Laserfiche WebLink
\.., ,, r.-:- ,,, -,-,-L. , <br /> - IF THESE SHEETS ARE NOT 24"X 36"THEN DRAWING IS NOT TO SCALE. <br /> 0 <br /> 12" R.O. <br /> [-I-1 -... <br /> , 1 - , <br /> 12" 3B 12" _ (------, _,,.„,,,_ <br /> '�.. GENERAL NOTES (WINDOW PLACEMENT) ----1,_ <br /> - 1. SHEATHING AND FRAMING MATERIALS TO BE DRY BEFORE INSTALLING FLASHING MATERIALS I <br /> 2. ALL INSTALLATIONS REQUIRE MOCK UP REVIEWS PRIOR TO INSTALLATION. II <br /> 3. ALTERNATE INSTALLATION METHODS REQUIRE MOCK-UP REVIEW AND WRITTEN APPROVALS <br /> FOLD CUT PRIOR TO INSTALLATION. <br /> 4. ALL MATERIALS AND FASTENERS USED FOR INSTALL MUST BE SUBMITTED TO ARCHITECT FOR <br /> 3A APPROVAL BEFORE PROCEEDING WITH REPAIR. <br /> 1( <br /> 5. NEW SELF ADHERED FLASHING (SAM) SHALL BE BUTYL BASED MATERIAL OR AS SPEC'D. <br /> 6. SAM SHALL BE ADHERED OVER PRIMER AND PRESSED TIGHT WITH J-ROLLER. <br /> 7. WEATHER RESISTANT BARRIER MATERIAL AND INSTALLATION SHALL BE AS WRITTEN IN <br /> SPECIFICATIONS. <br /> 8. SEALANTS SHALL BE AS REFERENCE IN SPECIFICATIONS AND APPROVED IN MOCK-UPS. <br /> TAPE INSIDE CORNER OF <br /> WRB WRAP AS PER 3B INSTALL WRB STRIP AT 9. REFER TO WINDOW HEAD JAMB AND SILL DETAILS FOR ACTUAL AND PARTICULAR CONDITIONS. <br /> APPROVED MOCK UP HEAD AND WRAP INTO ROUGH THIS NUMBERED SEQUENCE IS INTENDED ONLY TO ILLUSTRATE THE CONCEPT AND THE <br /> COMMON STEPS FOR FLASHING OF OPENINGS AND DOORS AND WINDOWS. <br /> p <br /> APPLY BEAD OF SEALANT INSTALLATION OPENING w <br /> PRIOR TO SETTING JAMB AND 10. HEADER SHOWN IS SCHEMATIC. SEE WINDOW INSULATED HEADER DETAILS FOR REQUIRED a <br /> HEAD PRE-STRIPS INSULATED HEADER CONSTRUCTION. 1 <br /> 3A INSTALL WRB STRIP �,; �I � 2 z <br /> AT JAMBS. LAP OVER =g _ <br /> WALL SHEATHING �, �' ~ <br /> SAM BELOW AT CORNER, '' Y. rrr W <br /> SUBSTRATE INSURE SAM IS FOLDED AT WRAP INTO ROUGH R. E - <br /> OPENING. r,,II � �1�kk U C� <br /> CORNER, NOT CUT ,�i� .. 0 0}. <br /> INSTALL JAMB HEAD '...R.. ° U <br /> PRE-STRIPS OVER Try `"` <br /> r <br /> INSTALL FLEXIBLE S.A.M. lii1 <br /> 9"MIN. Z OVER SEALANT EMBEDMENT. fi r o <br /> STRAIGHT FLASH AND UP TAPE ALL OVERLAPS o ``' `" <br /> METAL BACK ANGLE co <br /> .�.���. FOR AIR-BARRIER S' ' i "� <br /> 1C PROVIDE 3/4"x 3/4"24 :♦�. # A` DESIGN Ti <br /> INSTALL A SAM STRIP AT THE <br /> GAUGE SILL BACK * STRAIGHT FLASH AT SILL PAN r SILL TO JAMB CORNER TO <br /> .� ANGLE (L FACING IN �� � v� WHERE SILL PNA IS INDICATED <br /> j OR OUT} �� �d ��' ON SILL DETAILS. EXTEND UP JAMB PRE STRIPS TO p , PREVENT PIN HOLES. _ _ <br /> °r° � '1� � Ow'�fp- ��� BACK ANGLE. WRAP OVER CORNER ,� �e. SEE DETAIL THIS SHEET � - :AWN <br /> 1 __� ' ���� �����`�, SILL FLASHING 6" MIN. ...�, • � . <br /> r�rEXISTING SILL. ` �� � �, ,�'� (TOP & BOTTOM) 6:�.:: `• ,r, .. � 11111'1 40 <br /> 1�� / \ BY: LJ <br /> ■r�rrr ! • _._ <br /> ATTACH W/STAPLES Min -- - ,��� �J��• <br /> % ��� % \ CHECK: LJ <br /> d <br /> AS REQUIRED BY -� i�.� ,� � �O!���� I � � 114111114‘ <br /> �� , <br /> VARIOUS BUILDING = h /\ NOTES: <br /> TYPES <br /> z v \ <br /> M \\ v BUTTERFLYSTRIP PLOT DATE: 7iaazo17 1:05:05 PM <br /> 1A INSTALL WRB Pf�E \ °' 92j/N \ / (ALTERNATE) JOB NO: <br /> FLASH SILL ` \ ' <br /> DO NOT ATTACH LOWER 6" <br /> EDGE @ THIS STEP 8 �/N 5215 <br /> DETAIL: <br /> SAM STRIP AT CORNER ONIMINUIVII 1 <br /> .., <br /> FLANGED WINDOW INSTALLATION STEP 1 0 FLANGED WINDOW INSTALLATION STEP 2 <br /> 0 FLANGED WINDOW INSTALLATION STEP 3 ALTERNATE: "`'`' <br /> 40 PROVIDE BUTTERFLY STRIP <br /> AT INSIDE CORNERS <br /> N.T.S. (16) N.T.S. (16) <br /> N.T.S. (16) <br /> Jensen Fey <br /> Architecture and Planning WINDOW INSTALL FOR <br /> FLANGED WINDOW ONLY 7730 LEARY WAY NE <br /> REDMOND, WA 98052 <br /> TEL:425.216.0320 FAX:425.216.0329 <br /> WINDOW INSTALL FOR PROVIDE TAPE OVER TOP <br /> FLANGED WINDOW ONLY OF HEAD PRE STRIP TO <br /> PREVENT RAIN FROM I'— <br /> SECURE WINDOW AS ENTERING HEAD DURING W <br /> I PER WINDOW INSTALLATION PROCESS. (O <br /> � MANUFACTURER'S <br /> RECOMMENDATIONS. I- <br /> (TYPICALLY EVERY <br /> OTHER NAIL FLANGE <br /> HOLE AROUND ALL APPLY BUTYL SAM OVER 00 <br /> INSTALL CONTINUOUS BEAD OF SEALANT SIDES OF WINDOWS.) FLANGES: CD kij0 <br /> OVER BACK ANGLE STOP-BEFORE INSTALL FASTENERS NO FIRST TO JAMB FLANGES <br /> INSTALLING WINDOW(THICK COATING) CLOSER THAN 3"TO NOR C\I Li- <br /> 5B INSTALL WINDOW UNIT MORE THAN 10"TO THEN SECOND APPLY <br /> CORNERS BUTYL SAM AT HEAD Z <br /> \\` APPLY SEALANT TO `� FLANGES (OVER JAMB SAM). <br /> \ INSTALL PVC SHIMS AT SILL TO ALLOW HEAD AND JAMB 1 "` Q <br /> ., DRAINAGE PATH UNDER WINDOW SILL AND FLANGES PRIOR TO / ,-- i DO NOT APPLY SAM OVER <br /> 1144.4fik LEVEL WINDOW. CONFIRM WITH WINDOW INSTALLATION r <br /> SILL FLANGE. ROLL TO <br /> MANUFACTURER FOR SUPPORT I I ACTIVATE ADHESIVE <br /> :::::0 4441 REQUIREMENTSW <br /> %iiiiik - <br /> I `' �, r P� <br /> APPLY CONT. AIR SEAL(SEALANT J �J 3 I 1 AND BACKER ROD) BETWEENLU <br /> / �9 i i \ WINDOW FRAME AND HEAD, JAMB Q <br /> ' •`►, �/ti 5A INSTALL 1/4: THICK X AND SILL FLASHING. <br /> ' � 1"WIDE CONT. W <br /> �[J 011041 ,,niit,:::4.4.....,.:,:.>i,.,„..1..,E.:.m.,!.:.:,, <br /> 1 i SHIMS AT HEAD AND AT INTERIOR <br /> JAMBS TOOL SEALANT BEAD @ W <br /> .i BACK ANGLE <br /> I 1 \ INTERIOR ALTERNATES: I— �■') Z <br /> ' / IF NO BACK ANGLES, L,d._ 1 <br /> � INSTALL CO <br /> INSERT1/4" PVC �/ f I / <br /> CONTINUOUS <br /> HORSHOE SHIMS OR AS All BACKER ROD & N —J <br /> REQ'D FOR LEVEL AND SEALANT @JAMBS LI® <br /> SILL PLUnFBANGE TO BEHIND / /, AND HEAD) f <br /> ALLOW FOR DRAINAGE. IF NO WRAPS, r <br /> INSTALL NEW GYP W v- Z <br /> AND/OR WOOD <br /> READY FOR WINDOW INSTALL 5B INSERT 1/4" PVC WINDOW WRAPS TO > L W <br /> HORSHOE SHIMS OR AS MATCH EXISTING — ®-- <br /> REQ'D FOR LEVEL AND r <br /> ENLARGED WINDOW SILL PLUMB INSTALL, BEHIND <br /> SILL FLANGE TO <br /> ALLOW FOR DRAINAGE. <br /> 4 FLANGED WINDOW INSTALLATION STEP 4 C FLANGED WINDOW INSTALLATION STEP 5 6 FLANGED WINDOW INSTALLATION STEP 6 -h, <br /> FF <br /> _ <br /> N.T.S. (16) N.T.S. (16) N.T.S. (16) <br /> AA 0 _ 3 <br /> • <br />