Laserfiche WebLink
Phase 4 — Construction Engineering <br /> Construction Engineering includes the tasks of addressing contractor questions or field modifications, and <br /> the field inspection and monitoring of construction activities. High level tasks are outlined below, but <br /> detailed costs are not included at this time. The cost of construction engineering is anticipated to be <br /> included in the grant funding requests for the construction phase of the project. Construction engineering <br /> costs will be updated in a future amendment, and a more detailed scope provided when previous design <br /> phases have been completed and more details of the project are known. <br /> Task 4-1 — Project Management <br /> The tasks, roles and expectations for Task 4-1 are the same as for Task 1-1. The following additional <br /> meet is anticipated for Task 4-1: <br /> 1. Pre-construction conference <br /> The scope does not anticipate Transpo Group's participation at weekly construction field meetings. A <br /> representative of KBA, Inc. will participate in construction field meetings at the City's request. <br /> Task 4-2 — Construction Engineering <br /> KBA, Inc. will provide field inspection and construction engineering for the City, in compliance with the <br /> requirements for a federally-funded project. Details of KBA, Inc.'s scope will be developed following <br /> completion of Phase 1 as more is known about the final form of the project. <br /> transpoaroup 'r Page 16 <br />