My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Transpo Group USA Inc. 7/12/2021
>
Contracts
>
6 Years Then Destroy
>
2023
>
Transpo Group USA Inc. 7/12/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2021 11:11:56 AM
Creation date
7/23/2021 11:10:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Transpo Group USA Inc.
Approval Date
7/12/2021
Council Approval Date
6/30/2021
End Date
12/31/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
California St Pedestrian & Bicycle Corridor
Tracking Number
0002989
Total Compensation
$1,016,564.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A summary of all outreach efforts and the resulting feedback will be prepared and included with the <br /> project design documentation. <br /> Consultant Deliverables <br /> • Draft and final engagement strategy <br /> • Procured project mailing list <br /> • Branding kit <br /> • Project briefing kit with updates <br /> • Draft and final versions of the online open house, online survey, and a project graphics/flyer <br /> • Draft and final media advertisements. <br /> • Draft and final versions of an event planner <br /> • Preliminary Draft version of the outreach summary and appendices. <br /> Task 1-7 — Vacant <br /> Schedule <br /> The anticipated schedule for Phase 1 is approximately 6 months. The following milestones are <br /> anticipated for Phase 1: <br /> • Project kickoff meeting <br /> • First stakeholder meeting <br /> • Alternatives identification meeting(s)with City <br /> • Alternatives criteria identification and meeting(s)with the City <br /> • Alternatives evaluation meeting(s)with the City <br /> • Development of the second stakeholder meeting process <br /> o Conducting of the second stakeholder meeting <br /> o Support of the third stakeholder meeting with Everett's Transportation Advisory <br /> Committee. <br /> • Identification of a preferred alternative <br /> • Completion and submittal of a 30% PS&E package <br /> • Submittal of a draft PFA <br /> transpogroup 7r Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.