> OW PRESSURE SWITCH I <br /> SET FOR 35 PSIG <br /> F-2 F-3 F-4 1 1/2"HS 2"HS 2"HS 1 1/2"HS F-4 F-3 F-2 - <br /> [ / M ] SEE M319 NC <br /> CALIBRATION PORT H SPRING RETURN <br /> [5 F-6 F-7 2"HR 1111 I 3"HR 3"HR IAk I- 2»H [F-7 6 F-5] 1/4" <br /> PNEUMATIC <br /> `&1/4" ACTUATOR <br /> y V-3c V-3d <br /> RETURN a. RETURN LINE <br /> 2 2 LINE INLET 0.4 <br /> NO OUTLET TO 6" RETURN <br /> (QD SIDE) 3" DUMP <br /> allk (TYP) BALL VALVE <br /> M310 <br /> —YDRAJLIC R -TJRN LI \ E DJ VALVE ASS - VBLY rm <br /> SCALE: NONE UGM110, UGM115 M310 <br /> SYSTEM NO. 1 SYSTEM NO. 4 <br /> 1 1 <br /> F[2 F-3 � oil1 1/2"HS 2"HS 2"HS 1 1/2"HS F-4� F-} /\✓[] <br /> F-6 F-7 2"HR[5 2"HR F[6 F-,IIi iI 3HR I i —� a <br /> V-3e V-3f <br /> t'*gin , .,:, .v. - r,,, ,"-'."'r�ra <br /> 2 2 ; � <br /> F.y :' t� 3 "i . tl"v <br /> ; s,ax.x <br /> www.brph.com Copyright()2019 <br /> Architects Engineers, Inc. <br /> PROFESSIONAL STAMP & SIGNATURE State of Washington <br /> 33rd <br /> Ave <br /> W,Suite 530 <br /> APPLIES TO WORK WITHIN THE CLOUDED 19020Certificate of Authorization <br /> REVISION AREAS ONLY AS INDICATED <br /> Lynnwood,Washington,98036 Architecture No.603235512 <br /> 425E921-3500 Engineering No.3137 <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE <br /> �I VI. <br /> ACCEPTABILITY DCS 09/17/19 HYDRAULIC FLOW DIAGRAM - A 09/17/2019 <br /> A ISSUE FOR PERMIT - 767 RATE INCREASE_ FA DCS KMB 09/17/19 Iii:;31: :::::. <br /> ",-,,am. ,,„*.. <br /> o ',1 . THIS DESIGN AND/OR C EKED09 17 19 SHEET <br /> M310 <br /> h lSPECIFICATION IS APPROVED / /' e� �TENGINEER TITLE 767 RATE INCREASE — FA <br /> `?„ . APPROVED BY DEPT. DATE KMB 09/17/19 <br /> 1 . CHECKED <br /> �?� JOB NO. COMP NO. <br /> `''o, 2Fri189r�Fp .-5' APPROVED BUILDING 40®0 <br /> EVE-18-30055-602 <br /> l! C` <br /> SIO�aL E' APPROVED DWG NO. <br /> MECHANICAL MASTER EVERETT, WA 40-022—M310-602 <br />
The URL can be used to link to this page
Your browser does not support the video tag.