Laserfiche WebLink
SECTION 10450-FLOW DEVICES -- <br /> -- ----(,_______ _ __ _A _ . ___ _ . _ _ _______. ______ _ ___ - - ----- <br /> FLOW DEVICE NO I ESPART 1 GENERAL <br /> 1.1 SUMMARY SHEET <br /> A. Section Includes: Wal-Mart furnished flow devices for assembly and installation by Contractor. <br /> 1.2 REFERENCES <br /> 1. FLOW DEVICES REQUIRE 5 PSF MAXIMUM OVERRIDE A. The publications listed below form a part of this specification to the extent referenced. Publications are referenced within the text by the basic 1. ALL ELECTRICAL WORK INCLUDING DATA AND POWER " <br /> FORCE TO OPEN IN THE DIRECTION OF BUILDING designation only. DISCONNECTION BY GC. <br /> EGRESS. B. Occupational Safety and Health Administration (OSHA): OSHA 01926.1153 Respirable Crystalline Silica. 2, INSTALLATION OF NEW POWER POLES BY GC. <br /> 1.3 ENVIRONMENTAL REQUIREMENTS <br /> 3. GENERAL CONTRACTOR RESPONSIBLE FOR ALL ELECTRICAL <br /> 2, SIGNAGE: IN CONTRASTING COLORS TO THE A. Minimize dust emissions and provide equipment that suppresses dust. WORK. i4 architecture <br /> BACKGROUND, TEXT TO READ: "EMERGENCY EXIT <br /> 4. GENERAL CONTRACTOR RESPONSIBLE FOR ANCHORS AND ALL <br /> ONLY PUSH TO OPEN". PART 2- PRODUCTS ANCHORAGE. <br /> � i�I�� �I � <br /> 2.1 SUPPLIERS 5. GENERAL CONTRACTOR TO REPAIR FLOOR AS REQUIRED AT <br /> 3. ANCHORAGE:ALL FOUR ANCHORS ARE TO BE A. Owner's flow device Supplier: 2809 Ajax Avenue Suite too <br /> 1. Technibilt LTD, A Wanzl Company, � LOCATIONS OF NEW FLOW DEVICES. Rogers Arkansas 72758 <br /> INSTALLED IN EACH FLOW DEVICE. DO NOT INSTALLpany, Newton, NC (828) 46T 7388, 6. GENERAL CONTRACTOR TO INSTALL RAILING PER Phone:479.636.3545 <br /> ON TRANSITION STRIP. 2.2 PRODUCTS MANUFACTURERS RECOMMENDATIONS AND INSTRUCTIONS Fax:479.636.1209 <br /> A. Flow device and Rails: FOR INSTALLATION AND ANCHORING. <br /> 4. THIRD PARTY TO CALIBRATE FLOW DEVICES. 1. Model:Technoport, by Technibilt. architect of Record <br /> GENERAL CONTRACTOR TO LEAVE GATES IN <br /> William Douglas Hurley <br /> Washington License No. 5 <br /> SECURED OPEN POSITION AFTER INSTALLATION,ZIP PART 3- EXECUTION Unified Business ID No.602:8981 <br /> 668 <br /> TIE OPEN LOOSELY. DO NOT OVERTIGHTEN. 3.1 EXAMINATION <br /> A. Contractor shall examine existing flooring conditions prior to start of installation. ._. .____ 56:85. AFTER CONSTRUCTION: DELIVER ALL FLOW DEVICE 1. Rubber flooring, Carpet- Remove portion of flooring and install devices and rail directly to floor slab. <br /> KEYS AND REMOTES TO STORE MANAGER AFTER 2. VCT, PVC and Ceramic Tile- Flooring may remain. Instal€ DEVICE and rail directly to these surfaces. w <br /> w } o INSTAL LATION OF FLOW DEVICE. PROVIDE NAME OF 3. Transition Strips- Do not install on transition strip. , w c D o Sw ;MANAGER TO WHOM KEYS AND REMOTES WERE 3.2 INSTALLATION( A. Provide drills e pp : a.u- = <br /> �,DELIVERED BOTH THE THIRD PARTY CALIBRATION qui ed with aHEPA-rated lister vacuum dust collection system to maintain dust emissions below the permissible level. w �B. Drill holes with rotar c .. Q o o <br /> COMPANY AND WALMART CM}. CONTACT THIRD y impact hammer drills using carbide tipped bits. Drill bits shall bo of diameters) as specified by the anchorQ o o PPARTY TO COORDINATE GATE CALIBRATION. manufacturer. Unless otherwise shown on the Drawings, all holes shall be drilled perpendicular to the base material surface, and all anchor � z, on <br /> holes must be used. o o¢o > F�'c <br /> z Q"zo�,999ou o5o <br /> 6. THIRD PARTY CALIBRATION COMPANY: C. Assemble and install flow devices in accordance with manufacturer's instructions and this Section. In the case of conflict between O �"_w D o z z =z 6 z <br /> FRENCH COMPANY, LLC manufacturer's instructions and this Section, the manufacturer's instructions will govern. c� a a o o <br /> shown -- oo922o~QU98 <br /> 1-855-404-2837 1. Install flow device standing columnsand pedestals where on Drawings. � � <br /> gates@frenchcompanyllc.com 2. Use all anchor locations in column base plates. o o o o o <br /> p_9w59=z9zmwmA <br /> a. Remove dust from drilled holes with HEPA-rated filter vacuum. �. T w>o a o l-x a w y D <br /> 3. Install low-voltage electrical connections between system components per manufacturer's instructions. Di <br /> w a o a o w J <br /> 4. Connect to power supply as shown on Drawings. <br /> D. General Contractor to leave devices in secured open position after installation. Owner will coordinate and schedule with a third party to <br /> calibrate device arms after installation. <br /> END OF SECTION <br /> r <br /> u <br /> % 9 0 c <br /> 0_0 (.5 a_ <br /> Ccd < i(T)). <br /> z <br /> w <br /> 1-- <br /> C <br /> I <br /> ocv <br /> Ooi <br /> NI. w <br /> D <br /> Lii <br /> RAIL POST c <br /> cd <br /> \ O : <br /> 0 <br /> EXISTING FLOORING TO - _ _ . <br /> � REMAIN ISSUE BLOCK <br /> PATCH AND REPAIR <br /> FLOORING AS REQUIRED <br /> \AFTER INSTALLATION OF �- ATTACH FLOW DEVICE POST I <br /> FLOW DEVICES AND RAILING AND RAIL TO EXISTING <br /> FLOORING. , <br /> N. <br /> / <br /> CART RAIL <br /> FLOW DEVICE POST <br /> (---- FLOW B EV 1 C E DETAIL 1 <br /> \ 1/2"= 1'-0" <br /> CHECKED BY: JT <br /> DRAWN BY: KLR <br /> PROTO CYCLE: 07/26/19 <br /> DOCUMENT DATE: 08/14/19 <br /> G \ <br /> II jJ <br /> : LI T <br /> in 1 4 ) \ <br /> d <br /> 0 <br /> 11 <br /> O 1 O <br /> CD <br /> p i <br /> I I, ,, ( <br /> ,L:, 1-__J1 : 21 Iv' -1:---] <br /> Rli al I 1, <br /> 1 <br /> 1.. . (c). a 1, <br /> d <br /> Fl <br /> b POWER POLE (TYP) "' HI NN <br /> REF ELECTRICAL " A1NNN <br /> G®TEER POLE NOT OPERAT ON TO OBSTRUCT <br /> �.. \\\�/ .,.` s g e k <br /> FLOW DEVICE OWNER FURNISHED GC 4` �� <br /> a INSTALLED (TYP)ATTACH EACH GATE \ A a ( \ � � �� \ <br /> Po <br /> POST WITH FOUR ANCHORS PROVIDED I, __,-J ‘afAI OFW S `s*0"` 0 <br /> WITH GATES AND IN ACCORDANCE \ ' ( } \1 � � \ \ <br /> m WITH MANUFACTURERS \ �' \ ,: \ .t <br /> to' INSTRUCTIONS (TYP) r \ d <br /> A <br /> REF 4- Al v co H� ± �H C <br /> CART RAIL \ ji' 1 4 la 8 I <br /> n <br /> -- - OWNER FURNISHED, GC INSTALLED (TYP) aorb ° roDOCUMENTS THAT DO NOT <br /> �i INSTALL PER ANCHOR PLANS AND - <br /> - <br /> ® - HAVE THE ARCHITECT OR <br /> MANUFACTURER'S INSTRUCTIONS �� \ IO 0 0 L -J [ <br /> ,a, O ENGINEER OF RECORD SEAL <br /> 's`. *'- n.n:: r.k .'`,:.. � �s r= a' %ai, \ (v,...vv.fv,, ,,v.' <br /> fifiV ., � ' : \ _ \ Ili _ (NJ CO ', C. <br /> �� � z:n = � � kv � - - �1 �� AND SIGNATURE SHALL BE <br /> F , + O` ,. a i .� , � , � F - am f <br /> `, �� 3 Al <br /> �. _ t -'�\ �IX� ,, � -- ; , ,, - .� 'r \ 1 u u u �� CONSIDERED NOT FOR <br /> r- *�.a „ ..s Y' .. s�. +'t�;h`�a'' r a ;n " i?"xn �' M Y�";i=e <br /> e, CONSTRUCTION <br /> (7-- ) <br /> '.lI -� co - - co \� i J 12 vI <br /> �l CJ r1. _ - - - - \\ - \ I; - II _ _ �-� c�') \�P' ,o i'� o fi .o o 0 0 0 0 _, <br /> in <br /> \ 1 <br /> 1 cN 1 <br /> 6 9' <br /> 0 <br /> _J 1 j REF REF PLAN am <br /> o <br /> 4" 7°' 8 1/2" 6 l/2 6" <br /> 1 0 <br /> REF PLAN REF r 1" 0" <br /> .' �r "(PLAN' ENTRY TILE <br /> m PLAN EXTENTS <br /> o <br /> cn POWER POLES NOT SHOWN FOR CLARITY <br /> o <br /> 0 <br /> 11. <br /> „1:, FLO DEVICE ELEVATION z'--- FLO DEVICE PLAN i------ PARTIAL EGRESS PLAN <br /> co <br /> SHEET: <br />