Laserfiche WebLink
:c: <br /> GENERAL <br /> 4 )4 --\ - <br /> �— FOR DOUBLE SIDED SHEARWALLS, I . ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE CONTRACT DRAWINGS. *.'. 'C5' <br /> THE SHEATHING ON EACH FACE <br /> HOEDOWN POST. SEE G , , 4 <br /> HOEDOWN SCHEDULE OR LENGTH OF MUST EXTEND CONTINUOUS 2. DURING THE CONSTRUCTION PERIOD THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFETY OF THE 0 N <br /> PLAN FOR MINIMUM SHEARWALL BETWEEN hOLDOWN POSTS AS BUILDING. THE CONTRACTOR SHALL PROVIDE ADEQUATE SHORING, BRACING AND GUYS IN ACCORDANCE WITH <br /> REQUIREMENTS SHOWN. ALL NATIONAL, STATE AND LOCAL SAFETY ORDINANCES. ANY DEVIATION MUST BE APPROVED PRIOR TO 0 <br /> ERECTION. <br /> t ro 0 <br /> l <br /> `' — - - ---_— -- 3. ALL ERECTION PROCEDURES SHALL CONFORM TO OSHA STANDARDS. ANY DEVIATION MUST BE APPROVED n <br /> OPENING PER PLAN ..\ BY OSHA PRIOR TO ERECTION. Q.) <br /> ;)I\ <br /> -"\ <br /> A 11- <br /> 4. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION PROCEDURES INCLUDINGcz <br /> LOCATION OF HOEDOWN STHD 14RJ LAGGING, SHORING AND PROTECTION OF ADJACENT PROPERTY, STRUCTURES, STREETS AND UTILITIES IN v <br /> TO BE INSTALLED �� ACCORDANCE WITH ALL NATIONAL, STATE AND LOCAL SAFETY ORDINANCES. 0 N <br /> TYPE OF hOLDOWN TO BE <br /> w � 11") <br /> INSTALLED 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK OF ALL TRADES AND SHALL CHECK > N <br /> ALL DIMENSIONS. ALL DISCREPANCIES SHALL BE CALLED TO THE ATTENTION OF THE ENGINEER AND BE — Q C E <br /> ShEARWALL DESIGNATION - SEE ShEARWALL RESOLVED BEFORE PROCEEDING WITH THE WORK. O = m O <br /> SCHEDULE FOR FRAMING, NAILING AND © Q = Ill — U <br /> LATERAL MARKING LEGEND ANCHORAGE REQUIREMENTS 7. DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION. WHERE CONDITIONS ARE NOT $ it <br /> w N <br /> SPECIFICALLY INDICATED BUT ARE OF SIMILAR CHARACTER TO DETAILS SHOWN, SIMILAR DETAILS OF ° ° ° w 2 - <br /> CONSTRUCTION SHALL BE USED SUBJECT TO REVIEW BY THE ENGINEER. ° �i ° a ° ° ° ° �' to < co L <br /> ° ., <br /> g ° <br /> 8. ALL DETAILS DESIGNATED AS STANDARD OR TYPICAL SHALL OCCUR IN ADDITION TO ANY OTHER SPECIFIC ° ' ° ° ° " ° .a ° ° ° tu O N �? <br /> DETAIL CALLED OUT. ° <br /> 3 <br /> CZ ° CO O <br /> 9. COORDINATE WITH MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR SIZE AND LOCATION OF ALL 0 DOUBLE TOP PLATE W/ EDGE NAILING (STAGGER) © HOEDOWN PER SCHEDULE N > co <br /> hOLDOWN SCHEDULE OPENINGS REQUIRED FOR DUCTS, PIPES, PIPE SLEEVES, ELECTRICAL CONDUITS, AND OTHER ITEMS TO BE © ShEARWALL EDGE NAILING AT ALL PANEL EDGES. AND PLAN (HDQ8-SD53 M LL' in <br /> N <br /> EMBEDDED IN CONCRETE OR OTHERWISE INCORPORATED IN STRUCTURAL WORK. BLOCKING AT ALL PANEL EDGES WHERE SHOWN) '� <br /> FOR HOLDOWNS INSTALLED IN NEW FOUNDATIONS APPLICABLE. 8COORDINATE ALL STUD AND U u , <br /> 1 1 . ARCHITECTURAL AND MECHANICAL PLANS ARE CONSIDERED A PART OF THE STRUCTURAL DESIGN DRAWINGS EDGE NAILING TO NOLDOWN POST (FULL PLATE SIZES w/ SHEARWALL L z <br /> ANCHOR THRU BOLTS OR MIN WOOD MINIMUM END AND ARE TO BE USED TO DEFINE DETAIL CONFIGURATIONS INCLUDING; BUT NOT LIMITED TO RELATIVE LOCATION © HEIGHT) STAGGER INTO DOUBLE STUDS SCHEDULE REQUIREMENTS --N O <br /> MODEL MEMBER EMBEDMENT EDGE OF MEMBERS, ELEVATIONS, DIMENSIONS AND LOCATIONS OF ALL OPENINGS, ETC. _ <br /> BOLT NAILS/SCREWS THICKNESS DIST. LENGTH © STUDS @ 16" ON CENTER C� a- <br /> 12. ALL INFORMATION SHOWN ON THE DRAWINGS RELATIVE TO EXISTING CONDITIONS IS GIVEN AS THE BEST O PRESSURE TREATED SILL PLATE WITH EDGE J� EDGE NAILING TO POSTS, <br /> PRESENT KNOWLEDGE BUT WITHOUT GUARANTEE OF ACCURACY. WHERE ACTUAL CONDITIONS CONFLICT WITH TRIM STUDS, AND KING <br /> SThD 14/RJ - (24) 16d SINKERS 14" 1y2" THE DRAWINGS, THEY SHALL BE REPORTED TO THE ENGINEER SO THAT THE PROPER REVISIONS MAY BE MADE. NAILING AND ANCHOR BOLTS PER SHEARWALL o STUDS <br /> MODIFICATION TO DETAILS OF CONSTRUCTION SHALL NOT BE MADE WITHOUT PRIOR WRITTEN APPROVAL OF SCHEDULE. <br /> hDU2-SD52.5 5/s" ( I 0) SDS/q."x2%2" 3" THE ENGINEER. > <br /> TOP PLATE SPLICE NAILING TO BE (8) 16d K BEARING STUD FOR <br /> SINKERS (MIN). LAP 48 MINIMUM. CENTER HEADER <br /> EV <br /> CS 14 (30) I Od 16° SPLICE ON STUD. <br /> 0 <br /> STD . ShEARWALL ELEVATION m <br /> STHD I 0/RJ (20) 16d SINKERS 10" lye" RIM <br /> W/O <br /> Q <br /> LSTHDB/RJ ( I 6) 1 6d SINKERS 8" 14" o <br /> p <br /> z <br /> hOLDOWN NOTES <br /> WALL PER PLAN ` <br /> I . ALL-THREAD BOLTS SHALL CONFORM TO ASTM A307. A Q <br /> SILL PLATE AND ANCHOR BOLTS PER (2) LAYERS OF 90# FELT 1 <br /> 2. MINIMUM CONCRETE COMPRESSIVE STRENGTH f'c = 2500 PSI. MINIMUM WALL THICKNESS IS 8". 11 SHEARWALL SCHEDULE. (USE 2x6 P.T. SILL OR EQUIVALENT <br /> PLATE W/ 5/8" 0 J-BOLTS @ .48" O/C MIN ) <br /> 3. ALL HOLDOWNS REQUIRE A (2) 2x DF#2 POST UNLESS NOTED OTHERWISE. WHERE HOLDOWNS ARE © SLAB PER PLAN <br /> INSTALLED INTO THE WIDE FACE OF THE STUD, STUDS MUST BE STITCH NAILED TOGETHER w/ 16d SINKERS ILI _ <br /> STAGGERED @ 4" o/c. Qi © BACKFILL W/ POROUS . D O <br /> MATERIAL (lYP) r D Z CV <br /> 4. MINIMUM EDGE DISTANCE 15 FOR FORMED CONCRETE EXPOSED TO WEATHER OR SOIL. FOR CONCRETE J I <br /> :m V <br /> co <br /> CZ > 05 <br /> CAST AGAINST SOIL PROVIDE 3" CLEAR TO ANCHOR BOLT. ( -DiiiiiiM <br /> , _ _;) . , „L:::_ „__ < Q g <br /> 5. NAILS SCREWS TO hOLDOWN POST SHALL BE PER MANUFACTURER'S SPECIFICATIONS. I „t' <br /> _, „__ , co 0 . <br /> G. WHEN FIELD CONDITION BECOME LESS THAN MINIMUM SHOWN, CONTACT ENGINEER PRIOR TO PROCEEDING. o Q W Co w <br /> 7. ALL HOEDOWN BOLTS MUST BE RE-TIGHTENED JUST PRIOR TO ENCLOSING SECOND SIDE OF WALL. p = (5) W <br /> Ez CMI U — W <br /> 5. hOLDOWNS MAY BE ATTACHED TO EXISTING CONCRETE USING SIMPSON 'SET-XP' HIGH STRENGTH EPDXY. ``- = PER PLAN <br /> G, W , <br /> SIZE AND EMBED PER CHART. ICBO REPORT NO. ER-5279. DRILL ANCHOR BOLT HOLES 4" LARGER THAN '~ u <br /> I <br /> ANCHOR BOLT DIAMETER. `' Q 4" 0 PERFORATED PLASTIC PIPE. CENTER IN <br /> PER PLAN <br /> E , ONE CUBIC FOOT OF FREE DRAINING GRAVEL PER SCHEDULE <br /> I AND DRAIN TO APPROVED OUTFACE. <br /> - 4' AL.• t , . , i <br /> 4 r _________T_ <br /> NDN/ ShEARWALL CONN . <br /> p a ° Z <br /> 1— °ez <br /> sCOVI <br /> n, <br /> • <br /> z ® DOUBLE `0' . ��TE EDGE ;~,'LING (STAGGER) HOLD011,"; F`? SCHEDULE AND . 4 <br /> PLAN (HD05-5D53 SHOWN) o ;4 / <br /> �'� - <br /> E* I7i 11111-1-----------_- 4 _ _ a , ' <br /> ! CLEAR SPAN © SHEAR�'J� __ ,\AILI';G A� ALL PANEL EDGES. ��, COORDI';ATE rLl STUD AND PLATE HOEDOWN PER PLAN �� <br /> • <br /> " MAXIMUM BLOCKING �-.` ALL PANEL EDGES �.'VHERE SIZES �.:,` 5='ErR'.'.'r.l L SCHEDULE F4 01? ., <br /> APPLICABLE. REQUIREMENTS <br /> LATERAL p;,�LY <br /> ' © EDGE NAILING TO HOLDO.'.'; POST (FULL <br /> `� 1000r. <br /> 30" MIN ' •_ <br /> 30" min. II HEIGHT) STAG;=? INTO �0::_,LE STUDS EDGE Nr,'Li':G TO POSTS, TRIM �:REBAR _ �.-� CIE <br /> REBAR ;I <br /> / LENGTHN STUDS @ e 0'. C_,; ER STUDS. AND K,.G 5TUDS LTP4 PER Drawn By: DP <br /> LENGTH <br /> 0 PRESSURE TR=�`ED 5'LL P_,;TE WITH EDGE < , = SHEARWALL SCHEDULE Checked B CCC ° <br /> y <br /> BEARING STUD O � HEADER In ANCHOR PER HOEDOWN SCHEDULE Date: 02-09- 17 <br /> ONE #4 REBAR ONE #4 REBAR NAILING AND r,':G"0� BOLTS PER SHEARI':,;!L JOISTS <br /> I IN SHEAR CONE ifil IN SHEAR CONE ,., <br /> N ° v ( I 2" MINAso, - REBAR k • ( I 2" MIN. REBAR SCHEDULE. ® RIMJOIST TO BE It MIN PER PLAN " <br /> .► �r ®TOP PLATE S'L'CE ' 'r-.'L!';G TO BE (8) 16d 5,':FRS THICKNESS AT A_L S`IEARWALLS 4x4x� SDA JOB NO. <br /> LENGTH) LENGTH) (M1N). LAP 48 CENTER SPLICE O. 5T[ D. F <br /> I/2" MIN. h55 SECTION BEARING PLATE <br /> FROM CORNER 1/2" MIN. Q 7 <br /> FROM CORNER0 `J " <br /> STD . Sh EARWALL ELEVATION r 1-1OLDOWN ABOVE I-155 ' <br /> 'SThD' INSTALLATION 'SThD' INSTALLATION WI RIM 10 STRUCTURAL <br /> 0 �, SECTION <br /> W/O RIM W/ RIM <br /> NOTES/DETAILS <br /> .r 5 - 2 <br /> . 0 ' - <br /> 36x24 (Arch D) <br />