My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD 2019 BLDG 40-58 Plans 2022-11-09 (6)
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-58
>
Plans
>
3003 W CASINO RD 2019 BLDG 40-58 Plans 2022-11-09 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 10:26:00 AM
Creation date
8/4/2021 11:25:38 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-58
Permit
M1905-081
Year
2019
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
\ D- X 0 DRAW \ GS <br /> DRAWING NUMBER DRAWING TITLE DATE DRAWING NUMBER DRAWING TITLE DATE DRAWING NUMBER DRAWING TITLE DATE DRAWING NUMBER DRAWING TITLE DATE <br /> GENERAL STUCTUAL IVECHA\ ICAL MECHA\ ICAL can 't <br /> 40-058-GO COVER SHEET 04.02.19 40-058-S2 FOR REFERENCE ONLY Design Criteria 10.09.14 40-058-M 1 a KEY SHEET 04.10.18 40-058=M551-3.2R Removal — Plumbing Sections 04.02.19 <br /> 40-058-G17 SHEET INDEX (PHP-2) 04.02.19 40-058—S2g Phase II — General Notes 08.08.17 40-058-M1 ca Process Flow Diagram - PACU-4, EF-52 09.06.16 40-058-M551-3.2a Plumbing Sections 04.10.18 <br /> 40-058-G18 SHEET INDEX (PHP-2) 04.02.19 40-058—S2h Phase II - General Notes 08.08.17 40-058—M1 da Process Flow Diagram - PACU-3, EF-51 09.06.16 40-058-M551-3.3R Removal - Plumbing Sections 04.02.19 <br /> 40-058—S2j Phase II — Statement of Special Inspections . 08.08.17 40-058—M1 ea Phase II — Process & Domestic Water Flow Diagram 08.08.17 40-058—M551-3.3a Plumbing Sections 08.08.17 <br /> 40-058—S2k Phase II — Statement of Special Inspections 08.08.17 40-058—M1fa Phase II — Compressed Air Flow Diagram 09.19.17 <br /> 40-058—S21 Phase II — Statement of Special Inspections 08.08.17 <br /> 40-058—M1h Controls Sequence of Operation 09.06.16 40-058-M551-3.4a Plumbing Details 09.19.17 <br /> 40-058—S212e FOR REFERENCE ONLY - Partial Grid 4 Elevation 05.17.16 <br /> 40-058—M1 h.1 Controls Sequence of Operation 08.01.17 40-058—M551-3.7 Plumbing Sections 11.15.16 <br /> A C H I T E C T U . A L 40-058—S439b FOR REFERENCE ONLY — Autoclave Pipe Supports 03.08.16 <br /> 40-058—S502-1R Phase II — REMOVAL — Enlarged Tooling Plan 40-058-M 1 ha Controls Sequence of Operation 04.02.19 40-058—M551-3.8a Plumbing Sections 04.10.18 <br /> 08.08.17 <br /> 40-058—S502-2R Phase II — REMOVAL — Enlarged Tooling Plan 08.08.17 40-058-M1ha.1 Controls Sequence of Operation 04.02.19 40-058—M551-4.1R Removal — Plumbing Sections 04.02.19 <br /> 40-058—A509a Phase II — P2P — Details 11.27.18 40-058—S502-3R Phase II — REMOVAL — Enlarged Tooling Plan 08 08 17 40-058—M 1 i Controls Points List 07.12.16 40-058—M551-4.1 a Process System Sections 09.19.17 <br /> 40-058-A510A Phase II P2P — Details 04.02.19 40-058—S502-4R Phase II — REMOVAL — Enlarged Tooling Plan 08.08.17 40-058—M1ia Controls Points List 04.02.19 <br /> 40-058—A513 Phase II — P2P — Details 09.19.17 40-058—S502 FOR REFERENCE ONLY — Enlarged Tooling Plan 12.01.16 HVAC Air Flow`Diagram — MAU-04, MAU-07, VAV-1-1, EF-53, EF-56,° EF-60, 40-058—M552-1.1 a HVAC Details 01.08.19 <br /> 40-058-M 1 ja EF-61 04.02.19 <br /> 40-058—A528A Phase II — P2P — Details 07.03.18 40-058—S502a FOR REFERENCE ONLY — Enlarged Tooling Plan 04.19.16 40-058—M552-1.2a HVAC Details 01.10.17 <br /> 40-058—A600-0a2 Phase II P2P Code Analysis — Plenum Level 08.08.17 40-058—M l ka HVAC Air Flow Diagram — MAU-06, EF-57 06.19.18 <br /> 40-058—S502b Phase II — Enlarged Tooling Plan 08.08.17 40-058-M552-1.3a HVAC Details 07.12.16 <br /> 40-058—A600-0b2 Phase II P2P Code Analysis — Paint Booth Level 08.08.17 40-058-S502-1 FOR REFERENCE ONLY — Enlarged Tooling- Plan 04 02.19 40-058—M1la HVAC Air Flow Diagram — ACU-28, VAV-5, VAV-6 01.10.17 <br /> 9 40-058—M552-1.4a HVAC Details 12.01.16 <br /> 40-058—A600-0c2 Phase II P2P Code Analysis — Control Room Level 08.08.17 40-058—S502-1a Phase II - Enlarged Tooling Plan 40-058—M1oa Vacuum Flow Diagram — SE-2, EX-2 09.19.17 <br /> 04.03.18 40-058—M552-1.5a HVAC Details 03.08.16 <br /> 40-058—A600-0d Phase II - P2P Code Analysis — Equipment Platform Level 09.19.17 40-058—M1pa HHW & CHW Water Flow Diagram — ACU-28, MAU-04, MAU-05, MAU-06 04.05.16 <br /> 40-058—S502—1 b FOR REFERENCE ONLY — Enlarged Tooling Plan 08.23.16 40-058—M552-1.6a HVAC Details 11.01.16 <br /> 40-058—A600-0e2 Phase 11 — P2P Code Analysis — Paint Booth Control Areas 08.08.17 40-058—S502-1c FOR REFERENCE ONLY — Enlarged Tooling Plan 05.17.16 40-058—Mlqa Industrial Waste Diagram IWP-16-26, 35, 36, 27-34 09.19.17 <br /> 40-058—M552-1.8a HVAC Details 10.18.16 <br /> 40-058—A600-1 b Phase II — P2P Paint Operations — Plenum Level Booths 2 07.03.18 40-058—M1 ra Trap Primer Flow Diagram 08 08 17 <br /> 40-058—S502-1d Phase II — Enlarged Tooling Plan 08.08.17 40-058—M552-1.9 HVAC Details 01.10.17 <br /> 40-058—A600-2b Phase II — P2P Paint Operation — First Floor 09.19.17 40-058—M2pa Phase II — Fire Protection Note Sheet 08.08.17 <br /> 40-058—S502-2 FOR REFERENCE ONLY — Enlarged Tooling Plan 12.20.16 40-058—M552-1.10 HVAC Details 01.10.17 <br /> 40-058—A600-2d Phase II — P2P Paint Operations — First Floor 10.17.17 40-058—M2r FOR REFERENCE ONLY — Fire Protection Site Plan 12.05.14 <br /> 40-058—S502-2a Phase II — Enlarged Tooling Plan 04.03.18 40-058—M552-1.10a HVAC Details 04.02.19 <br /> 40-058—A600-3b Phase II — P2P Paint Operations House Mechanical Level 08.08.17 40-058—M2va HVAC Equipment Schedules 04.02.19 <br /> 40-058—S502-3 FOR REFERENCE ONLY — Enlarged Tooling Plan 12.20.16 40-058-M552-3.1 Plumbing Details 01.10.17 <br /> 40-058—A600-4b Phase II — P2P Paint Operations — Control Room 06.19.18 40-058-M2WR Removal — Plumbing Process Equipment Schedules 04.02.19 <br /> 40-058—S502-3a Enlarged Tooling Plan 04.03.18 40-058—M587a Phase II — Fire Protection Details 08.08.17 <br /> 40-058—A600-5b Phase II — P2P Paint Operations — Equipment Level 07.03.18 40-058—M2wa PlumbingProcess Equipment Schedules 08.08.17 <br /> 40-058—S502-4 FOR REFERENCE ONLY — Enlarged Tooling Plan 08.08.17 40-058—M588 FOR REFERENCE ONLY — Fire Protection Details 02.21.17 <br /> 40-058—A600-6 Phase 11 — P2P Paint Operations — Furniture/Equipment Plans 06.19.18 40-058—M2xa Process Equipment Schedule 09.19.17 <br /> 40-058—S502-4a Enlarged Tooling Plan 07.03.18 <br /> 40-058-A600-7a Phase II P2P Paint Operations - Mixing Room Equipment Plan 04.02.19 40-058-TNM260-59a Phase II — Partial Fire Protection Plan 08.08.17 <br /> 40-058—A600-10 Phase II — P2P Paint Operations — Ext Booth Elevations 08.08.17 40-058—S502-5 Braced Frames 07.12.16 <br /> _ 40-058-1M260-49 FOR REFERENCE ONLY — Partial Fire Protection Plan 04.04.17 <br /> 40-058—A600-11 Phase II — P2P Paint Operations — Elevations 09.19.17 40-058—S502-5a FOR REFERENCE ONLY - Braced Frames 08.23.16 <br /> 40-058-1M260-54 FOR REFERENCE ONLY — Partial Fire Protection Plan 05.31.16 <br /> 40-058—A600-13 Phase II — P2P Paint Operations — Int Booth Elevations 08.08.17 40-058—S502-5c Phase II — Braced Frames 08.08.17 <br /> 40-058-1M260-59a Phase II — Partial Fire Protection Plan 08.08.17 <br /> 40-058—A600-14 Phase II — P2P Paint Operations — Int Booth Elevations 08.08.17 40-058—S502-5e Braced Frames 09.20.16 <br /> 40-058—M1M260-59a Phase II — Partial Fire Protection Plan 08.08.17 <br /> 40-058—A600-22 Phase II — P2P Paint Operations — Sections 08.08.17 40-058—S502-5f Braced Frames 11.15.16 <br /> 40-058—A600-25 Phase II — P2P Paint Operations — Sections 08.08.17 40-058—S502-5g Phase II — Braced Frames 08.08.17 40-058-2M260-59a Phase II — Partial Fire Protection Plan 09.19.17 <br /> 40-058—A600-26 Phase 11 — P2P Paint Operations — Sections 08.08.17 40-058—S502-9 Phase II — Tooling Details. 08.08.17 40-058-3M260-59a Phase II - Partial Fire Protection Plan 08.08.17 <br /> . <br /> 40-058—A600-30 Phase II — P2P Ceiling Plan 08.08.17 40-058—M481-54.10 Enlarged HVAC Ductwork Plan 06.19.18 <br /> 40-058—S502-12 Phase II — Tooling Details 08.08.17 <br /> 40-058—A600-40 Phase II - P2P Paint Operations — Door Schedule 09.19.17 40-058—M481-59.05a Enlarged HVAC Ductwork Plan 04.05.16 <br /> 40-058—S502-13 Phase II — Tooling Details 08.08.17 <br /> 40-058—A600-61 Phase II — P2P Paint Operations — Enlarged Stair Plans 08.08.17 40-058-M481-59.10a Enlarged HVAC Ductwork Plan 04.02.19 <br /> 40-058—S502-14 Phase II — Tooling Details 08.08.17 <br /> 40-058—A600-63 Phase 11 — P2P Paint Operations — Stair Sections 08.08.17 40-058-M481-59.15a Enlarged HVAC Ductwork Plan 04.02.19 <br /> 40-058—A600-71 Phase II P2P Paint Operations — Details 08.08.17 40-058—S502-15 Tooling Details 09.20.16 <br /> 40-058—M481-59.20a Enlarged HVAC Ductwork Plan 06.19.18 <br /> 40-058—A600-72 Phase II — P2P Paint Operations — Details 09.19.17 40-058—S502-16 Tooling Details 10.04.16 <br /> 40-058—M481-59.35a Enlarged HVAC Ductwork Plan 06.19.18 <br /> 40-058—A600-73 Phase II — P2P Paint Operations - For Reference Details 08.23.16 40-058—S502-17 Tooling Details 11.01.16 <br /> 40-058—M481-59.40a Enlarged HVAC Ductwork Plan 06.19.18 <br /> 40-058—A600-74 Phase II — P2P Paint Operations — Details 11.15.16 40-058—S502-18 Phase II - Tooling Details 08.08.17 <br /> 40-058—M481-59.45a Enlarged HVAC Ductwork Plan 06.19.18 <br /> 40-058—A600-75 Phase II — P2P Paint Operations — Details 11.15.16 40-058-S502-19 Phase II — Tooling Details 08.08.17 <br /> 40-058-M481-59.50a Enlarged HVAC Ductwork Plan 04.02.19 <br /> 40-058—S502-20 Tooling Details 08.23.16 <br /> 40-058-M481-59.55a Enlarged HVAC Ductwork Plan 04.02.19 <br /> 40-058—S502-21 Phase II Tooling Details 08.08.17 <br /> 40-058—M482-59.20a Enlarged HVAC Piping Plan 11.01.16 <br /> 40-058—S502-23 Tooling Details 11.15.16 <br /> 40-058-M482-59.35a Enlarged HVAC Piping Plan 04.10.18 <br /> 40-058—S502-24 Phase II — Tooling Details 08.08.17 <br /> 40-058—M482-59.45a Enlarged HVAC Piping Plan 09.19.17 <br /> 40-058—S502-25 Tooling Details 11.01.16 <br /> 40-058—M483-59.05a Enlarged Plumbing Plan 09.19.17 <br /> 40-058—S502-26 Phase II — Tooling Details 08.08.17 <br /> 40-058-M483-59.10a Enlarged Plumbing Plan 04.02.19 <br /> 40-058-S502-27 Phase ll — Tooling Details 04.02.19 <br /> 40-058—M483-59.15a Enlarged Plumbing Plan 10.17.17 <br /> 40-058—S502-53 Panel Paint Industrial Waste Supports 07.03.18 <br /> 40-058-M483-59.20R` Removal — Enlarged Plumbing Plan 04.02.19 <br /> 40-058—RFS161-34a FOR REFERENCE ONLY — North Wall Pipe Rack East of AutoClave 11.01.16 40-058—M483-59.20a Enlarged Plumbing Plan 04.02.19 <br /> 40-058—RFS161-39 FOR REFERENCE ONLY — Partial Low Roof Framing Plan 03.08.16 40-058—M483-59.35a Enlarged Plumbing Plan 10.17.16 <br /> 40-058—RFS161-44 FOR REFERENCE ONLY - Partial Low Roof Framing Plan 01.15.16 40-058—M483-59.45a Enlarged Plumbing Plan 10.17.17 <br /> 40-058—RFS161-49 FOR REFERENCE ONLY — Partial Low Roof Framing Plan 01.15.16 40-058—M483-59.50a Enlarged Plumbing Plan 01.08.19 <br /> 40-058—RFS161-54 FOR REFERENCE ONLY — Partial Low Roof Framing Plan 03.08.16 40-058-M483-59.55R Removal — Enlarged Plumbing Plan 04.02.19_ <br /> 40-058-RFS162-59 Phase II — P2P Exhaust Stack Support 04.02.19 40-058-M483-59.55a Enlarged Plumbing Plan 04.02.19 <br /> 40-058-RFS162T-59 Phase II — Partial Roof Top Chord Framing Plan 04.02.19 40-058—M484-59.10R Removal — Enlarged Process Piping Plan 04.02.19`' <br /> 40-058—RFS163-59 Phase II — PHP Duct Support 10.17.17 08.08.17 <br /> 40-058—M484-59.15a Enlarged Process Piping Plan <br /> 40-058-M484-59.20R Removal — Enlarged Process Piping Plan 04.0219 <br /> 40—YD-0510-01 Phase II — Site Details 04.02.19 40-058—M484-59.20a Enlarged Process Piping Plan 09.19.17 , <br /> 40-058-M484-5955R Removal — Enlarged Process Piping Plan 04.02.19 <br /> 40-058-M484-59.55a Enlarged Process Piping Plan 09.19.17 <br /> 40-058—M550-3.1 a Enlarged Plumbing Plans 08.08.17 <br /> 40-058-M551-1.1 a HVAC Sections 04.02.19 <br /> i _ i <br /> 40-058—M551-1.2a HVAC Sections 06.19.18p <br /> 40-058—M551-1.3a HVAC Sections 04.02.19 www.brph.corn Copyright 0 2017 <br /> 40-058—M551-1.4 HVAC Sections 12.01.16 Architects, Engineers, Constructors <br /> 19020 33rd W,Suite State of Washington <br /> Ave 5 <br /> 40-058—M551-1.4a HVAC Sections 06.19.18 Lynnwood,Ave W, 035 Certificate of Authorization <br /> Washington, <br /> 40-058—M551-3.1 a Plumbing Sections 04.10.18 425-921-3500 Engineering No.603235512/ <br /> Engineering No.3137 <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE <br /> 03.19.2018 ACCEPTABILITY CAG 04.02.2019 <br /> THIS DESIGN AND/OR CHECKED SHEET INDEX W2548317 04.02.2019 <br /> SPECIFICATION IS APPROVED KML 04.02.2019 SHEET <br /> ENGINEER TITLE � <br /> 4E7 17/1sr,ov if <br /> ® APPROVED BY DEPT. DATE KML 04.02.2019 BOEING 777X CWC BUILDING G 1 7 <br /> CHECKED <br /> t <br /> APPROVED BUILDING 40 58 <br /> JOB NO. COMP NO. <br /> i <br /> APPROVED GENERAL MASTER EVEREI I, WA DWG NO. 40-058-G4q <br />
The URL can be used to link to this page
Your browser does not support the video tag.