My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Transpo Group USA Inc. 7/12/2021
>
Contracts
>
6 Years Then Destroy
>
2023
>
Transpo Group USA Inc. 7/12/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2021 11:11:56 AM
Creation date
7/23/2021 11:10:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Transpo Group USA Inc.
Approval Date
7/12/2021
Council Approval Date
6/30/2021
End Date
12/31/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
California St Pedestrian & Bicycle Corridor
Tracking Number
0002989
Total Compensation
$1,016,564.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit I <br /> Alleged Consultant Design Error Procedures <br /> The purpose of this exhibit is to establish a procedure to determine if a consultant's alleged design error is of a <br /> nature that exceeds the accepted standard of care. In addition, it will establish a uniform method for the resolution <br /> and/or cost recovery procedures in those instances where the agency believes it has suffered some material damage <br /> due to the alleged error by the consultant. <br /> Step 1 Potential Consultant Design Error(s) is Identified by Agency's Project Manager <br /> At the first indication of potential consultant design error(s), the first step in the process is for the Agency's <br /> project manager to notify the Director of Public Works or Agency Engineer regarding the potential design <br /> error(s). For federally funded projects,the Region Local Programs Engineer should be informed and <br /> involved in these procedures. (Note: The Director of Public Works or Agency Engineer may appoint an <br /> agency staff person other than the project manager,who has not been as directly involved in the project, <br /> to be responsible for the remaining steps in these procedures.) <br /> Step 2 Project Manager Documents the Alleged Consultant Design Error(s) <br /> After discussion of the alleged design error(s)and the magnitude of the alleged error(s), and with the <br /> Director of Public Works or Agency Engineer's concurrence,the project manager obtains more detailed <br /> documentation than is normally required on the project. Examples include: all decisions and descriptions <br /> of work; photographs, records of labor, materials and equipment. <br /> Step 3 Contact the Consultant Regarding the Alleged Design Error(s) <br /> If it is determined that there is a need to proceed further,the next step in the process is for the project <br /> manager to contact the consultant regarding the alleged design error(s) and the magnitude of the alleged <br /> error(s). The project manager and other appropriate agency staff should represent the agency and the <br /> consultant should be represented by their project manager and any personnel (including sub-consultants) <br /> deemed appropriate for the alleged design error(s) issue. <br /> Step 4 Attempt to Resolve Alleged Design Error with Consultant <br /> After the meeting(s)with the consultant have been completed regarding the consultant's alleged design <br /> error(s), there are three possible scenarios: <br /> • It is determined via mutual agreement that there is not a consultant design error(s). If this is the case, <br /> then the process will not proceed beyond this point. <br /> • It is determined via mutual agreement that a consultant design error(s) occurred. If this is the case, <br /> then the Director of Public Works or Agency Engineer, or their representatives,negotiate a settlement <br /> with the consultant. The settlement would be paid to the agency or the amount would be reduced from <br /> the consultant's agreement with the agency for the services on the project in which the design error <br /> took place. The agency is to provide LP, through the Region Local Programs Engineer, a summary <br /> of the settlement for review and to make adjustments, if any, as to how the settlement affects federal <br /> reimbursements.No further action is required. <br /> • There is not a mutual agreement regarding the alleged consultant design error(s). The consultant may <br /> request that the alleged design error(s) issue be forwarded to the Director of Public Works or Agency <br /> Engineer for review. If the Director of Public Works or Agency Engineer, after review with their legal <br /> counsel, is not able to reach mutual agreement with the consultant,proceed to Step 5. <br /> Agreement Number: LA-9863 <br /> Exhibit I-Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 01/01/2020 Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.