Laserfiche WebLink
June 30, 2021 <br /> AGREEMENT — DESIGN OF CALIFORNIA STREET PEDESTRIAN BICYCLE <br /> CORRIDOR <br /> To authorize the Mayor to sign the Local Agency A&E Professional Services <br /> Consultant Agreement with Transpo Group USA, Inc. for the design of the <br /> California Street Pedestrian Bicycle Corridor in the amount of$1,016,564. <br /> AGREEMENT— REPLACEMENT OF RESERVOIR 2 <br /> To authorize the Mayor to sign the Professional Services Agreement with <br /> Materials Testing and Consulting, Inc. in the amount of$63,171. <br /> JOB COMPLETE—WATERMAIN REPLACEMENT "U" PROJECT <br /> To accept the Watermain Replacement "U" Project as complete with Road <br /> Construction Northwest, Inc. and authorize the Mayor to sign the Certificate of <br /> Completion and release of retention bond. <br /> • <br /> AGREEMENT— EVERETT STATION OPERATIONS AND MAINTENANCE <br /> To authorize the Mayor to sign the Everett Station Operations and Maintenance <br /> Agreement Between Sound Transit and the City of Everett. <br /> AGREEMENT — REIMBURSEMENT OF COVID-19 VACCINATION RELATED <br /> COSTS <br /> To authorize the Mayor to sign the Interlocal Agreement and the Business <br /> Associate Agreement with the Snohomish Health District to pursue <br /> reimbursement of COVID-19 vaccination related costs. <br /> AGREEMENT — EASEMENT FOR UNDERGROUND ELECTRIBUTION <br /> FACILITIES <br /> Authorize the Mayor to sign the Easement Agreement with Public Utility District <br /> No. 1 of Snohomish County for underground electrical distribution facilities <br /> located in a portion of Everett's Water Transmission Line 5 corridor. <br /> • <br /> 5 <br />