_ . .
<br /> , : `
<br /> ' , , o0
<br /> c.� �
<br /> , � �
<br /> � � � ¢
<br /> , _ EO/ERETT TEIVIPORARY ERO$ION AND SED111/�ENI" CO�ITROL IVOTES: o �
<br /> � � �
<br /> 1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE AN A�PROVAL OF PERMANENT ROAD m o
<br /> : OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, RET�NTION FACILITIES, UTILITIES). � o
<br /> ' � 2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION; MAINTENANCE, REPLACEM�NT,AND UPGRADING OF M r
<br /> � �
<br /> THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT/GONTRACTOR UNTIL ALL CONSYRUCTION IS COMPLETED AND r' �
<br />. . . . . . . . . . . . . . . . . . . � . . . . . . . . ��. . . � � N � �
<br /> .. .. � . � . � . � � . � .. . . . . .. . .. . . . . . . . . . . . . . . .. � . . . � . . � . . .. . . '�. � . . � . . . '' . . . . . . . . � . � . .. . . � W .
<br /> _ A P
<br /> _ �
<br /> P ROVED ANb VEGETATION/LANDSCAPING IS ESTABLISHED. M �
<br /> _ : 3. THE BOUNDARIES OF THE CLEARING LIMlTS SHOWN ON THIS PLAN LL 'i _ � >
<br /> SHA BE CLEA4�LY FLAGGED IN THE FIELD PRIOR TO Q
<br /> CONSTRUCTION, DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS SHALL BE � �
<br /> PERMITTED. THE FLAGGING SHAL.L BE MAINTAINED BY THE APPLICANI'/CONTRACTOR FOR THE DURATION OF CONSTRUCTION. � ¢
<br /> ; 4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL CL�ARING AND GRADING "' �
<br /> � �
<br /> v I— N
<br /> • ' ACTIVITIES, AND jN SUCH A MANNER AS TO ENSURE THAT SEDIMENT AND SEDIMENT LADEN WATEF� DO NOT ENTER THE DRAINAGE
<br /> SYSTEM, ROADWAYS, OR VIOLATE APPLICABLE WATER QUALITY STANDARDS. ',
<br /> s�,�
<br /> , 5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED S�T� CONDITIONS. DURING THE
<br /> , CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECT�D STORM EVENTS AND TO
<br /> : `ENSURE THAT SEDIMENT AND SEDINiENT-LADEN WATER DO NOT LEAVE THE SITE.
<br /> 6. THE ESC FACfLITIES SHALL BE INSPECTED ROUTINELY AND MAINTAWED BY THE APPLICANT/CONTRACTOR TO ENSUR�THEIR
<br /> ,, CONTINUED FUNCTIONING, ESPECIALLY AFTER STORM EVENTS. , � �� �y
<br /> , 7. THE ESC FACILiTIES ON WACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONGE A MONTH OR WITHIN THE 48 : ��`"��� �� ��
<br /> HOURS FOLLOWING A MAJOR STORM EVENT.
<br /> ��� � �
<br /> I � : �
<br /> _ ' 8. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHW A TRAPPED CATCH BASIN. ALL
<br /> CATCH �ASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE GLEANING OP�RATION SHALL NOT FLUSH
<br /> ���
<br /> ' .~ _ _ _ _ : SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM. , � � ;;��, : �
<br /> , _ _ _ _ _ ; �_ ��a� �
<br /> 9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCT�ON AND MAINTAINED FOR THE � ��'�T���� ``��
<br /> DURATION OF THE PROJECI'. ADDITIONAL MEASURES MAY BE REQUIRED TO ENSURE THAT ALL PA1�ED AREAS ARE KEPT C ���� ���
<br /> LEAN �.�i�
<br /> FOR THE DURATION OF THE PROJECT.
<br /> , Date:2018.05.30 15:53:37-07'00'
<br /> : : '', 10. THE CONTRACTOR SHALL PROVIbE PERIODIC STREET CLEANING TO REMOVE DEBRIS AND SEDIME�VT TRACKED OFF THE SITE.
<br /> 11, APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING SURFACE WATER BODIES IF THE PROPOSED
<br /> BMPS FAIL. ,
<br /> , 12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED FOR NO MOR�THAN �2 DAYS FROM OCTOBER
<br /> 1 THROUGH APRIL 30, AND FOR NO MORE THAN 7 DAYS FROM MAY 1 THROUGH SEPTEMBER 30. '
<br /> . ',
<br /> ' CV � �'
<br /> RE�T STC�RiVI DF�AINAGE NOTES: ,
<br /> , 1. NO PART OF THE DRAINAGE SYSTEM SHALL BE COVERED, CONCEALED, OR PUT INTO USE UNTIL IT 1iAS BEEN iNSPECTED, TESTED
<br /> AND ACCEPTED BY THE CITY OF EVERETT. , �
<br /> I 2. ALL WORK AND MATERIAL SHALL CONFORM TO THE CITY OF EVERETT DESIGN AND CONSTRUCTIOhI STANDARDS AND
<br /> i ', SPECIFICATIONS AND THE WSDOT/APWA STANpARD SPECIFICATIONS FOR ROAD, BRIDGE,AND MUhJICIPAL CONSTRUCTION
<br /> ', (CURRENT EDITION). ,
<br /> , 3. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED FROM AVAILABLE RECORC�S AND ARE SHOWN FOR : �
<br /> , CONVENIENCE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF LOCATIONS AND TO AVOID DAMAGE TO ANY
<br /> , , ADDITIONAL UTILITIES SHOWN. IF CONFLICTS WITH EXISTWG UTILITIES ARISE DURWG CONSTRUCTION, THE CONTRACTOR SHALL
<br /> � . . . . . . . . . . � . . . . . . . . . . � . . . . . .. . . . . . . . � . - .
<br /> NOTIFY THE PU�LIC WORKS WSPECTOR AND ANY CHANGES REQUIRED SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO
<br /> COMMENCEMENT O� RELATED CONSTRUCTION ON THE PROJECT. ' �
<br /> � , �
<br /> 4. ALL STORM SYSTEMS WITHW THE PUBLIC RIGHT-0E-WAY OR IN EASEMENTS MUST BE STAKED BY�URVEY FOR LINE AND GRADE s
<br /> ,, PRIOR TO STARTING CONSTRUCTION. , �
<br /> , �
<br /> 5. ALL CATCH BASW GRATES MUST BE STENCILED OR STAMPED "DUMP NO WASTE, DRAINS TO STREAM, LAKE, RIVER, PUGET SOUND,
<br /> , OR WETLAND."CHOOSE APPR�PRIATE FEATURE FOR THE PROJECT. ', �
<br />. ', , �
<br /> _ , _ , �
<br /> �
<br /> . U
<br /> _ , �
<br /> . �
<br /> ' �
<br /> � EVERE�T �EWER NOTES: �
<br /> l.lJ
<br /> . , A. ALL WORK AND MATERIALS SHALL CONFORM TO THE CITY OF EVERETT STANDARDS AND WSDOT/AP4NA STANDARD � c+�
<br /> SPECIFICATIONS. � N
<br /> B. NO PART OF THE SANITARY SEWER SYSTEM SHALL BE COVERED, CONCEALED OR PUT INTO USE UNfiIL IT HAS BEEN TESTED, j �
<br /> , INSPECTED,AND APPROVED BYTHE CITY INSPECTOR. � Q Q
<br /> , ; C. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED FROM AVAILABLE RECORD�AND ARE SHOWN FOR � � �
<br /> .
<br /> , CONVENIENCE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERI�ICATION OF LOCATIONSAND 1`O AVOID DAMAGE TO ANY I— m 1-
<br /> � ADDITIONAL UTILITIES NOT SHOWN. IF CONFLICTS WITH EXISTING UTILITIES ARISE DURING CONSTRIJCTION,'THE CONTRACTOR w � � �j
<br /> SHALL NOTIFY THE PUBLIC WORKS iNSPECTOR AND ANY CHANGES RE Q U I R E D S H A L L B E A P P R O V E D BY THE CITY ENGINEER PRIOR � U �
<br /> _ , TO COMMENCEMENT OF RELATED CONSTRUCTION ON THE PROJECT. � � � j
<br /> D. ALL SEWER MAIN EXTENSIONS WITHIN THE PUBLIC RIGHT-�F-WAY OR IN EASEMENTS MUST BE STAKED BY SURVEY FOR LINE AND �- � d�' W
<br /> , GRADE PRIOR TO STARTING CONSTRUCTION.
<br /> REVISIONS
<br /> _ _
<br /> ,
<br /> Y . . . . . .. . . . � � . . � . � . . . . . � . . . � � . . . . . .. . I . . ' .. �. . .. . . � . . . . � . . �. . ,, . .. . - . � , �
<br /> - . � � .. . . . . . . . ' ' . ' ' � .. � ' . � . � . � . . � : . . . . . � � . . � . � ' .. . . . . . . . . � . . . . . � . . . . . . . . .. I . � Y �R TT ,/A\/A N ``] � . . � . . . . . . ..... . . . . � . . . . . . � .
<br /> . � . . . � ' . '. . ' . ' . ' . ' . . . . . � � � � . . � . � . � " . � . . . . . . � . . . . . . , . ; �f 0� ■ ■ '- i� \ � ■ 6���V• . . . . . . . � . . .
<br /> , A. NO CONNECTION TO THE EXISTING MAINS WILL BE ALLOWED EXCEPT BY MEANS OF AN APPROVED BACKFLOW PREVENTION DEVICE
<br /> . PRIOR TO SATISFACTORY FLUSHWG, TESTWG, DISWFECTION, AND REGEIPT OF SATISFACTC)RY BAG�'ERIOLOGICAL TEST RESULTS. pArE
<br /> ' B. �ONNECTIONS TO AND TAPS ON EXISTING MAINS WILL BE MADE BY THE PUBLIC WORKS DEPAR7MENT AT THE DEVELOPER'S oa:zs.2o�s
<br /> , EXPENSE. THE PUBLIC WORKS DEPARTMENT SHALL BE GIVEN AT LEAST 5 BUSINESS DAYS NOTICE F�7R EACH CONNECTION. THE
<br /> , PUBLIC WORKS DEPARTMENT SHALL THEREAFTER DETERMINE THE DATE AND TIME AT WHICH THE CONNECTION SHALL BE MADE. scr�,No.
<br /> C. ALL WORK AND MATERIALS MUST CONFORM TO CITY OF EVERETT STANDARDS. ', _
<br /> D. A PRE-CONSTRUCTION MEETING SHALL�E HELD WITH THE CITY PRIOR TO THE START O�CONSTRUCTION. THE CITY OF EVERETT 14249
<br /> PllBLIC WORKS CONSTRUCTION DIVISION MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO COMME�ICEMENT OF CONSTRUCTION. ��r+wNsv:RJB oesi�Neoav:SP/JFR
<br /> , E. THE DEVELOPER OR THE DEVELOPER'S AUTHORIZED AGENT SHALL NOTIFY THE PUBLIC WORKS DEF�ARTMENT
<br /> OF A PERS .
<br /> ON WHO
<br /> REVIEWE
<br /> �ay.JFR
<br /> , CAN BE CONTACTED REGARDING PROBLEMS DURING CONSTRUCTION ON A 24 HOUR BASIS. sHE�rnT�E
<br /> , � , F. MAINTAIN A MINIMUM OF 10 FEET HORIZONTAL AND 18 INCHES VERTICAL SEPARATION BETWEEN PO�'A�LE AND NON-POTABLE
<br /> , CONVEYANCE SYSTEMS. GENERAL NOTES
<br /> m ', G. ALL CITY OF EVERETT VALVES SHALL BE OPERATEDBY PUBLIC WORKS DEPARTMENT PERSONNEL ONLY. ALL VALVES, NEW AND
<br /> EXISTING, SHALL BE ACCESSIBLE AT ALL TIMES.
<br /> o . . :
<br /> 0
<br /> o ,
<br /> � �
<br /> � � ,
<br /> �
<br /> �
<br /> ¢
<br /> w �-,-
<br /> --i , p.. -
<br /> . . .. . . . . 4� � . .
<br /> � . LL . . . . , . . . . . . � � . . � . . � . . . . . . � . . � � . . . . � . � . . .. � � . . . . . . . � . . .� . .� . +r�
<br /> �Q , 4 „. r �,<<� �COPYRIGHT 2017-BCRA,INC.ALL RIGHTS RESERVE�D—' �n�.
<br /> v �—
<br /> , � i
<br /> d- ,
<br /> � £h ��� �..�.�
<br /> � ��^ . SHEET � �"'
<br /> a �/� . aO . . . . . . . . . . . .. . . . . . . . . . . � � . . .. . . . . . . . . . � . .. . . . . . � . . . - . . � � . . � , . . � . . � .. . . . . � . . � � � . . � . . � . . � . . � . �. ' r � . . � . . . . . E.� LY._
<br /> . �� . . . . . . . . . . . . . . . . . . . . � . . � � . . � . . �� �
<br /> � . N � . . . . . . . . . . . � . . � . . . � . . , . . . . . � . . . . . �. . . � . � . . . . . �� . . � � � � � � � . � . . � . . � . . � . �,� �� �� . � . . � . �..� .�„�,
<br />. � . � . � � . . . . . . . . . . . . . . � . .. . . . � . �',,, � . . . . , . . . . 'i,, �i & -Y � . . . . � �
<br /> . . . , . . . �� � � �.�
<br /> _ � � N� � �
<br /> a I , ' �11011V 11V�1a��S �����■ � �
<br /> ■ � �
<br /> � ,
<br /> C�II before you dig. �
<br /> 0
<br /> , , CIVIL PERMIT SET �
<br /> , IF SHEET MEASURES LE TH � �,
<br /> SS AN 24 X
<br /> 36 IT I
<br /> S�A REDUCED 1
<br /> PR NT.RED E
<br /> ,
<br /> UC SCALE ACCORDINGLY
<br /> a : '
<br />
|