Run Date: 11/10/2020 City of Everett-Public Works Department Cutoff Date: 11/6/2020
<br /> Time: 9:44 AM Contract Estimate Voucher
<br /> Project: 374 For Work Order#3698 Contractor: ROAD CONSTRUCTION NW
<br /> WATERMAIN REPLACEMENT"U" Estimate#10 PO BOX 2228
<br /> WO 3698 BID:$1,743,019.55 RENTON,WA 98056
<br /> TOTAL BID:$1,743,019.55
<br /> Unit Plan Total Previous Present Total Previous Present
<br /> item# Description Units Price Quantity Quantity Quantity Quantity Amount Amount Amount
<br /> 0001 MOBILIZATION LS 121,000.00 1.00 1.0000 1.0000 0.0000 121,000.00 121,000.00 0.00
<br /> 0002 SURVEYING LS 13,000.00 1.00 1.0000 1.0000 0.0000 13,000.00 13,000.00 0.00
<br /> 0003 SPCC PLAN LS 1,400.00 1.00 1.0000 1.0000 0.0000 1,400.00 1,400.00 0.00
<br /> 0004 FORCE ACCOUNT FA 1.00 60,000.00 97,232.0500 53,656.6500 43,575.4000 97,232.05 53,656.65 43,575.40
<br /> 0005 TRAFFIC CONTROL LABOR HR 55.00 1,000.00 1,962.0000 1,962.0000 0.0000 107,910.00 107,910.00 0.00
<br /> 0006 MAINTENANCE&PROTECTION OF LS 12,500.00 1.00 1.0000 1.0000 0.0000 12,500.00 12,500.00 0.00
<br /> TRAFFIC CONTROL
<br /> 0007 TRENCH EXCAVATION SAFETY SYSTEMS LS 5,500.00 1.00 1.0000 1.0000 0.0000 5,500.00 5,500.00 0.00
<br /> 0008 STREET CLEANING&SWEEPING HR 160.00 100.00 22.5000 22.5000 0.0000 3,600.00 3,600.00 0.00
<br /> 0009 EROSION/WATER POLLUTION CONTROL FA 1.00 3,000.00 3,546.9800 2,250.5300 1,296.4500 3,546.98 2,250.53 1,296.45
<br /> 0010 FOUNDATION MATERIAL,CLASS A OR B TN 27.00 270.00 0.0000 0.0000 0.0000 0.00 0.00 0.00
<br /> 0011 GRAVEL BORROW TN 14.00 2,730.00 3,746.5800 3,746.5800 0.0000 52,452.12 52,452.12 0.00
<br /> 0012 DUCTILE IRON PIPE FOR WATER MAIN,4" LF 71.00 60.00 13.0000 13.0000 0.0000 923.00 923.00 0.00
<br /> 0013 DUCTILE IRON PIPE FOR WATER MAIN,6" LF 72.00 160.00 102.0000 102.0000 0.0000 7,344.00 7,344.00 0.00
<br /> 0014 DUCTILE IRON PIPE FOR HYDRANT LEAD, LF 72.00 250.00 232.0000 232.0000 0.0000 16,704.00 16,704.00 0.00
<br /> 6"
<br /> 0015 DUCTILE IRON PIPE FOR WATER MAIN,8" LF 76.00 3,180.00 3,227.5000 3,227.5000 0.0000 245,290.00 245,290.00 0.00
<br /> 0016 DUCTILE IRON PIPE FOR WATER MAIN,12" LF 99.00 2,620.00 2,740.5000 2,740.5000 0.0000 271,309.50 271,309.50 0.00
<br /> 0017 GATE VALVE,6" EA 1,000.00 13.00 14.0000 14.0000 0.0000 14,000.00 14,000.00 0.00
<br /> 0018 GATE VALVE,8" EA 1,325.00 22.00 24.0000 24.0000 0.0000 31,800.00 31,800.00 0.00
<br /> 0019 GATE VALVE,12" EA 2,175.00 15.00 15.0000 15.0000 0.0000 32,625.00 32,625.00 0.00
<br /> 0020 FIRE HYDRANT EA 3,750.00 13.00 13.0000 13.0000 0.0000 48,750.00 48,750.00 0.00
<br /> 0021 SALVAGE EX FIRE HYDRANT EA 700.00 3.00 5.0000 5.0000 0.0000 3,500.00 3,500.00 0.00
<br /> 0022 RELOCATE EXISTING FIRE HYDRANT EA 2,400.00 3.00 0.0000 0.0000 0.0000 0.00 0.00 0.00
<br /> 0023 REMOVE EX FIRE HYDRANT EA 525.00 10.00 3.0000 3.0000 0.0000 1,575.00 1,575.00 0.00
<br /> 0024 AIR VACUUM VALVE ASSY,1" EA 2,300.00 1.00 1.0000 1.0000 0.0000 2,300.00 2,300.00 0.00
<br /> 0025 AIR VACUUM VALVE ASSY,2" EA 4,000.00 1.00 1.0000 1.0000 .0.0000 4,000.00 4,000.00 0.00
<br />
|