Laserfiche WebLink
CITY OF EVERETT <br /> FINAL CONTRACT VOUCHER CERTIFICATION <br /> CONTRACTOR: Road Construction Northwest,Inc. ADDRE'S: PO Box 2228 <br /> CITY: Renton STATE: WA 98056 DATE: November 30,2020 <br /> PROJECT TITLE:Watermain Replacement"U"Project <br /> WORK ORDER NO. UP 3698 DATE WORK COMPLETE: October 9, 2020 FINAL AMOUNT: $1,743,008.51 (includes WSST) <br /> CONTRACTOR'S CERTIFICATION <br /> I, the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work <br /> performed and material furnished to the City of Everett,that the same or any part thereof has not been paid, <br /> and that I am authorized to sign for the claimant; that I have not rented or purchased any equipment or <br /> materials from any employee of the City; I further certify that the attached final estimate is a true and correct <br /> statement showing all the monies due me from the City of Everett under this contract; that I have carefully <br /> examined said final estimate and understand the same and that I hereby release the City of Everett from any <br /> and all claims of whatsoever nature which I may have, arising out of the performance of said contract,which <br /> are t se*for h in c '_estimate. <br /> x <br /> C is <br /> N C� TITLE rC,o p3 31 ?F+�•y�� <br /> R d stru ion Northwest, Inc. _ NOTq <br /> 9}. m: <br /> Subscribed and sworn to before ="'•I �eL IC <br /> me this?. day of ('A-Q '.�F�'•sm �9h '�� <br /> X Notary Public �,.�0_;� �humbetG�o\��` <br /> in and for the State of ashington,residing at ; 44i H\N*‘‘\` <br /> PUBLIC WORKS DEPARTMENT CERTIFICATION <br /> I Certify the attached final APPROVED Date: "-l- z-t <br /> estimate to be based upon actual <br /> measurements and to be true and correct. <br /> X L �� � X <br /> Construction Manager rPublic Works Director <br /> Tom Fuchs Ryan Sass <br /> INSTRUCTIONS <br /> The Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all <br /> subcontractor's agents and forwarded with the Final Contract Voucher Certification. <br /> Contractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a <br /> 9 claim attached. <br /> Revised 9/94 <br />