My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Verena Schwippert 7/19/2021
>
Contracts
>
6 Years Then Destroy
>
2023
>
Verena Schwippert 7/19/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 10:31:50 AM
Creation date
7/30/2021 10:31:39 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Verena Schwippert
Approval Date
7/19/2021
End Date
7/16/2023
Department
Parks
Department Project Manager
Kimberly Shelton
Subject / Project Title
Sculpture Loan "Shalom"
Tracking Number
0002994
Total Compensation
$1,500.00
Contract Type
Agreement
Contract Subtype
Use of Property
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Please note any handling instructions: <br /> My 1 tom truck with crane would be used for delivery and installation.Truck needs to be able to stand 3 feet <br /> from the pedestal. I or z assistants would help. the z pieces of sculpture would be connected by pins and <br /> epoxy <br /> 3. INSTALLATION AND REMOVAL <br /> Will you install and remove the Work? Yes (X)No ( ) <br /> What special requirements do you have for installation and removal of the work(e.g., pad, <br /> connections, crane) <br /> Crane truck needs to be 3'from the pedestal to install and remove sculpture. <br /> The City shall not pay Lender for installation and removal of the Work. The City shall directly <br /> or indirectly pay or arrange for third party services reasonably necessary for installation and <br /> removal of the Work, including, but not limited to, a crane. <br /> Sculpture Loan Agreement 2020 <br /> Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.