Laserfiche WebLink
DocuSign Envelope ID:06CC5756-85D6-4B22-92FD-F6421337EFD7 <br /> the amount of$10,000 must be communicated to Sound Transit prior to work being <br /> performed. ST will require a brief scope of the work to be undertaken and a rough <br /> order of magnitude. <br /> 3.1.14 Utilities <br /> The City is responsible for connecting and maintaining utilities such as, but not limited <br /> to, electrical power, water, storm water and telephone to the extent reasonably <br /> necessary for the operation of the all parking areas and the bus/commuter rail <br /> platforms. <br /> 3.2 Roles and Responsibilities of Sound Transit <br /> 3.2.1 Signage Hardware <br /> Sound Transit will supply,install and maintainthe following regional signage and <br /> nformation display hardware for use at Everett Station as well as on the bus, <br /> Sounder and Amtrak platforms:. <br /> a. Regional T beacons; <br /> b. Platform Station Identification Signs; <br /> c. Route flags; <br /> d. Information displays; <br /> e. Regulatory signs; <br /> f. hformation signs; and <br /> g. Wayfinding signs. <br /> Sound Transit will provide quarterly signage maintenance in coordination with regular <br /> service changes. <br /> 3.2.2 Route Flag Changes <br /> Sound Transit will update the route flags on the bus platform at regularly <br /> scheduled service changes. Refer to Exhibit C The City will give Sound Transit <br /> 90 calendar days' notice for any route flag changes as a resut of service <br /> changes by Everett Transit. <br /> 3.2.3 Changeable Information <br /> Sound Transit will produce the Everett Station area maps, the Sound Transit <br /> system maps and the Sounder schedules that will be installed by the City in the <br /> signage hardware on the bus and rail platforms Refer to Exhibit C. <br /> 3.2.4 Security <br /> GA 0127-20 Page 5 of 24 <br />