Laserfiche WebLink
Survcyin� <br /> En�ineerin� <br /> Planning <br /> 2021 STANDARD FEE SCHEDULE <br /> The below list contains a schedule of fees for services performed by Land Development Consultants, Inc. <br /> STAFF TYPE RATE <br /> Principal/Director $210 <br /> Senior Project Manager/Planning Manager $190 <br /> Project Manager/Senior Planner $170 <br /> Project Engineer $155 <br /> Design Engineer $140 <br /> E.I.T. $120 <br /> Senior Designer $155 <br /> Planning Manager $190 <br /> Senior Planner $170 <br /> Planner $145 <br /> Associate Planner $125 <br /> Planning Technician $100 <br /> Senior Land Surveyor $175 <br /> Professional Land Surveyor $160 <br /> Project Surveyor $145 <br /> Senior Survey Technician $135 <br /> Chief of Parties $145 <br /> 0 <br /> Survey Technician $120 <br /> Survey Crew Chief II $140 a <br /> Survey Crew Chief I $120 <br /> Survey Assistant $80 <br /> Clerical $75 <br /> GIS Specialist $110 <br /> CU <br /> Senior CAD Technician $135 <br /> Cad Technician III $125 N <br /> CAD Technician II $115 <br /> CAD Technician I $105 <br /> Project Coordinator $105 <br /> Project Administrator $105 <br /> 0 <br /> REIMBURSABLE RATE z <br /> Outside Services Cost + 15% <br /> Plotting Color(24"x 36") $15.00 each <br /> Plotting Black and White (24"x 36") $2.00 each <br /> Color (11"x 17") $2.00 each <br /> PDF File Conversion $105.00/hr o <br /> This standard fee schedule is subject to annual adjustment on January 1st of each year to reflect increased <br /> costs due to inflation. <br /> Service ABOVE the Standard ph:425.806.1 869 a fx: 425.482.2893 www.LDCcorp.com <br />